DLAD PART 52 – SOLICITATION PROVISIONS AND CONTRACT CLAUSES



PART 52 – SOLICITATION PROVISIONS AND CONTRACT CLAUSES

TABLE OF CONTENTS

(Revised February 17, 2017 through PROCLTR 2017-10)

SUBPART 52.1 – INSTRUCTIONS FOR USING PROVISIONS AND CLAUSES

52.101 Using Part 52.

SUBPART 52.2 – TEXTS OF PROVISIONS AND CLAUSES

52.200 Scope of subpart.

52.204-9000 Contractor Personnel Security Requirements.

52.213-9001 Evaluation Factor for Source Inspection.

52.213-9008 Automated Contract Evaluation System.

52.213-9010 Indefinite Delivery Purchase Order (IDPO) Evaluation.

52.213-9011 Indefinite Delivery Purchase Order (IDPO) Agreement.

52.213-9012 Indefinite Delivery Purchase Order (IDPO) Contract.

52.216-9000 Implementation of FAR 52.216-2 Economic Price Adjustment—Standard Supplies.

52.216-9002 Implementation of FAR 52.216-4 Economic Price Adjustment—Labor and Material.

52.216-9006 Addition/Deletion of Items.

52.216-9008 Offeror’s Quantity Limitations.

52.216-9012 Economic Price Adjustment – For Unitized Group Rations (UGR) – A Components -

Actual Material Costs.

52.216-9013 Evaluation of Offers for Indefinite Delivery Type Solicitations.

52.216-9014 Area Requirements – Tentative Destinations.

52.216-9015 Area Requirements – Contiguous United States (CONUS).

52.216-9019 Area Requirements – East and West of Mississippi.

52.216-9022 Placement of Task/Delivery Orders Against Multiple Indefinite Delivery Contracts.

52.216-9026 Pricing of Delivery Orders with Quantity Increments.

52.216-9027 Evaluation of Quantity Sensitive and Indefinite Delivery Contracts.

52.216-9028 Economic Price Adjustment Labor and Material.

52.216-9029 Economic Price Adjustment Lead, Battery Consignment Program.

52.216-9030 Economic Price Adjustment – Department of Labor Price Index.

52.216-9032 Economic Price Adjustment (EPA) – Established Market Price.

52.216-9032 Economic Price Adjustment (EPA) – Established Market Price Alternate I.

52.216-9032 Economic Price Adjustment (EPA) – Established Market Price – Milk Alternate II.

52 216-9032 Economic Price Adjustment (EPA) – Established Market Price – Milk Alternate III.

52.216-9033 Economic Price Adjustment – Established Prices.

52.216-9034 Economic Price Adjustment – Published Market Price - Silver.

52.216-9035 Economic Price Adjustment – Published Market Price - Lead.

52.216-9036 Evaluation of Offers - Economic Price Adjustment.

52.216-9037 Evaluation of Bids - Economic Price Adjustment.

52.216-9038 Price Redetermination – Prospective (DEVIATION - PERMANENT).

52.216-9039 Economic Price Adjustment – Standard Supplies Deviation.

52.216-9043 Economic Price Adjustment – Federal Supply Schedule Prices.

52.216-9046 Economic Price Adjustment – Other Federal Agency Contracts – E-CAT.

52.216-9054 Economic Price Adjustment – Polymeric Traypack Ration.

52.216-9058 Economic Price Adjustment (EPA) – Established Market Price – Wool Cloth.

52.216-9059 Economic Price Adjustment – Meal Cold Weather/Long Range Patrol (MCW/LRP).

52.216-9060 Economic Price Adjustment – Meal Ready to Eat (MRE) Assembly.

52.216-9061 Economic Price Adjustment (EPA) Table Spreads.

52.216-9062 Economic Price Adjustment (EPA) Unitized Group Ration (UGR).

52.216-9063 Economic Price Adjustment – Tailored Operational Training Meal (TOTM).

52.216-9065 Economic Price Adjustment – Actual Material Costs for Subsistence Product Price

Business Model.

52.216-9066 Economic Price Adjustment – Market Prices – DLA Distribution.

52.216-9067 Economic Price Adjustment - Liquid Propane Gas – DLA Distribution.

52.216-9068 Economic Price Adjustment – Published Market Price – Electricity – Heat Rate.

52.216-9069 Economic Price Adjustment – Published Market Price – Domestic Bulk.

52.216-9070 Economic Price Adjustment – Daily Market Price Indicators (Ships’ Bunkers).

52.216-9075 Economic Price Adjustment – Published Market Price – Ships Bunkers.

52.216-9083 Restitution.

52.216-9084 Economic Price Adjustment – National Contracts – Subsistence.

52.216-9085 Economic Price Adjustment – DLA Multiple Award Schedule Contracts.

52.217-9002 Conditions for Evaluation and Acceptance of Offers for Part Numbered Items.

52.217-9006 Surge and Sustainment (S&S) Investments.

52.217-9007 Surge and Sustainment (S&S) Instructions to Offerors.

52.217-9008 Surge and Sustainment (S&S) Evaluation.

52.217-9009 Surge and Sustainment (S&S) Pricing.

52.217-9010 Limitations on Use of Surge and Sustainment (S&S) Government Investment.

52.217-9011 Provisioning.

52.217-9012 Warstopper Program Material Buffer Availability.

52.217-9017 Tailored Logistics Support Purchasing Reviews.

52.217-9018 Supply Assurance Through Multisource Contracting.

52.217-9020 Corporate Contract Fill Rate and Unfilled Orders.

52.217-9023 Restriction of Alternate Offers for Source Controlled Items.

52.219-9004 Small Business Program Representations.

52.219-9008 Combined Historically Underutilized Business Zone (HUBZone)/

Small Business Set-Aside Instructions – Type 1.

52.219-9009 Combined HUBZone/Small Business Set-Aside Instructions – Type 2.

52.219-9013 Combined Set-Aside Instructions – Type 1.

52.219-9014 Combined Set-Aside Instructions – Type 2.

52.232-9006 Transporter Proof of Delivery (TPD).

52.233-9001 Disputes: Agreement to Use Alternate Disputes Resolution (ADR).

52.237-9003 Site Visit Coordinator.

52.247-9001 Port Handling and Ocean Costs in Bid Evaluation.

52.247-9011 Vendor Shipment Module (VSM).

52.247-9036 Shipping Instructions (Export).

52.247-9054 Computation of Cube – Wood Products.

52.247-9059 F.o.b. Origin, Government-Arranged Transportation.

SUBPART 52.1 – INSTRUCTIONS FOR USING PROVISIONS AND CLAUSES

52.101 Using Part 52.

(b) Numbering.

(2) Provisions or clauses that supplement Federal Acquisition Regulations (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS).

(ii) Only those provisions and clauses in this directive that are codified are preceded by an assigned CFR chapter number.

(B) See 1.301-91(c).

SUBPART 52.2 – TEXTS OF PROVISIONS AND CLAUSES

(Revised February 17, 2017 through PROCLTR 2017-10)

52.200 Scope of subpart.

This subpart sets forth the texts of all Defense Logistics Acquisition Directive (DLAD) provisions and clauses, and for each provision and clause, gives a cross-reference to the location in the DLAD that prescribes its use.

52.204-9000 Contractor Personnel Security Requirements.

As prescribed in 4.1303-90, insert the following clause:

CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)

(a) Work to be performed under this contract or task order may, in full or in part, be performed at the Defense Logistics Agency (DLA) Headquarters (HQ), DLA field activity office(s), or other Federally-controlled facilities. Prior to beginning work on a contract, DLA requires all Contractor personnel working on the Federally-controlled facility to have, at a minimum, an initiated National Agency Check with Written Inquiries (NACI) or NACI equivalent and favorable completion of a Federal Bureau of Investigation (FBI) fingerprint check.

(b) Additionally, in accordance with Department of Defense (DoD) Regulation 5200.2-R, Personnel Security Programs, and DLA Issuance 4314, Personnel Security Program, all DoD Contractor personnel who have access to Federally-controlled information systems must be assigned to positions which are designated at one of three information technology (IT) levels, each requiring a certain level of investigation and clearance, as follows:

(1) IT-I for an IT position requiring a single scope background investigation (SSBI) or SSBI equivalent;

(2) IT-II for an IT position requiring a National Agency check with Law and Credit (NACLC) or NACLC equivalent; and

(3) IT-III for an IT position requiring a NACI or equivalent.

Note: IT levels will be designated according to the criteria in DoD 5200.2-R.

(c) Previously completed security investigations may be accepted by the Government in lieu of new investigations if determined by the DLA Intelligence Personnel Security Office to be essentially equivalent in scope to the contract requirements. The length of time elapsed since the previous investigation will also be considered in determining whether a new investigation is warranted. To assist the Government in making this determination, the Contractor must provide the following information to the respective DLA Intelligence Personnel Security Office immediately upon receipt of the contract. This information must be provided for each Contractor employee who will perform work on a Federally-controlled facility and/or will require access to Federally-controlled information systems:

(1) Full name, with middle name, as applicable, with social security number;

(2) Citizenship status with date and place of birth;

(3) Proof of the individual’s favorably adjudicated background investigation or NACI, consisting of identification of the type of investigation performed, date of the favorable adjudication, name of the agency that made the favorable adjudication, and name of the agency that performed the investigation;

(4) Company name, address, phone and fax numbers with email address;

(5) Location of on-site workstation or phone number if off-site (if known by the time of award); and

(6) Delivery order or contract number and expiration date; and name of the Contracting Officer.

(d) The Contracting Officer will ensure that the Contractor is notified as soon as a determination is made by the assigned or cognizant DLA Intelligence Personnel Security Office regarding acceptance of the previous investigation and clearance level.

(1) If a new investigation is deemed necessary, the Contractor and Contracting Officer will be notified by the respective DLA Personnel Security Office after appropriate checks in DoD databases have been made.

(2) If the Contractor employee requires access to classified information and currently does not have the appropriate clearance level and/or an active security clearance, the DLA Intelligence Personnel Security Office will relay this information to the Contractor and Contracting Officer for further action. Investigations for Contractor employees requiring access to classified information must be initiated by the Contractor Facility Security Officer (FSO).

(3) The Contracting Officer will ensure that the respective DLA Intelligence Personnel Security Office initiates investigations for Contractor employees not requiring access to classified information (i.e., IT or unescorted entry).

(4) It is the Contractor’s responsibility to ensure that adequate information is provided and that each Contractor employee completes the appropriate paperwork, as required either by the Contracting Officer or the DLA Intelligence Personnel Security Office, in order to begin the investigation process for the required clearance level.

(e) The Contractor is responsible for ensuring that each Contractor employee assigned to the position has the appropriate security clearance level.

(f) The Contractor shall submit each request for IT access and investigation through the Contracting Officer to the assigned or cognizant DLA Intelligence Personnel Security Office. Requests shall include the following information and/or documentation:

(1) Standard Form (SF) 85, Questionnaire for Non-Sensitive Positions, or the SF 86, Questionnaire for National Security Positions (see note below);

(2) Proof of citizenship (i.e., an original or a certified copy of a birth certificate, passport, or naturalization certificate); and

(3) Form FD-258, Fingerprint Card (however, fingerprinting can be performed by the cognizant DLA Intelligence Personnel Security Office).

(Note to (f)(1) above: An investigation request is facilitated through use of the SF 85 or the SF 86. These forms with instructions as well as the Optional Form (OF) 306, Declaration for Federal Employment, which is required with submission of the SF85 or SF 86, are available at the Office of Personnel Management’s (OPM) system called Electronic –Questionnaires for Investigations Processing (e-QIP). Hard copies of the SF85 and SF86 are available at OPM’s web-site, www.opm.gov, but hard copies of the forms are not accepted.)

(g) Required documentation, listed above in paragraphs (f) (1) through (3), must be provided by the Contractor as directed by the Contracting Officer to the cognizant DLA Intelligence Personnel Security Office at the time of fingerprinting or prior to the DLA Intelligence Personnel Security Office releasing the investigation to OPM.

(h) Upon completion of the NACI, NACLC, SSBI, or other sufficient, appropriate investigation, the results of the investigation will be forwarded by OPM to the appropriate adjudication facility for eligibility determination or the DLA Intelligence Personnel Security Office for review and determination regarding the applicant’s suitability to occupy an unescorted entry position in performance of the DLA contract. Contractor personnel shall not commence work on this effort until the investigation has been favorably adjudicated or the Contractor employee has been waived into the position pending completion of adjudication. The DLA Intelligence Personnel Security Office will ensure that results of investigations will be sent by OPM t to the Department of Defense, Consolidated Adjudications Facility (DoD CAF) or DLA Intelligence Personnel Security Office.

(i) A waiver for IT level positions to allow assignment of an individual Contractor employee to commence work prior to completion of the investigation may be granted in emergency situations when it is determined that a delay would be harmful to national security. A request for waiver will be considered only after the Government is in receipt of the individual Contractor employee’s completed forms, the background investigation has been initiated and favorable FBI fingerprint check has been conducted. The request for a waiver must be approved by the Commander/Director or Deputy Commander/Director of the site. The cognizant DLA Intelligence Personnel Security Office reserves the right to determine whether a waiver request will be forwarded for processing. The individual Contractor employee for which the waiver is being requested may not be assigned to a position, that is, physically work at the Federally-controlled facility and/or be granted access to Federally-controlled information systems, until the waiver has been approved.

(j) The requirements of this clause apply to the prime Contractor and any subcontractors the prime Contractor may employ during the course of this contract, as well as any temporary employees that may be hired by the Contractor. The Government retains the right to request removal of Contractor personnel, regardless of prior clearance or adjudication status whose actions, while assigned to this contract, who are determined by the Contracting Officer to conflict with the interests of the Government. If such removal occurs, the Contractor shall assign qualified personnel, with the required investigation, to any vacancy.

(k) All Contractor personnel who are granted access to Government and/or Federally-controlled information systems shall observe all local automated information system (AIS) security policies and procedures. Violations of local AIS security policy, such as password sharing, performing personal work, file access violations, or browsing files outside the scope of the contract, will result in removal of the Contractor employee from Government property and referral to the Contractor for appropriate disciplinary action. Actions taken by the Contractor in response to a violation will be evaluated and will be reflected in the Contractor’s performance assessment for use in making future source selection decisions. In addition, based on the nature and extent of any violations of AIS security policy, the Government will consider whether it needs to pursue any other actions under the contract such as a possible termination.

(l) The Contractor may also be required to obtain a Common Access Card (CAC) or Installation Access Badge for each Contractor employee in accordance with procedures established by DLA. When a CAC is required, the Contracting Officer will ensure that the Contractor follows the requirements of Homeland Security Presidential Directive 12 and any other CAC-related requirements in the contract. The Contractor shall provide, on a monthly basis, a listing of all personnel working under the contract that have CACs.

(m) Contractor personnel must additionally receive operations security (OPSEC) and information security (INFOSEC) awareness training. The DLA annual OPSEC refresher training and DLA annual INFOSEC training will satisfy these requirements and are available through the DLA Intelligence Office.

(n) When a Contractor employee who has been granted a clearance is removed from the contract, the Contractor shall provide an appropriately trained substitute who has met or will meet the investigative requirements of this clause. The substitute may not begin work on the contract without written documentation, signed by the Contracting Officer, stating that the new Contractor employee has met one of the criteria set forth in paragraphs (c), (d), or (i) of this clause, (i.e., acceptance of a previously completed security investigation, satisfactory completion of a new investigation, or a waiver allowing work to begin pending completion of an investigation). Contractor individual employees removed from this contract as a result of a violation of local AIS security policy are removed for the duration of the contract.

(o) The following shall be completed for every employee of the Government Contractor working on this contract upon contract expiration. Additionally, the Contractor shall notify the contracting officer immediately in writing whenever a Contractor employee working on this contract resigns, is reassigned, is terminated or no longer requires admittance to the Federally-controlled facility or access to Federally-controlled information systems. When the Contractor employee departs, the Contractor will relay departure information to the cognizant DLA Intelligence Personnel Security Office and the Trusted Agent (TA) that entered the individual into the Trusted Associated Sponsorship System (TASS), so appropriate databases can be updated. The Contractor will ensure each departed employee has completed the DLA J6 Out-Processing Checklist, when applicable, for the necessary security briefing, has returned any Government-furnished equipment, returned the DoD CAC and DLA (or equivalent Installation) badge, returned any DoD or DLA vehicle decal, and requested deletion of local area network account with a prepared Department of Defense (DD) Form 2875. The Contractor will be responsible for any costs involved for failure to complete the out-processing, including recovery of Government property and investigation involved.

(p) These Contractor security requirements do not excuse the Contractor from meeting the delivery schedule/performance requirements set forth in the contract, or waive the delivery schedule/performance requirements in any way. The Contractor shall meet the required delivery schedule/performance requirements unless the contracting officer grants a waiver or extension.

(q) The Contractor shall not bill for personnel, who are not working on the contract while that Contractor employee’s clearance investigation is pending.

(End of Clause)

52.213-9001 Evaluation Factor for Source Inspection.

As prescribed in 13.106-90(a) and 15.304(c)(S-93), insert the following provision:

EVALUATION FACTOR FOR SOURCE INSPECTION (NOV 2011)

This solicitation contemplates an award based on destination inspection. However, source inspection will be required for those quoters/offerors to whom formal notification thereof has been issued prior to the closing date for receipt of offers under this solicitation. An evaluation factor of $250 will be added to the quoted/offered price for each source inspection required, for purposes of determining the most advantageous offer received, price and other factors considered. Quotes/ offers contingent on source inspection/acceptance and/or free on board (f.o.b.) origin may be considered technically unacceptable; if the quote/offer is evaluated, the $250 evaluation factor will be applied for each source inspection required. Nothing in this provision affects the right of the Government to perform or waive source inspection on any resultant order/contract. If phased deliveries are required or offered, each phase of delivery will be presumed to result in one inspection.

(End of Provision)

Alternate I. Evaluation Factor for Source Inspection. As prescribed in 13.106-90(a) insert the following provision.

EVALUATION FACTOR FOR SOURCE INSPECTION ALTERNATE I (NOV 2011)

(a) If the quote or offer is evaluated in accordance with Defense Logistics Acquisition Directive (DLAD) provision 52.213-9001, in Section M, an evaluation factor will be added to the offeror's quoted price for each source inspection.

(b) This solicitation is intended to result in the award of a contract under which multiple orders may be placed. For evaluation purposes, it is anticipated that delivery orders will be issued. The evaluation factor will be applied based on a presumption that each order issued under this contract will result in a source inspection.

(End of Provision)

52.213-9008 Automated Contract Evaluation System.

As prescribed in 13.106-2(b)(S-90)(i), insert the following provision:

AUTOMATED CONTRACT EVALUATION SYSTEM (SEP 2016)

(a) Automated contract evaluation: Acquisitions are candidates for automated award under automated contract evaluation systems when the solicitation states that automated contract evaluation systems apply. The program uses price logic and other automated filters to make fully-automated and contracting officer -assisted automated awards valued at the simplified acquisition threshold or less. A purchase order with a “V” in the ninth position denotes an order issued under an automated contract evaluation system, which only considers “qualified quotes” for award. Qualified quotes are in exact compliance with the solicitation requirements (bid type equal to “bid without exception”), and are submitted on the Defense Logistics Agency’s Internet Bid Board System (DIBBS).

(1) The following are not, by themselves, considered exceptions to the solicitation requirements and will not make a quote ineligible** for an award:

(i) Quoting delivery days different than the required delivery days;

(ii) **Quoting origin inspection on solicitations requiring destination inspection;

(iii) Quoting a superseding or previously approved part or correction to a commercial and Government entity (CAGE)/part number cited in the acquisition identification description (AID) on an item described by manufacturer’s CAGE and part number;

(iv) Quoting a used, reconditioned, remanufactured item;

(v) Quoting other than a domestic end product on an unrestricted solicitation;

(vi) Quoting a hazardous item;

(vii) Quoting a new/unused Government surplus item; and

(viii) Quoting “Other” when the solicitation states a higher level quality requirement is required.

Note: The Department of Defense is implementing a policy that limits Government source inspections and permits Government source inspection for specific instances. Suppliers should submit quotes based on the requirements stated in the solicitation. If a supplier’s quote does not comply with the requirements stated in the solicitation, evaluation factors will be applied. See paragraph (b)(1) below. Additionally, should a quote citing origin inspection for a solicitation requiring destination inspection be evaluated manually, the quote may become ineligible for award.

(2) The following are considered exceptions to the solicitation requirements and will make a quote ineligible for a fully-automated award:

(i) Quoting an alternate product or otherwise taking exception to the solicitation’s item description;

(ii) Exceptions to packaging requirements;

(iii) Exceptions to free on board (f.o.b.) terms;

(iv) Quoting destination inspection on a solicitation requiring origin inspection;

(v) Exceptions to required quantity;

(vi) Quoting a quantity variance greater than what is specified on the solicitation;

(vii) Quoting “None” when a higher level quality requirement is required; and

(viii) Quoting the use of child labor.

(b) Evaluation factors: All qualified quotes are evaluated on the basis of price alone. Quantity price breaks are not considered. Price evaluation factors are added to the total quoted price in the following instances:

(1) $250 for quoting origin inspection when the Government’s requirement is for destination inspection (see Defense Logistics Acquisition Directive (DLAD) clause 52.213-9001; factor does not apply to Foreign Military Sales (FMS) and Direct Vendor Delivery (DVD) requirements if any qualified quote is above $25,000);

(2) $200 for quoting surplus material on non-critical items; $700 for quoting surplus material on critical items. When an automated quote of surplus material is in line for award after applying the above evaluation factors, a manual evaluation will be conducted in accordance with the more detailed evaluation criteria in 52.211-9003; and

(3) The Buy American Act (BAA) places restrictions on the purchase of supplies that are not domestic end products. Refer to Defense Federal Acquisition Regulation Supplement (DFARS) 252.225-7001 or 252.225-7036, as applicable. .

(c) Tie quotes: If evaluated offers results in a tie between qualified quotes, the award decision will be based on the following order of precedence:

(1) A domestic end product offer over a non-qualifying country end product offer;

(2) Small business offer over a large business offer;

(3) Offer with the shortest delivery (if a quote contains different deliveries for multiple line items the automated evaluation program uses the average of the delivery periods); and

(4) First quote submitted.

(d) Manual evaluation: If the solicitation did not state that it was a candidate for automated evaluation, or if the solicitation stated that it was a candidate for automated evaluation but the automated evaluation system is unable to make price reasonableness or Contractor responsibility determinations, the solicitation and quote will be evaluated and awarded manually. When a quote is manually evaluated the Contracting Officer may consider quantity price breaks offered without further solicitation or discussion.

(e) Manual evaluation factors: If the requirement is evaluated manually, price, delivery, and past performance will be considered in accordance with the terms in the solicitation. Delivery will be considered consistent with 52.211-9011.

(f) Alternate offers: Alternate offers will not be considered for automated award. Alternate offers may be submitted for evaluation for future procurements to the location identified in procurement notes L04 and M06.

(g) Notice of award: The Government’s offer to purchase, as evidenced by an order, is made on the basis of a submitted quotation. Suppliers are requested to notify the administrative Contracting Officer, within 14 days after receiving the notice of award, when they will not perform in accordance with an order. Failure to provide prompt notice will adversely affect your past performance evaluation if this order is later cancelled at other than the Government’s request.

(h) Award distribution: The award will be posted to the DLA DIBBS web site and distributed via email notification with a Web link to an electronic copy of the DD Form 1155, Order for Supplies or Services. Orders will be transmitted via Electronic Data Interchange (EDI) to Contractors who are EDI-capable. Contractors that are not EDI-capable will receive their orders via email award notification containing Web links. Delays in the receipt of awards that are caused by email interruptions and Internet access are not excusable delays and will not extend delivery schedules.

(End of Provision)

52.213-9010 Indefinite Delivery Purchase Order (IDPO) Evaluation.

As prescribed in 13.390(d)(1), insert the following clause:

INDEFINITE DELIVERY PURCHASE ORDER (IDPO) EVALUATION (SEP 2012)

(a) The Government will award an IDPO resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the terms and conditions within the RFQ will be most advantageous to the Government, price and/or other factors specified elsewhere in this solicitation considered. Evaluation of prices will be based on the estimated annual demand, as stated in the schedule.

(b) Failure to agree to the IDPO clause included in this request for quotes will affect the award decision for the solicited quantity, in that any offer received that fails to agree to an indefinite delivery purchase order maybe rejected as technically unacceptable.

(End of Clause)]

52.213-9011 Indefinite Delivery Purchase Order (IDPO) Agreement - Unilateral.

As prescribed in 13.390(d)(2), insert the following clause:

INDEFINITE DELIVERY PURCHASE ORDER (IDPO) AGREEMENT – UNILATERAL

(APR 2014)

(a) The Government will award a unilateral indefinite delivery purchase order (IDPO) agreement resulting from this request for quotes to the responsible offeror whose offer conforming to the IDPO terms and conditions will be most advantageous to the Government, price and/or other factors considered.

(b) The Contractor agrees that he/she will accept additional orders under the same terms and conditions specified in the basic order. The initial delivery order represents the minimum quantity, therefore the Government is under no obligation to place additional orders. The Government may place additional orders for the period of performance stated in the purchase order, effective from the date of the initial order. All additional orders will reference the basic order. The aggregate value of all orders shall not exceed the simplified acquisition threshold (see FAR 2.101); or, for acquisitions conducted using FAR Subpart 13.5, shall not exceed $6.5 million ($12 million for acquisitions described in 13.500(e)). The maximum value under the IDPO is stated in the basic order.

(c) Evaluation of Quotes. If quotes include variable pricing based upon conditions such as quantity ranges, transportation zones, and/or option years, quotes will be evaluated by establishing an average unit price. The average unit price will be established by adding all unit prices together, then dividing the sum by the number of unit prices.

(d) Pricing of Orders. When issuing orders, the unit price shall be based on the price from the quantity range that will cover the total quantity on the order, regardless of destination.

(e) Numbering. The uniform procurement instrument identification numbering (PIIN) system will be used (see Defense Federal Acquisition Regulation Supplement (DFARS) 204.7003).

(End of Clause)

52.213-9012 Indefinite Delivery Purchase Order (IDPO) - Bilateral.

As prescribed in 13.390(d)(3), insert the following clause:

INDEFINITE DELIVERY PURCHASE ORDER (IDPO) - BILATERAL (APR 2014)

(a) The Government will award a bilateral IDPO resulting from this request for quotes to the responsible offeror whose offer conforming to the terms and conditions in the request for quotes will be most advantageous to the Government, price and/or other factors considered.

(b) The Contractor agrees that it will accept additional orders under the same terms and conditions specified in the basic order. This agreement becomes binding upon delivery of the initial order, which is the minimum quantity for this IDPO. The initial delivery order represents the minimum quantity for this IDPO, and the Government is under no obligation to place additional orders under this IDPO. The Government may place additional orders for the period of performance stated in the purchase order, effective from the date of the basic order. All additional orders will reference the initial order. The aggregate value of all orders shall not exceed the simplified acquisition threshold (see FAR 2.101); or, for acquisitions conducted using FAR Subpart 13.5, shall not exceed $6.5 million ($12 million for acquisitions described in 13.500(e)); the maximum value is stated in the basic order.

(c) Evaluation of quotes. If quotes include variable pricing based upon conditions such as quantity ranges, transportation zones, and/or option years, quotes will be evaluated by establishing an average unit price. The average unit price will be established for an award under the maximum value, by adding all unit prices together, then dividing the sum by the number of unit prices.

(d) Pricing of orders. When issuing orders, the unit price shall be based on the price from the quantity range that will cover the total quantity on the order, regardless of destination.

(e) Numbering. The uniform procurement instrument identification numbering (PIIN) system will be used (see Defense Federal Acquisition Regulation Supplement (DFARS) 204.7003).

(End of Clause)]

52.216-9000 Implementation of FAR 52.216-2 Economic Price Adjustment--Standard Supplies.

As prescribed in 16.203-4(S-92)(a)(1)(90) and 16.203-4(b)(1)(S-90), insert a clause that is substantially the same as the following clause:

IMPLEMENTATION OF FEDERAL ACQUISITION REGULATION (FAR) 52.216-2 ECONOMIC PRICE ADJUSTMENT - STANDARD SUPPLIES (NOV 2011)

Economic price adjustment (EPA) pursuant to the clause of this contract entitled Economic Price Adjustment–Standard Supplies (FAR 52.216-2), shall be determined as implemented herein.

EPA is limited to changes in the established price for the contract line item number (CLIN) listed below. The offeror shall report the item name, its part number and current established price (as defined in paragraph (a) of the aforementioned EPA clause), its unit of measure and free on board (f.o.b.) location, shall identify the name, source and date of the document containing such price, and shall attach to its offer, a copy of the pages from such document identifying the item and its price:

_________________________(Note1)_________________________________

In the event the price cited in (b) is an established market price which the Contracting Officer determines consistently and substantially fails to reflect market conditions, the Contracting Officer may modify the contract to specify use of an appropriate substitute market price, effective on the date such market price specified in the contract begins to consistently and substantially fail to reflect market conditions.

The Contractor shall include with the final invoice, a statement that the Contractor has not experienced a decrease in the unit price for the item listed herein, or a statement that it has given notice of all such decreases in compliance with the EPA clause.

(End of Clause)

Note 1: The Contracting Officer shall list the contract line-item number (CLIN) to be subject to EPA, provide for offeror fill-in of its item name, part number, current cost, unit of measure and free on board (f.o.b.) location for such item, and for the name, source and date of the document containing such price.

52.216-9001 Implementation of FAR 52.216-3 Economic Price Adjustment -Semistandard Supplies.

As prescribed in 16.203-4(b)(1)(S-90), insert a clause that is substantially the same as the following clause:

IMPLEMENTATION OF FEDERAL ACQUISITION REGULATION (FAR) 52.216-3 ECONOMIC PRICE ADJUSTMENT - SEMISTANDARD SUPPLIES (NOV 2011)

(a) Economic price adjustment (EPA) pursuant to the clause of this contract entitled Economic Price Adjustment–Semistandard Supplies (FAR 52.216-3), shall be determined as implemented herein.

(b) EPA is limited to changes in the established price for the contract line item number (CLIN) listed below. The offeror shall report the item name, its part number and current established price (as defined in paragraph (a) of the aforementioned EPA clause), its unit of measure and free on board (f.o.b.) location, shall identify the name, source and date of the document containing such price, and shall attach to its offer, a copy of the pages from such document identifying the item and its price:

__________________(Note 1)_________________________________________

(c) In the event the price cited in (b) is an established market price which the Contracting Officer determines consistently and substantially fails to reflect market conditions, the Contracting Officer may modify the contract to specify use of an appropriate substitute market price, effective on the date such market price specified in the contract begins to consistently and substantially fail to reflect market conditions.

(d) The Contractor shall include with the final invoice, a statement that the Contractor has not experienced a decrease in the unit price for the item listed herein, or a statement that it has given notice of all such decreases in compliance with the EPA clause.

(End of Clause)

Note 1: The Contracting Officer shall list the contract line-item number (CLIN) to be subject to EPA, provide for offeror fill-in of its item name, part number, current cost, unit of measure and free on board (f.o.b.) location for such item, and for the name, source and date of the document containing such price.

52.216-9002 Implementation of FAR 52.216-4 Economic Price Adjustment--Labor and Material.

As prescribed in 16.203-4(c)(1)(90), insert a clause that is substantially the same as the following clause:

IMPLEMENTATION OF FEDERAL ACQUISITION REGULATION (FAR) 52.216-4 ECONOMIC PRICE ADJUSTMENT - LABOR AND MATERIAL (NOV 2011)

(a) Economic price adjustment (EPA) pursuant to the clause of this contract entitled Economic Price Adjustment–Labor And Material (FAR 52.216-4), shall be determined as implemented herein.

(b) EPA is limited to changes in the Contractor’s cost relative to the labor category or item of material and the related contract line item number (CLIN)) listed below. The offeror shall list its current cost per unit of labor and/or materials for such item, shall identify the name, source and date of the document containing such cost, and shall attach to its offer, a copy of the pages from such document identifying the item and its cost:

___________________________(Note 1)______________________________________

(c) EPA for the specified cost element relative to each contract line item number (CLIN) shall be calculated as follows:

___________________________(Note 2)___________________________________

(d) The Contractor shall include with the final invoice, a statement that the Contractor has not experienced a decrease in any labor rate and/or material unit price for the item listed herein, or a statement that it has given notice of all such decreases in compliance with the EPA clause.

(End of Clause)

Note 1: For the item to be subject to price adjustment, the Contracting Officer shall list the contract line item number (CLIN), the specific labor category or item of raw material, purchased part, etc. to be subject to EPA, provide for offeror fill-in of its current cost and unit of measure for such category/item, and for the name, source and date of the document containing such cost.

Note 2: The Contracting Officer shall identify the quantity and cost (or the dollar percentage) of the item listed in paragraph (b) that is included in CLIN price, along with an explicit description of how an increase, and how a decrease, in such item cost shall be used in calculating any EPA to the CLIN unit price. A sample calculation may be included if deemed beneficial.

52.216-9003 Economic Price Adjustment – Specialty Metals – Market Price – Prospective Adjustments.

As prescribed in 16.203-4(S-91)(4), insert the following clause:

ECONOMIC PRICE ADJUSTMENT-SPECIALTY METALS – MARKET PRICE - PROSPECTIVE ADJUSTMENTS (NOV 2011)

(a) Warranties. The Contractor warrants that--

(1) The base unit prices set forth in the schedule do not include allowances for any portion of the contingency covered by this clause;

(2) The contract line items (CLINS) included in the table (paragraph (f)) are subject to the Preference for Domestic Specialty Metals clause of this contract; and

(3) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause--

(1) "Market price indicator," as specified in column 5 of the table is the measure of changes in the market price of the material cost for the specialty metal(s) included in the contract price of the CLINS subject to adjustment under this clause.

(2) "Base unit price" is the unit price of a CLIN listed in the table, as applicable, during the initial contract period, or during an option period, exclusive of any price adjustment pursuant to this clause.

(3) "Base period" is the three calendar months preceding the month containing, as applicable, the closing date for receipt of offers (final proposal revisions if discussions were held) under negotiation procedures or the date of bid opening under sealed bid procedures. In addition, if the contract includes a period option, the base period is the arithmetic average of the three calendar months immediately preceding the month prior to the month containing the effective date for the option exercised.

(4) "Base market price indicator" (BMPI) for a CLIN listed in the table is the arithmetic average of the market price indicator values for the base period for the specialty metal(s) specified in column (2) of the table for that CLIN.

(5) “Base specialty metals cost” (BSMC) for a CLIN listed in the table is the dollar value of the direct materials cost of a specialty metal as recorded in column (4) of the table for such item.

(6) “Adjustment period” for purposes of this contract, will be: (if none marked, adjustments will be done annually)

( ) Quarterly – adjustments will be calculated following the publication of the market price indicator for the second month in each consecutive three calendar month period.

( ) Semi-annually – adjustments will be calculated following the publication of the market price indicator for the fifth month in each consecutive six calendar month period.

( ) Annually - adjustments will be calculated following the publication of the market price indicator for the eleventh month in each consecutive twelve calendar month period.

(7) "Adjusting market price indicator" (AMPI) for a CLIN listed in the table during the first adjustment period of contract performance is the arithmetic average of the market price indicator values for the three months immediately preceding the month prior to the first month of contract performance. For subsequent adjustment periods, the adjusting market price indicator for such CLIN is the arithmetic average of the three calendar months immediately preceding the month prior to the first month of the current adjustment period for which a prospective adjustment is being calculated.

(8) “Adjusted specialty metal material cost” is the base specialty material cost, adjusted as specified in paragraph (c)(2) on a prospective basis.

(9) “Non-specialty metals base price” is the base unit price for a CLIN minus the base specialty metal material cost for that CLIN.

(10) “Adjusted CLIN unit price” is sum of the adjusted specialty metal material unit cost and the non-specialty metals unit price rounded to four decimal places.

(c) Adjustments.

(1) Promptly following publication of the market price indicator(s) for the month specified in paragraph (b)(5) of the current adjustment period, the Contracting Officer shall calculate the adjusted specialty metal material price(s) and adjusted contract line item unit price(s), and modify the contract accordingly to incorporate CLIN prices that will be applicable to new orders issued during the next adjustment period.

(2) Calculations. All calculations shall be rounded to four decimal places. On the month prior to the beginning of the next adjustment period, the price adjustment(s) shall be calculated as follows:

(A) Compute the adjusting market price indicator (AMPI) for a CLIN, i.e., the arithmetic average of prices published for the indicator(s) shown in column (5) of the table for such CLIN, for the three month period preceding the current month.

B) Using the base market price indicator (BMPI) (column (6) of table and the adjusting market price indicator (AMPI) computed per (A) above, calculate the market price indicator percentage change as follows:

AMPI – BMPI = ± market price indicator change percentage (MPIC %) BMPI

(C) Use the base specialty metal(s) cost (BSMC $) (Column (4) of the TABLE) and the MPIC % ((B) above) to calculate the new adjusted specialty metals price as follows:

BSMC $ x MPIC % = ± specialty metal price change (SMPC)($)

± SMPC + BSMC = adjusted specialty metal cost per CLIN material price

Note: If more than one specialty metal is included in the table for a CLIN, the SMPC is calculated for each using the former of the above two formulas and the change for each (increase or decrease) added to the BSMC to calculate the adjusted specialty metal cost per CLIN (vice the latter formula above.)

(D) Determine the adjusted contract line item unit price by adding the adjusted specialty metal(s) cost(s) to the non-specialty metals portion of the CLIN price.

(3) Modifications. Price adjustments under this clause shall be effected by contract modification showing the base unit price(s), calculation of the adjusting market price(s), the base contract line item unit price, and the calculations used to arrive at the adjusted contract line item unit price(s).

(4) Invoices. The prices invoiced and payable under this contract shall be based on the unit price(s) in the contract on the date the order is awarded.

(5) Failure to deliver. Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Default clause of this contract.

(6) Upward ceiling on economic price adjustment.

(i) The Contractor agrees that the total increase in any specialty metal material cost pursuant to these economic price adjustment provisions shall not exceed ___% (percent) of the original material cost in any applicable contract year (whether a single year or multiyear program), except as provided hereafter.

(ii) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(iii) If an actual increase in the indicator would raise a contract unit price for an item above the current ceiling, the Contracting Officer may issue a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(7) Revision of market price indicator. In the event –

(i) Any applicable market price indicator is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the market price indicator consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the price was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(d) Final invoice. The Contractor shall include a statement on the final invoice under (1) the basic contract and under (2) each option period, that the amounts invoiced during the period have applied all adjustments required by this clause.

(e) Disputes. Any dispute arising under this clause shall be determined in accordance with and subject to the “Disputes” clause of the contract.

(f) Table. The offeror shall complete columns (1) through (4) in the table which follows, for all items containing specialty metals subject to adjustment under this clause (see paragraph (a)(2)). The offeror shall include with its offer adequate data to support derivation of the dollar value of specified material in the base unit price subject to adjustment (column (4)). Data supplied shall, at a minimum, provide an informal cost breakdown reflecting the current raw material cost, the specialty metal specification and the quantity of material per contract line item unit price.

(1)

(2)

(3)

(4)

(5)

(6)

Contract Line Item Number (CLIN) Subject to Adjustment

Specialty Metal Subject to Adjustment

Specialty Metal Amount per CLIN Unit of Issue

Base Specialty Metals Cost (see paragraph (b)(5)) in CLIN Base Unit Price

Specialty Metals Market price indicator identification and/or Name

Base Market Price Indicator

(see paragraph (b)(4))

Sample CLIN 0000

Titanium Tt35

2 pound (lb)

$30

Platts US SG Ingot Producer

$14.10/lb

           
           
           

(End of Clause)

52.216-9006 Addition/Deletion of Items.

As prescribed in 16.506(90), insert the following clause:

ADDITION/ DELETION OF ITEMS (AUG 2005)

(a) The Government reserves the right to unilaterally delete items that were available from only one manufacturer at the time of award if an alternate source of supply becomes available or the Government’s requirements are modified to provide for full and open competition. The Government will provide a 30 day advance notice to the Contractor prior to deleting any item from the Contract.

(b) New items may be added to the contract through bilateral modification with negotiated prices. All new requirements are subject to synopsis prior to addition to the contract.

(c) Discontinued items:

(1) The Contractor agrees to provide the Government with immediate, written notification when an item is to be discontinued by the manufacturer, including a recommendation for any potential substitute or replacement items. If the Government elects to include a substitute or replacement item in the contract, the contract will be modified accordingly.

(2) If an item is discontinued without replacement, the notice should include a recommendation concerning the availability of items that are comparable in form, fit, and function. The Contractor shall not incur any costs related to alternate sources of supply without the express written approval of the Contracting Officer. The Government has the option to make a last time order, or series of orders, within 30 days after receiving written notification of the discontinued item after which the item will be deleted from the contract. The Contractor shall honor any last time order unless it is returned to the ordering office within 10 days after issuance, with written notice stating the full quantity is not available for shipment. The terms of such order(s) will be negotiated by the parties, including changes to the delivery schedule and maximum quantity available for shipment.

(End of Clause)

52.216-9008 Offeror’s Quantity Limitations.

As prescribed in 16.506(91)(b), insert the following clause:

OFFEROR’S QUANTITY LIMITATIONS (JUL 2006)

An offer may be restricted by completing the following section, however such conditional offers may not be acceptable. Stating no restriction, either below or elsewhere in the offer, is express authorization to accept award of the total quantity offered or any part thereof.

[ ] 100% of all items offered or none.

[ ] Clearly describe other restrictions, if any, under which the offer is submitted.

_______________________________

(End of Clause)

52.216-9012 Economic Price Adjustment for Unitized Group Rations (UGR) - A Components – Actual Material Costs.

As prescribed in 16.203-4(c)(2), 16.203-4-90(b), and FAR 16.203-4(c), insert the following clause:

ECONOMIC PRICE ADJUSTMENT FOR UNITIZED GROUP RATIONS (UGR) - A COMPONENTS – ACTUAL MATERIAL COSTS – DLA TROOP SUPPORT SUBSISTENCE

(NOV 2011)

(a) Warranties. The Contractor warrants that---

(1) distribution prices covered by this contract do not include allowances for any portion of the contingency covered by this clause; and

(2) all prices invoiced under this contract shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause, the term:

(1) “Contract unit price” means the total fixed price per unit charged to DLA Troop Support for a product delivered to DLA Troop Support’s customers. The contract unit price consists of two parts: Total Components price and Distribution price. The sum of these two prices shall be rounded up or down as applicable, (based on the rule of 5 or over to round up) to two (2) places to the right of the decimal point to calculate the contract unit price. Only the delivered price component of the contract unit price is subject to adjustment under this clause.

(2) “Total components price” means the total cost to the Contractor for all the food and disposable component items of the ration module, which is calculated by summing the total individual costs to the Contractor of each food and disposable component item in the ration module. The total cost to the Contractor for each ration component is calculated as the net unit price charged to the Contractor for that component, multiplied by the quantity of units per ration module. The net unit price for each component is the price paid by the Contractor to its supplier(s) for delivery of the component product to its distribution/assembly location (often called the “delivered price” or “landed cost”), taking into account any product discounts or rebates offered by the suppliers. The most recent vendor’s invoice price for a ration component should usually meet this definition as the net unit price for the component. The following table gives an example of how to calculate the total components price:

Lunch/Dinner Menu 1 Perishable - 8970-01-525-6813 - Chicken Parmesan

             
 

Net

Net Unit

Case

Qty/

Units/

Component

Menu Item

Unit

Price

Pack

Ration

Ration

$ / Ration

             

Chicken Parmesan

CS

$22.45

50 PC

50 PC

50/50

$22.45

Sauce

CS

$4.25

6 CN

3 CN

3/6

$2.13

Lemon Cake

CS

$5.17

8 EA

2 EA

2/8

$1.29

Total Components Price

         

$25.87

Legend: Qty = Quantity’ CS = case; PC = piece; CN = carton; EA = each

(3) “Distribution price” means the firm fixed price portion of the contract unit price, offered as a dollar amount per unit of issue, which represents all the elements of the contract price other than the total components price. The distribution price typically covers the Contractor’s projected general and administrative expenses, overhead, packaging costs, transportation costs from the Contractor’s distribution/assembly point, and any other projected expenses associated with delivery to DLA Troop Support’s customers, plus profit. This price shall remain constant for the complete term of the contract period then in effect. Distribution prices shall be formatted to two (2) places to the right of the decimal point, for example, $4.50 per semi-perishable ration module.

(4) “Ordering catalog” means the listing of contract ration modules to be delivered to Government customers, and their corresponding contract unit prices available for ordering under this contract.

(5) “Ordering week” means the 7-day week, from Sunday at 12:01 AM through the following Saturday until midnight Eastern Time (ET), standard or daylight as applicable), during which the Government place orders for unitized group rations (UGR) A modules to the Contractor.

(c) Price adjustments.

(1) General.

(A) All ordering catalog prices shall be fixed and remain unchanged until changed pursuant to this clause or other applicable provision of the contract. If the Contractor’s applicable total components price of a ration component(s) changes (i.e. increase or decrease) after the contract date, the corresponding contract unit price may be increased, or shall be decreased, by the same amount. The price change shall be effective at the beginning of the next ordering week. All ordering catalog unit prices computed in accordance with this clause and in effect when an order is placed shall remain in effect for that order through delivery. DLA Troop Support will be charged the contract unit price at time of each order regardless of any changes in the unit price occurring in any subsequent ordering week. In the event the Contractor finds a price recorded in the ordering catalog was not computed in accordance with this clause, and the error resulted in a higher contract unit price, than would have applied if this clause had been correctly applied, the Contractor shall immediately notify the Contracting Officer in writing and promptly thereafter submit a refund proposal. The posting of updated prices in the ordering catalog, calculated in accordance with this clause, constitutes a modification to this contract. No further contract modification is required to effect the change.

(B) The Contractor shall submit a request weekly for approval of price changes and for the retention of current prices, no later than Thursday, 1:00 PM eastern time (ET) to be effective in the following ordering week’s ordering catalog prices. The Contractor shall notify the Contracting Officer of its request in the form of an electronic data interchange (EDI) 832 transaction set or via an update to the United States Department of Agriculture (USDA) web-ordering tool, as applicable. The notice shall include the Contractor’s adjustment in the total components price component of the applicable contract unit price.

(C) The Contracting Officer may at any time require the submission of supporting data to substantiate any requested price change or the requested continuation of the pre-existing price for any item, including prices applicable to prior ordering weeks. Upon notice from the Contracting Officer that supporting data is required, the Contractor shall immediately furnish to the Government all supporting data, including but not limited to, invoices, quotes, price lists and any other substantiating information requested by the Contracting Officer.

(D) The Contracting Officer may reject any price change or request to maintain a current price for any item, to the extent such price is found not to be representative of the Contractor’s current total components price.

(E) Should the Contracting Officer determine that a price change request contained an erroneous unit price or price change, the Contracting Officer may direct that the contract unit price be set at the amount determined by the Contracting Officer to reflect the accurate Total Components price. If the accurate price is lower than the erroneous price or price change, then the Contractor shall promptly thereafter submit a refund proposal.

(F) If the Contracting Officer does not notify the Contractor by Friday, 12:30 PM ET that a price or a price change request is being questioned or has been found to be erroneous, the requested contract unit price change(s) will be incorporated in the ordering catalog to be effective with the beginning of the following ordering week. Price change requests that the Contracting Officer questions or finds to be inconsistent with the requirements of this clause shall not be posted until the Contracting Officer specifically authorizes the posting.

(G) For all proposed prices that were not correctly entered in time into the ordering catalog for the following week, or were identified following the commencement of the applicable ordering week, and for any excessive prices found in prior ordering catalogs, that resulted in incorrectly higher contract unit prices, the Contractor shall promptly refund the difference between the correct amount and the incorrect amount to the Government, whether identified by the Contractor or by the Contracting Officer.

As an example, the following illustrates a request for a contract unit price change for lunch/dinner perishable menu 1:

Price effective for ordering week 13-19 Aug 2006

Lunch/Dinner Menu 1 Perishable - 8970-01-525-6813 - Chicken Parmesan

             
 

Net

Net Unit

Case

Qty/

Units/

Component

Menu Item

Unit

Price

Pack

Ration

Ration

$ / Ration

             

Chicken Parmesan

CS

$22.45

50 PC

50 PC

50/50

$22.45

Sauce

CS

$4.25

6 CN

3 CN

3/6

$2.13

Lemon Cake

CS

$5.17

8 EA

2 EA

2/8

$1.29

Total Components Price

         

$25.87

Distribution Price

         

$4.25

Contract Unit Price

         

$30.12

On 15 Aug 2006, the Contractor has received a new delivery of chicken parmesan at $21.50 per case, and lemon cake at a delivered price of $5.30 per case. The Contractor would request a contract unit price change as follows (requested changes in bold):

 

Net

Net Unit

Case

Qty/

Units/

Component

Menu Item

Unit

Price

Pack

Ration

Ration

$ / Ration

             

Chicken Parmesan

CS

$21.50

50 PC

50 PC

50/50

$21.50

Sauce

CS

$4.25

6 CN

3 CN

3/6

$2.13

Lemon Cake

CS

$5.30

8 EA

2 EA

2/8

$1.33

Total Components Price

         

$24.96

Distribution Price

         

$4.25

Contract Unit Price

         

$29.21

(2) Limitations. All adjustments under this clause shall be limited to the effect on contract unit prices of actual increases or decreases in the net unit prices for material. There shall be no upward adjustment for—

(A) Production cost increases incurred by the Contractor

(B) Changes in the quantities of material.

(d) Upward ceiling on economic price adjustment. The aggregate of contract unit price increases for each item under this clause during any single performance period (base or option period) shall not exceed 10 percent (%) of the initial contract unit price in such performance period except as provided hereafter. There is no downward limitation on the aggregated percentage of decreases that may be made under this clause.

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, or in the event the latest actual cost for an item would exceed the allowable ceiling price under the contract, then the Contractor shall immediately notify the Contracting Officer in writing of the facts and circumstances. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of the remaining contract performance period, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the component delivered prices would raise a contract unit price for an item above the current ceiling, the Contracting Officer may issue a contract modification to establish a separate price increase limit for the item for the remainder of the current performance period. If the contract ceiling will not be raised, or raised sufficiently, to enable continued ordering of the item, the Contracting Officer shall so promptly notify the Contractor in writing.

(e) Examination of records.

The Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents and other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause. Such examination may occur during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in Subpart 4.703 of the Federal Acquisition Regulation (FAR), whichever is earlier.

(f) Final invoice. The Contractor shall include a statement on the final invoice under the basic contract and any option period that the amounts invoiced hereunder have applied all decreases required by this clause.

(g) Disputes. Any dispute arising under this clause shall be determined in accordance with the “Disputes” clause of the contract.

(End of Clause)

52.216-9013 Evaluation of Offers for Indefinite Delivery Type Solicitations.

As prescribed in 16.506-92(a), insert the following provision:

EVALUATION OF OFFERS FOR INDEFINITE DELIVERY TYPE SOLICITATIONS (NOV 2011)

(a) When Federal Acquisition Regulation (FAR) clause 52.216-21 or one of its alternates is contained in this solicitation, this solicitation is for a requirements contract. Offers will be evaluated on the basis of the estimated annual quantity. If quantity increments are offered with various prices, the highest price offered will be used for evaluation.

(b) When FAR clause 52.216-22 is contained in this solicitation, this solicitation is for an Indefinite Quantity contract. Offers will be evaluated on the basis of the estimated annual quantity. Unless (c) is checked below, if quantity increments are offered with various prices, the highest price offered will be used for evaluation. If line items for both DLA direct and customer direct are included in the schedule, offers will be evaluated based on the total extended price for the DLA direct and customer direct line items.

(c) [ ] If checked, and subject to the terms and conditions of the solicitation relating to the evaluation of offers, the following procedures will be followed:

(1) When offers are requested on a quantity increment basis, each contract line-item (CLIN) will be evaluated for price by:

[ ] applying a weighted factor of 18% to the first quantity increment, 36% to the second increment, and 46% to the third increment to arrive at an average weighted unit price.

[ ] applying a weighted factor of 5% to the first quantity increment, 65% to the second increment, 25% to the third increment, and 5% to the fourth increment to arrive at an average weighted unit price.

This average weighted unit price will be multiplied by the estimated annual quantity that may be procured during the contract period to arrive at a total annual evaluated price for each CLIN. If the solicitation provides for separately priced option periods, average weighted prices will be calculated as described above in (1) for each option period and then added to the base contract period total to determine the total estimated price of that line item for the evaluation.

(2) When quantity increment prices are not requested, offers for each CLIN will be evaluated by multiplying the unit price by the estimated quantity that may be procured during the contract period to arrive at total price for each CLIN.

(3) Prices offered must be unit prices only which are clearly stated and which require no further interpretation by the Government to determine the actual offered price. Prices must not be stated as part of a pricing formula or as charges per lot. Unit prices offered must include costs of compliance with all solicitation requirements, with the exception of additive CLINs. For each item of supply for which a price is offered, prices must be offered for each quantity increment and year. Failure to submit proposed prices in accordance with these instructions may result in rejection of the offer.

(4) In the event first article testing and/or technical data are required for any or all of the CLINS, the cost of such testing and data will be added to the appropriate CLIN or prorated based on the ratio of the estimated quantity for each CLIN to the total estimated quantity of the various CLINs covering the same item or national stock number (NSN). In the event an offeror is low only on one CLIN (where there are several CLINs for the same item) (NSN), the cost of testing and data pertaining to that CLIN will be added for evaluation purposes.

(5) [ ] If checked, when free on board (f.o.b.) origin offers are authorized, transportation costs will be considered in evaluation and will be based on the best estimated quantity of each CLIN as specified elsewhere in this solicitation. Carload or truckload rates will be used to evaluate the cost of transportation for each CLIN unless the best estimated quantity would not constitute a carload or truckload. In such case, less than carload (LCL) or less than truckload (LTL) rates will be used for evaluation purposes.

(End of Provision)

Alternate I (APR 2008). As prescribed in 16.506-92(a) Use ALT I when assigning the greatest weight to the quantity increment most likely to be procured for each delivery order. Replace paragraph (c)(1) with:

(c) [ ] If checked, and subject to the terms and conditions of the solicitation relating to the evaluation of offers, the following procedures will be followed:

(1) When offers are requested on a quantity increment basis, each CLIN will be evaluated for price on a weighted basis.

(i) To be considered for award for any item, prices must be offered for each quantity increment cited. Incremental quantities within which it is anticipated orders are most likely to be issued are assigned the highest weights.

(ii) Offers will be evaluated by multiplying the designated weight by the unit price for each order increment and adding the results. Only one award will be made for each line item. Each delivery order will be issued at the price offered for that increment.

(iii) he weighted average evaluated price will be developed for each item using the formula stated in subparagraphs (A) through (C) below.

Increment

Weight

Increment

Weight

A

________

D

_______

B

________

E

_______

C

________

F

_______

(A) The weighted average price (for a given item for a given year) will be arrived at as follows:

(Offered unit price) x (increment weight) = weighted unit price (Sum of weighted unit prices) divided by (the sum of the weights) = weighted average price.

(B) (The weighted average price) x (the estimated annual requirement) = estimated annual cost for a given item for a given year.

(C) The sum of the estimated annual costs for a given item for the base year plus any option periods = the total estimated cost for that item.

(End of Provision)

52.216-9014 Area Requirements – Tentative Destinations.

As prescribed in 16.506-93(a), insert the following provision:

AREA REQUIREMENTS – TENTATIVE DESTINATIONS (NOV 2011)

(a) Each item of supply described in this solicitation is identified by a national stock number (NSN). One or more tentative destinations is/are listed under each item of supply. Each tentative destination designates an area of the Contiguous United States, excluding Alaska, consisting of certain states, or other geographical locations, as more specifically described below. If offers are solicited on the basis of delivery free on board (f.o.b.) origin, the tentative destination(s) will be used in the evaluation of offers. Each tentative destination, and the area which it represents, is designated by a separate contract line item number (CLIN).

(b) Except as otherwise provided by this solicitation, the Government shall order its requirements for each item of supply within the geographic area designated by the tentative destination (CLIN).

(c) The tentative destinations (CLINS) for the supplies set forth covered by this solicitation are as follows:

Item Number (CLIN)

Tentative Destination

Area

(Will be indicated in the solicitation)

(End of provision)

52.216-9015 Area Requirements- Contiguous United States (CONUS).

As prescribed in 16.506-93(b), insert the following clause:

AREA REQUIREMENTS – CONTIGUOUS UNITED STATES (CONUS) (NOV 2011)

(a) Each item of supply of this solicitation/contract is identified by a national stock number (NSN) and a contract line item number (CLIN). Each CLIN covers the Government’s requirements for item of supply to be delivered within the area of the CONUS (which is the 48 contiguous states and the District of Columbia.)

(b) Except as otherwise provided by this solicitation/contract, the Government shall order all of its requirements for each item of supply identified in the Schedule, for delivery in the area of CONUS.

(End of Clause)

52.216-9019 Area Requirements – East and West of Mississippi.

As prescribed in 16.506-94, insert the following provision:

AREA REQUIREMENTS – EAST AND WEST OF MISSISSIPPI - DLA TROOP SUPPORT CONSTRUCTION AND EQUIPMENT (C&E) (NOV 2011)

(a) Each item of supply in the schedule is designated by a national stock number (NSN). Each NSN is listed under two Contract Line Item Numbers (CLINS), one odd (e.g. CLIN 0003) and one even (e.g. CLIN 0004). The odd numbered CLINS represent the Government’s requirements for the item of supply in the area of the contiguous United States East of the Mississippi river. The even numbered CLINS represent the Government’s requirements for the item of supply in the area of the contiguous United States west of the Mississippi river, excluding Alaska.

(b) Except as otherwise provided by this solicitation/contract, the Government shall order from the Contractor who is awarded the odd-number CLIN for each item of supply all of its requirements for the CLIN within the contiguous limits of the United States east of the Mississippi river; and, except as otherwise provided by this solicitation/contract, the Government shall order from the Contractor who is awarded the even-number CLIN for each item of supply all of its requirements for the CLIN within the contiguous United States west of the Mississippi river, excluding Alaska.

(c) For ease of identification and evaluation for award, CLINs are assigned Arabic numerals and LOTS, if applicable, are assigned roman numerals. Further, odd numbered CLINS (e.g., 0001, 0003, 0005, etc.) are grouped in odd numbered roman numeral lots, (e.g., I, III, V, etc.) and even numbered CLINS are grouped in even numbered roman numeral lots.

(End of Provision)

52.216-9022 Placement of Task/Delivery Orders Against Multiple Indefinite Delivery Contracts.

As prescribed in 16.505(b)(S-90), insert the following clause:

PLACEMENT OF TASK/DELIVERY ORDERS AGAINST MULTIPLE INDEFINITE DELIVERY CONTRACTS (APR 2014)

(a) In accordance with Federal Acquisition Regulation (FAR) 52.216-27, Single or Multiple Awards, the Government may elect to award multiple contracts under this solicitation. Proposals will be evaluated in accordance with the evaluation provision(s) specified in Section M of this solicitation. In the event of multiple awards, the same evaluation criteria will be used to determine which proposals represent the best value to the Government. The exact number of awards is left to the discretion of the Contracting Officer considering the cost to the Government to administer multiple awards, the recurring nature of the requirement, the need to increase the active production base, and/or the benefits that may be achieved through continued competition.

(b) Task/delivery order placement procedure:

(1) In the event of multiple awards, each awardee will be considered for placement of individual task/delivery orders unless an exception at FAR 16.505(b)(2) applies. However, those awardees subject to testing and approval requirements, such as, but not limited to, First Article Testing, shall not receive orders until satisfactory completion of any testing requirements. Failure to successfully complete required testing will constitute grounds for contract termination for default by the Government.

(2) The criteria used for evaluating offers for task/delivery orders under this contract are price, past performance, and delivery. Price is of ________ importance than (to) the other factors combined. Past performance will include performance on orders previously placed under the contract and may include performance under other contracts. In evaluating performance under previous orders, consideration will be given to delivery, quality of supplies furnished, and success in implementing any socioeconomic support programs (small business, Defense Logistics Agency (DLA) Mentoring Business Agreement, AbilityOne) which may be applicable to the contract.

(c) Task and delivery order ombudsman: In accordance with FAR 16.505(b)(8), complaints or questions regarding the placement of individual task/delivery orders will be addressed by the competition advocate. Correspondence should be directed to the appropriate supply chain listed below:

For DLA Aviation:

DLA Aviation

Competition Advocate, BPP

8000 Jefferson Davis Highway

Richmond, Virginia 23297-5124

For DLA Troop Support’s construction and equipment, clothing and textile, subsistence, and medical supply chains:

DLA Troop Support

Competition Advocate, BPA

700 Robbins Avenue

Philadelphia, Pennsylvania 19111-5096

For DLA Land and Maritime:

DLA Land and Maritime

Competition Advocate

Post Office (P.O.) Box 3990

Columbus, Ohio 43218-3990

(End of Clause)

52.216-9026 Pricing of Delivery Orders with Quantity Increments.

As prescribed in 16.506-96(b), insert the following clause:

PRICING OF DELIVERY ORDERS WITH QUANTITY INCREMENTS (NOV 2011)

(a) In pricing delivery orders requiring delivery of one national stock number (NSN) to multiple destinations, the price for each destination will be determined as follows, depending on the box checked:

☐ (1) The quantity range price based on the total quantity of the NSN being procured under each delivery order regardless of destination; or

☐ (2) The total quantity being shipped to all destinations within each zone as defined elsewhere in this contract.

(b) If this solicitation/contract contains a provision for placement of orders through an electronic ordering system, unit prices for those orders will be determined as follows, depending on the box checked:

☐ (1) The total quantity of all requirements for each NSN issued via the electronic ordering system in a single day, regardless of the number of individual orders; or

☐ (2) The quantity of each individual order.

(c) The minimum quantity to be ordered, per destination, will be the minimum ordering range quantity if specified in section B of the solicitation/contract for each item.

(End of Clause)

52.216-9027 Evaluation of Quantity Sensitive and Indefinite Delivery Contracts.

As prescribed in 16.504-90, insert the following clause:

EVALUATION OF QUANTITY SENSITIVE AND INDEFINITE DELIVERY CONTRACTS

(SEP 2008)

Prices will be evaluated on a weighted basis. To be considered for award for any item, prices must be offered for each quantity increment cited. Incremental quantities within which it is anticipated orders are most likely to be issued are assigned the highest weights. Offers will be evaluated by multiplying the designated weight by the unit price for each order increment and adding the results. Only one award will be made for each line item. Each delivery order will be issued at the price offered for that increment.

(End of Clause)

52.216-9028 Economic Price Adjustment (EPA) – Labor and Material.

As prescribed in 16.203-4-90(k), use the following clause.

ECONOMIC PRICE ADJUSTMENT LABOR AND MATERIAL (NOV 2011)

To be completed by the Contractor - material proposed for economic price adjustment.

The following types of materials and labor, if applicable, are subject to price adjustment pursuant to Federal Acquisition Regulation (FAR) clause 52.216-4, Economic Price Adjustment (Section I), included herein:

Quantities and types of material

Direct cost

Types of material

Rate of per unit of labor

(End of Clause)

52.216-9029 Economic Price Adjustment (EPA) Lead, Battery Consignment Program.

As prescribed in 16.203-4-90(c), use the following clause.

ECONOMIC PRICE ADJUSTMENT (EPA) LEAD, BATTERY CONSIGNMENT PROGRAM

(NOV 2011)

(a) Warranties. The Contractor warrants that --

(1) The prices set forth in the Schedule do not include allowances for any contingency covered by this clause; and

(2) The Contractor further agrees that there will be no price adjustment in the contract unit prices as provided by this clause for any additional costs incurred applicable to items purchased under this contract during the first 12 month contract period, nor prior to the effective date of a contract modification effecting such an adjustment.

(3) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause--

(1) “Unit price subject to adjustment” (UPSA) is the estimated unit lead price per battery. The Contracting Officer will calculate the UPSA at the time of award using the London metals exchange standard lead average price for the most recent month available at the time of award, and the Government estimate of the number of pounds of lead required for each battery. The UPSA shall remain fixed throughout the life of the contract, including option periods and shall not be affected by any adjustment under this clause. For purposes of this contract, the Government’s estimate of the number of pounds of lead required for each battery is as follows:

Contract line-item number (CLIN) Government estimated

National stock number (NSN) pounds of lead / battery

______________________ __________________________

______________________ __________________________

(2) “Total adjusted lead price” (TALP) for each contract year after the first is the price of the lead contained in each battery at the time of adjustment based on the Government estimated pounds and the London metal exchange standard lead monthly average from the tenth month of the preceding contract year.

(3) For purposes of this clause, “contract year” is a 365-day (366-day for leap year) period beginning with and including the first effective day of each contract performance/ordering period.

(4) “Adjustment band” is the minimum percentage increase or decrease in the TALP compared to the UPSA (for the first adjustment) or the previous contract year’s TALP (for subsequent adjustments) required in order to warrant a price adjustment. For purposes of this contract, the adjustment band is +___% to -___%. When the percentage change is less than the specified percentages, no price adjustment will be made.

(5) “Adjusted contract unit Price” is the revised unit price of the specified CLIN/NSN, based on the TALP.

(c) Adjustments.

(1) The calculation required for adjustment of the contract item unit prices shall be calculated before the beginning of each contract year after the first. Not more than 60 days and not less than 30 days prior to the end of the current contract year the Contractor will submit the calculated TALP and, if applicable based on the adjustment band, the adjusted increased or decreased contract unit price to the Contracting Officer. The Contractor shall also submit the London metals exchange standard lead prices used in the calculations.

(2) The calculation of the TALP for the next contract year shall be made by multiplying the Government estimated pounds of lead for each battery line item by the average of published final prices per pound for standard lead from the London metals exchange for the tenth month of the contract year in which the calculation is being made.

(3) If the percentage change between the TALP for the next contract year and the UPSA (for the first adjustment) or the current TALP (for subsequent adjustments) is equal to or greater than the percentages established in the adjusting band, then the calculated percentage change (up or down) will be applied to the current contract unit price to arrive at the adjusted contract unit price (correspondingly up or down) for each battery line item, which is applicable in the next contract year in accordance with (4) below.

(4) Any price adjustment under this clause will be effected by a contract modification showing the revised contract unit prices in Section B. The Contracting Officer may unilaterally determine the applicable price adjustment if the data required in paragraph (c)(1) of this clause is not submitted as required in paragraph (c)(1).

(5) Calculations. All calculations shall be rounded to two decimal places.

(6) Upward ceiling on economic price adjustment. The Contractor agrees that the total cumulative increase in any contract unit price pursuant to this economic price adjustment provision shall not exceed ___% (percent) of the original UPSA for each contract year. There is no limitation on the amount of decreases that may be made under this clause.

(7) Revision of market price indicator. In the event –

(i) The applicable market price indicator is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the market price indicator consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the price was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(d) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(e) Disputes. Any dispute arising under this clause shall be determined in accordance with and subject to the “disputes” clause of the contract.

(End of Clause)

52.216-9030 Economic Price Adjustment - Department of Labor Index.

As prescribed in 16.203-4-90(d)(1), use the following clause.

Notes for fill-in text:

(a)(i) Paragraph (b)(1): Enter the appropriate Price Index (ECI, PPI, etc.) code number identification and title in the fill-in. Normally, unadjusted indexes should be used (as opposed to seasonally adjusted indexes). Note: If it is determined that the index to be used will only measure part of the cost of production or material, then that percentage which is measured can be specified. For example, if the component is cotton and the Bureau of Labor Statistics (BLS) index is only judged to measure 50% of the contract price, then this should be specified such as 50% times the base price.

(ii) Paragraph (b)(2): Enter the number of months, or quarters for ECI, for the adjusting price index.

(iii) Paragraph (b)(3): One box must be selected. Enter the number of months, or quarters for ECI, in each fill-in. Note: If final indexes are used, adjust the number of months, or quarters, in the second fill-in to account for first published indexes.

b. Paragraph (c)(1): Enter the number of price adjustments per contract year.

c. Paragraph (d): Enter the appropriate percentage price increase ceiling, considering the length of contract performance, index volatility, and ratio of the cost covered by this clause to the total contract price. Any percentage over 10 percent requires approval by the chief of the contracting office .

d. Paragraph (f)(2): Enter the minimal dollar amount for an adjustment to be made for retroactive price changes. The default is $500.

ECONOMIC PRICE ADJUSTMENT – DEPARTMENT OF LABOR PRICE INDEX (SEP 2015)

(a) Warranties. The Contractor warrants that--

(1) The base unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause –

(1) "Index" for the purpose of price adjustment under this clause shall be the Producer Price Index(es) reported in the monthly publication entitled, “Producer Price Indexes”, published by the United States (U.S.) Department of Labor (DOL), Bureau of Labor Statistics (BLS) for the following code number(s) and title(s):

________________________( contracting officer fill-in)_________________________; or the Employment Cost Index(es) reported in the quarterly publication entitled, “Employment Cost Indexes,” published by the United States (U.S.) Department of Labor (DOL), Bureau of Labor Statistics (BLS) for the following code number(s) and title(s): ________________________(contracting officer fill-in)_________________________.

(2) "Base index" is the arithmetic average of the final version of the indexes published for the ____ months, or ____ quarters for ECI, preceding the closing date for receipt of proposals or the date required for receipt of final proposal revisions, if discussions were held.

(3) "Adjusting index" shall be the ____ arithmetic average of the [ ] first published or [ ] final version of the index for the ____ months, or ____ quarters for ECI, prior to the month in which the adjusting contract modification is effective.

(4) "Base unit price" is the unit price applicable to a quantity of a contract line item established at contract award, exclusive of any price adjustment pursuant to this clause.

(5) “Adjustment period” is the period during which a particular adjustment to the unit price under this clause (calculated at the beginning of the adjustment period) will be applicable. The length of each adjustment period in months shall be calculated by dividing 12 by the number of adjustments allowed per year in (c)(1) below.

(c) Adjustments. Prior to the end of each adjustment period, the Contracting Officer shall calculate the adjusting index and any adjusted contract unit price(s) for the new adjustment period, and modify the contract accordingly. Price adjustments pursuant to this clause shall be made by contract modification, issued by the Contracting Officer and will show the base index, the adjusting index, the base unit price, the mathematical calculations, and the changed unit price(s). The price adjustment shall be applicable to orders issued after the effective date of the contract modification establishing the unit price for the adjustment period. The price adjustment(s) for each adjustment period will be based on the percentage change between the base index and the adjusting index for the adjustment period, as applied to the base unit price.

(1) The Government shall be entitled to a price decrease in any particular adjustment period if the adjusting index is less than the base index. There shall be _______ price adjustments per contract year.

(2) Example of adjustment calculation:

Base Index =

109.88*

   

Adjusting index =

112.72*

Less base index =

109.88

Change to index =

2.84

   

Divide change to index by base index =

2.84 / 109.88 = .02585 (2.585%)**

   

Multiply by the base unit price =

$50.00 x .02585 = $1.29***

= Unit Price Adjustment

   

Adjusted unit price =

$51.29

* In computing the base and adjusting indexes, the resulting figure shall be rounded to the second decimal place.

** This figure shall be rounded to the fourth decimal place.

*** All dollar figures shall be rounded to the nearest cent.

(d) Upward ceiling on economic price adjustment. No upward ceiling shall apply under this economic price adjustment clause, unless the BLS series is based on indices below the six-digit level (an index “below the six-digit level” in BLS usage means an index whose identifier exceeds six-digits). For any BLS series that is below the six-digit level, the following ceiling shall apply: The Contractor agrees that the aggregate of the increases in any contract unit price under this clause shall not exceed ___% (percent) of the original base unit price, except as provided hereafter.

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the adjustment ceiling for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an increase in the index would raise a contract unit price for an item above the current ceiling, the Contracting Officer may issue a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(e) Invoices. The prices payable under this contract will be based on the latest adjusted unit price incorporated into the contract as of the date of order.

(f) Retroactive adjustment. Paragraph applies only if “first published index” is selected in paragraph (b)(3) above. The Contractor may request a retroactive adjustment for orders that have been delivered during an adjustment period for which payment has already been made, based on the difference between a higher final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, and subject to the adjustment ceiling in (d) above and when the following conditions are met:

(1) The request for equitable adjustment clearly establishes that the unit price adjustment for the adjustment period would have been higher if the final revised index had been used, and identifies all invoices and payments to which it is applicable, cites the specific index differences relating to the requested adjustment, and provides a calculation of the total net price adjustment for items delivered during that adjustment period.

(2) No retroactive equitable adjustment shall be made under this clause unless the total dollar change for items delivered is $______ ($500.00 unless otherwise stated) or more for the applicable adjustment period(s).

(3) The Contractor’s written request must be received by the Contracting Officer within 45 days following publication of the final revised index.

The Government shall be entitled to a downward adjustment based on the difference between a lower final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, subject to the limitation in paragraph (f)(2).

(g) Revision of index. In the event –

(1) Any applicable index is discontinued or its method of derivation is altered substantially; or

(2) The Contracting Officer determines that the index consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the index was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(h) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(i) Disputes. Any dispute arising under this clause shall be determined in accordance with and subject to the “Disputes” clause of the contract.

(End of Clause)

52.216-9032 Economic Price Adjustment (EPA) - Established Market Price – Milk

As prescribed in 16.203-4-90(f), use the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) - ESTABLISHED MARKET PRICE – MILK (FEB 2009)

(a) To the extent that contingent cost increases are provided for by this clause, the Contractor warrants that prices included in the contract do not include any amount to protect against such contingent cost increases.

(b) This EPA clause applies to skim milk and butterfat fluid milk products classified as class I milk only (i.e., whole milk, fat-free milk, low fat milk, light milk, reduced fat milk, milk drinks, eggnog and cultured buttermilk, including any such beverage products that are flavored, cultured, modified with added nonfat milk solids, sterilized, concentrated, or reconstituted. As used in this paragraph, the term concentrated milk means milk that contains not less than 25.5 percent, and not more than 50 percent, total milk solids). Any package sizes other than gallons will be pro-rated based upon the price adjustment per gallon.

(c) Class I milk, as described in this clause, is subject to the regulations of the United States Department of Agriculture under the Federal milk marketing orders.

(d) The economic indicator for the purpose of prospective adjustments to contract prices under this clause shall be the Class I price [(base skim milk price for Class I times 0.965) plus (advanced butterfat pricing factor times 3.5)] in the announcement of advanced prices and pricing factors released by the U.S. Department of Agriculture, Agricultural Marketing Service, dairy programs. The announcement is released on the Friday before the 23rd of the month unless the 23rd of the month falls on a Friday in which case, Friday the 23rd will be the release date.

(e) Price adjustments shall be based on the following:

(1) The "base price" for the purpose of the initial adjustment calculation under this clause shall be the current month price of the economic indicator in effect at (i) the closing date for proposals, if no discussions are held, or (ii) the due date for final proposal revisions, if discussions are held. The "base price" for each subsequent monthly adjustment calculation shall be the adjusting price from the previous month.

(2) The "adjusting price" shall be the monthly price of the economic indicator released following the month used to determine the "base price".

(f) For the purpose of price adjustments pursuant to this clause:

(1) Adjustments will be made in increments of $0.01 per gallon when and only when the change per gallon in either direction is equal to or greater than +/-$0.0100.

(2) Adjustments in excess of $0.0100 per gallon and in excess of $0.0050 for units other than a gallon (i.e., half gallon, quart, pint and half pint) will be rounded to two decimal places to accommodate systems requirements of the subsistence total order receipt electronic system (STORES), as follows:

 

$0.0050 to $0.0099 = $0.01

 

$0.0100 to $0.0149 = $0.01

 

$0.0150 to $0.0199 = $0.02

 

$0.0200 to $0.0249 = $0.02

 

$0.0250 to $0.0299 = $0.03, etc.

(3) One hundred weight (CWT) as used in the price of the economic indicator equates to 11.63 gallons of milk deliverable under this contract.

(g) Promptly following release of the announcement of advanced prices and pricing factors applicable to the following month, the Contracting Officer shall compute the adjustments, if any, to the current contract prices for the purpose of determining any revised prices applicable to orders for the next month in the manner detailed below:

(1) Compute adjusting price.

(2) Compute base price.

(3) Compute change from base price.

(4) Convert the price change to price per gallon.

(5) Compute price change for other units other than a gallon.

(6) Round price adjustment(s) from lines (4) and (5) to nearest $0.01 increment (see paragraph (f)(2)).

(7) Compute adjusted contract unit price(s). The following sample price computation is an illustration using January as the base price and February as the adjusting price.

 

(1) Adjusting price

   
   

Base skim milk price for Class I

$7.72 CWT X 0.965

$ 7.4498

   

Advanced butterfat pricing factor

$0.9302 LB X 3.5

$ 3.2557

   

Class I Price

 

$10.7055

       
 

(2) Base price base skim milk

   
   

Price for Class I

$7.72 CWT X 0.965

$ 7.4498

   

Advanced butterfat pricing factor

$0.9854 LB X 3.5

$ 3.4489

   

Class I Price

 

$10.8987

       
 

(3) Change from base price per CWT

 

($0.1932)

       
 

(4) Price change per gallon Line (3) divide by 11.63 gallons/cwt

 

($0.0166)

       
 

(5) Price change per half gallon

 

($0.0083)

   

Price change per quart

 

($0.0042)

   

Price change per pint

 

($0.0021)

   

Price change per half pint

 

($0.0010)

       
 

(6) Price adjustment per gallon

 

($0.02)

   

Price adjustment per half gallon

 

($0.01)

   

Price change per quart

 

$0.00

   

Price change per pint

 

$0.00

   

Price change per half pint

 

$0.00

       
 

(7) Adjusted contract unit price

   
   

Item per gallon (current unit price - $0.02)

   
   

Item per half gallon (current unit price - $0.01)

   
   

Item per quart (No adjustment)

   
   

Item per pint (No adjustment)

   
   

Item per half pint (No adjustment)

   

(h) Revised prices will become effective on the 1st Sunday of the next month and will remain in effect until the next price change occurs.

(i) Price adjustments pursuant to this clause will not be made by separate contract modifications. Adjustments will be implemented by the government as follows, and these actions shall constitute a modification to the contract:

(1) The adjusted contract unit price(s) for the following month will be input in STORES,

(2) A facsimile transmission will be sent to Contractors who do not have electronic access, and

(3) The calculations used to derive the adjusted contract unit price(s) for the following month will be posted on the Internet.

(j) The aggregate of the increases in any contract unit price under this clause shall not exceed 30% of the original contract unit price. The original contract unit price is the price in effect on the date of award. If at any time during the term of the contract, a proposed economic price adjustment will exceed this ceiling, the Government reserves the right to raise this ceiling where changes in market conditions during the contract period support an increase. There is no percentage limitation on the amount of downward adjustments that may be made under this clause.

(k) In the event publication of the economic indicator is discontinued or its method of calculation substantially altered so that it no longer reflects market prices, the parties shall mutually agree upon an appropriate substitute for price adjustment(s) under this clause.

(l) Any dispute arising under this clause is subject to the "disputes" clause of the contract.

(End of Clause)

52.216-9032 Economic price adjustment (EPA) - Established Market Price –Alternate I.

As prescribed in 16.203-4-90(f)(i) use the following clause.

ECONOMIC PRICE ADJUSTMENT (EPA) - ESTABLISHED MARKET PRICE ALTERNATE I (FEB 2009)

(a) To the extent that contingent cost increases are provided for by this clause, the Contractor warrants that prices included in the contract do not include any amount to protect against such contingent cost increases.

(b) This EPA clause applies to Class I milk only (i.e., milk used in fluid products, including whole, low fat, extra light, nonfat and half-and-half). Any package sizes other than gallons will be pro-rated based upon the price adjustment per gallon.

(c) Class I milk, as described in this clause, is subject to the regulations of the California Department of Food and Agriculture under the stabilization and marketing plans for market milk.

(d) The economic indicator shall be the “state-wide average CWT Class 1 price based upon production”, as released monthly by the California Department of Food and Agriculture dairy marketing branch in the “minimum prices for class 1 market milk f.o.b. processing plant” price letter. (Note: The California Department of Food and Agriculture is not part of the Federal milk marketing order (FMMO) system and maintains its own milk-marketing program).

(e) Price adjustments shall be based on the following:

(1) The “base price” for the purpose of the initial adjustment calculation under this clause shall be the current month price of the economic indicator in effect at

(i) the closing date for proposals, if no discussions are held, or

(ii) the due date for final proposal revisions, if discussions are held.

The “base price” for each subsequent monthly adjustment calculation shall be the adjusting price from the previous month.

(2) The “adjusting price” shall be the monthly price of the economic indicator released following the month used to determine the “base price”.

(f) For the purpose of price adjustments pursuant to this clause:

(1) Adjustments will be made in increments of $0.01 per gallon when and only when the change per gallon in either direction is equal to or greater than +/-$0.0100.

(2) Adjustments in excess of $0.0100 per gallon and in excess of $0.0050 for units other than a gallon (i.e., half gallon, quart, pint and half pint) will be rounded to two decimal places to accommodate systems requirements of the subsistence total order receipt electronic system (STORES), as follows:

 

$0.0050 to $0.0099 = $0.01

 

$0.0100 to $0.0149 = $0.01

 

$0.0150 to $0.0199 = $0.02

 

$0.0200 to $0.0249 = $0.02

 

$0.0250 to $0.0299 = $0.03, etc.

(3) One hundred weight (CWT) as used in the price of the economic indicator equates to 11.63 gallons of milk deliverable under this contract.

(g) Promptly following release of the minimum price letter applicable to the following month, the Contracting Officer shall compute the adjustments, if any, to the current contract prices for the purpose of determining any revised prices applicable to orders for the next month in the manner detailed below:

(1) Determine adjusting price.

(2) Determine base price.

(3) Compute change from base price.

(4) Convert the price change to price per gallon.

(5) Compute price change for other units other than a gallon.

(6) Round price adjustment(s) from lines (4) and (5) to nearest $0.01 increment (see paragraph (f)(2).

(7) Compute adjusted contract unit price(s).

The following sample price computation is an illustration using January as the base price and February as the adjusting price.

(1)

Adjusting Price

$ 11.75

CWT

       

(2)

Base Price

$ 11.98

CWT

       

(3)

Change from Base Price per CWT

$(0.23)

 
       

(4)

Price change per gallon

$(0.0198)

 
 

(Line (3) divide by 11.63 gallons/cwt)

   
       

(5)

Price change per half gallon

$(0.0099)

 
 

Price change per quart

$(0.0049)

 
 

Price change per pint

$(0.0025)

 
 

Price change per half pint

$(0.0012)

 
       

(6)

Price adjustment per gallon

$ (0.02)

 
 

Price adjustment per half gallon

$ (0.01)

 
 

Price adjustment per quart

$ (0.00)

 
 

Price adjustment per pint

$ (0.00)

 
 

Price adjustment per half pint

$ (0.00)

 
       

(7)

Adjusted contract unit price

   
 

Item per gallon (Current Unit Price - $0.02)

   
 

Item per half gallon (Contract Unit Price - $0.01)

   
 

Item per quart (No adjustment)

   
 

Item per pint (No adjustment)

   
 

Item per half pint (No adjustment)

   

(h) Revised prices will become effective on the 1st Sunday of the next month and will remain in effect until the next price change occurs.

(i) Price adjustments pursuant to this clause will not be made by separate contract modifications. Adjustments will be implemented by the Government as follows, and these actions shall constitute a modification to the contract:

(1) The adjusted contract unit price(s) for the following month will be input in STORES,

(2) A facsimile transmission will be sent to Contractors who do not have electronic access, and

(3) The calculations used to derive the adjusted contract unit price(s) for the following month will be posted on the internet.

(j) The aggregate of the increases in any contract unit price under this clause shall not exceed 30% of the original contract unit price. The original contract unit price is the price in effect on the date of award. If at any time during the term of the contract, a proposed economic price adjustment will exceed this ceiling, the Government reserves the right to raise this ceiling where changes in market conditions during the contract period support an increase There is no percentage limitation on the amount of downward adjustments that may be made under this clause.

(k) In the event publication of the economic indicator is discontinued or its method of calculation substantially altered so that it no longer reflects market prices, the parties shall mutually agree upon an appropriate substitute for price adjustment(s) under this clause.

(l) Any dispute arising under this clause is subject to the “Disputes” clause of the contract.

(End of Clause)

52.216-9032 Economic price adjustment (EPA) - Established Market Price – Milk Alternate II.

As prescribed in 16.203-4-90(f)(ii) use the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) - ESTABLISHED MARKET PRICE – MILK ALTERNATE II (FEB 2009)

(a) To the extent that contingent cost increases are provided for by this clause, the Contractor warrants that prices included in the contract do not include any amount to protect against such contingent cost increases.

(b) This EPA clause applies to skim milk and butterfat fluid milk products classified as Class I milk only (i.e., whole milk, fat-free milk, low fat milk, light milk, reduced fat milk, milk drinks, eggnog and cultured buttermilk, including any such beverage products that are flavored, cultured, modified with added nonfat milk solids, sterilized, concentrated, or reconstituted. As used in this paragraph, the term concentrated milk means milk that contains not less than 25.5 percent, and not more than 50 percent, total milk solids). Any package sizes other than gallons will be pro-rated based upon the price adjustment per gallon.

(c) Class I milk, as described in this clause, is subject to the regulations of the United States Department of Agriculture under the Federal milk marketing orders.

(d) The economic indicator for the purpose of prospective adjustments to contract prices under this clause shall be the Class I price [(base skim milk price for Class I times 0.965) plus (advanced butterfat pricing factor times 3.5)] in the announcement of advanced prices and pricing factors released by the U.S. Department of Agriculture, Agricultural Marketing Service, Dairy Programs. The announcement is released on the Friday before the 23rd of the month unless the 23rd of the month falls on a Friday in which case, Friday the 23rd will be the release date.

(e) Price adjustments shall be based on the following:

(1) The “base price” for the purpose of the initial adjustment calculation under this clause shall be the current month price of the economic indicator in effect at

(i) the closing date for proposals, if no discussions are held, or

(ii) the due date for final proposal revisions, if discussions are held.

The “base price” for each subsequent monthly adjustment calculation shall be the adjusting price from the previous month.

(2) The “adjusting price” shall be the monthly price of the economic indicator released following the month used to determine the “base price”.

(f) For the purpose of price adjustments pursuant to this clause:

(1) Adjustments will be made when and only when the change per gallon in either direction is equal to or greater than +/-$0.0100.

(2) Adjustments will be rounded to two decimal places to accommodate systems requirements of the subsistence total order receipt electronic system (STORES).

(3) One hundred weight (CWT) as used in the price of the economic indicator equates to 11.63 gallons of milk deliverable under this contract.

(g) Promptly following release of the Announcement of Advanced Prices and Pricing Factors applicable to the following month, the Contracting Officer shall compute the adjustments, if any, to the current contract prices for the purpose of determining any revised prices applicable to orders for the next month in the manner detailed below:

(1) Compute adjusting price.

(2) Compute base price.

(3) Compute change from base price.

(4) Convert the price change to price per gallon.

(5) Compute price change for a box of 27 half pints (1.6875 gallons).

(6) ompute adjusted contract unit price(s).

The following sample price computation is an illustration using January as the base price and February as the adjusting price.

 

(1) Adjusting price

   
   

Base skim milk price for Class I

$7.72 CWT X 0.965

$ 7.4498

   

Advanced butterfat pricing factor

$0.9302 LB X 3.5

$ 3.2557

   

Class I Price

 

$10.7055

         
 

(2) Base price

   
   

Base skim milk price for Class I

$7.72 CWT X 0.965

$ 7.4498

   

Advanced butterfat pricing factor

$0.9854 LB X 3.5

$ 3.4489

   

Class I Price

 

$10.8987

         
 

(3) Change from base price per CWT

 

($0.1932)

         
 

(4) Price change per gallon Line (3) divide by 11.63 gallons/cwt

 

($0.0166)

         
 

(5) Price change per box

   
   

($0.0166) x 1.6875 gallons

 

($0.0280)

   

Rounded to two decimals

 

($0.03)

         
 

(6) Adjusted contract unit price

   
   

Current unit price - $0.03

   

(h) Revised prices will become effective on the 1st Sunday of the next month and will remain in effect until the next price change occurs.

(i) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit prices.

(j) Payment on this contract shall be at the current contract price, which shall change upon issuance of an adjusting modification.

(k) The aggregate of the increases in any contract unit price under this clause shall not exceed 30% of the original contract unit price. The original contract unit price is the price in effect on the date of award. If at any time during the term of the contract, a proposed economic price adjustment will exceed this ceiling, the Government reserves the right to raise this ceiling where changes in market conditions during the contract period support an increase. There is no percentage limitation on the amount of downward adjustments that may be made under this clause.

(l) In the event publication of the economic indicator is discontinued or its method of calculation substantially altered so that it no longer reflects market prices, the parties shall mutually agree upon an appropriate substitute for price adjustment(s) under this clause.

(m) Any dispute arising under this clause is subject to the “Disputes” clause of the contract.

(End of Clause)

52.216-9032 Economic price adjustment (EPA) - Established Market Price – Milk Alternate III.

As prescribed in 16.203-4-90(f)(iii) use the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) - ESTABLISHED MARKET PRICE – MILK ALTERNATE III (FEB 2009)

(a) To the extent that contingent cost increases are provided for by this clause, the Contractor warrants that prices included in the contract do not include any amount to protect against such contingent cost increases.

(b) This EPA clause applies to Class I milk only (i.e., milk used in fluid products, including whole, low fat, extra light, nonfat and half-and-half). Any package sizes other than gallons will be pro-rated based upon the price adjustment per gallon.

(c) Class I milk, as described in this clause, is subject to the regulations of the California Department of Food and Agriculture under the stabilization and marketing plans for market milk.

(d) The economic indicator shall be the “State-Wide Average CWT Class 1 Price Based Upon Production”, as released monthly by the California Department of Food and Agriculture dairy marketing branch in the “Minimum Prices for Class 1 Market Milk F.O.B. Processing Plant” price letter. (Note: The California Department of Food and Agriculture is not part of the federal milk marketing order (FMMO) system and maintains its own milk-marketing program).

(e) Price adjustments shall be based on the following:

(1) The “base price” for the purpose of the initial adjustment calculation under this clause shall be the current month price of the economic indicator in effect at

(i) the closing date for proposals, if no discussions are held, or

(ii) the due date for final proposal revisions, if discussions are held.

The “base price” for each subsequent monthly adjustment calculation shall be the adjusting price from the previous month.

(2) The “adjusting price” shall be the monthly price of the economic indicator released following the month used to determine the “base price”.

(f) For the purpose of price adjustments pursuant to this clause:

(1) Adjustments will be made when and only when the change per gallon in either direction is equal to or greater than +/-$0.0100.

(2) Adjustments will be rounded to two decimal places to accommodate systems requirements of the subsistence total order receipt electronic system (STORES).

(3) One hundred weight (CWT) as used in the price of the economic indicator equates to 11.63 gallons of milk deliverable under this contract.

(g) Promptly following release of the minimum price letter applicable to the following month, the Contracting Officer shall compute the adjustments, if any, to the current contract prices for the purpose of determining any revised prices applicable to orders for the next month in the manner detailed below:

(1) Determine adjusting price.

(2) Determine base price.

(3) Compute change from base price.

(4) Convert the price change to price per gallon.

(5) Compute price change for a box of 27 half pints (1.6875 gallons).

(6) Compute adjusted contract unit price(s).

The following sample price computation is an illustration using January as the base price and February as the adjusting price.

(1)

Adjusting price

$11.75

CWT

       

(2)

Base price

$11.98

CWT

       

(3)

Change from base price per CWT

($0.23)

 
       

(4)

Price change per gallon

($0.0198)

 
 

(Line (3) divide by 11.63 gallons/cwt)

   
       

(5)

Price change per box

   
 

($0.0198) x 1.6875 gallons

($0.0334)

 
 

Rounded to two decimals

($0.03)

 
       

(6)

Adjusted contract unit price

   
 

Current unit price - $0.03

   

(h) Revised prices will become effective on the 1st Sunday of the next month and will remain in effect until the next price change occurs.

(i) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit prices.

(j) Payment on this contract shall be at the current contract price, which shall change upon issuance of an adjusting modification.

(k) The aggregate of the increases in any contract unit price under this clause shall not exceed 30% of the original contract unit price. The original contract unit price is the price in effect on the date of award. If at any time during the term of the contract, a proposed economic price adjustment will exceed this ceiling, the Government reserves the right to raise this ceiling where changes in market conditions during the contract period support an increase There is no percentage limitation on the amount of downward adjustments that may be made under this clause.

(l) In the event publication of the economic indicator is discontinued or its method of calculation substantially altered so that it no longer reflects market prices, the parties shall mutually agree upon an appropriate substitute for price adjustment(s) under this clause.

(m) Any dispute arising under this clause is subject to the “disputes” clause of the contract.

(End of Clause)

52.216-9033 Economic Price Adjustment (EPA) - Established Prices.

As prescribed in 16.203-4-90(g), use the following clause. Complete paragraph (c)(1) by entering the appropriate percentage price increase ceiling, considering the length of contract performance. Any percentage over 10 percent requires approval by the chief of the contracting office.

ECONOMIC PRICE ADJUSTMENT – ESTABLISHED PRICES (FEB 2009)

(a) The Contractor warrants that the unit price stated in the Schedule for _________ [offeror insert Schedule line item number] is not in excess of the Contractor’s applicable established price in effect on the contract date for like quantities of the same item. The term “unit price” excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term “established price” means a price that --

(1) Is an established catalog or market price for a commercial item sold in substantial quantities to the general public; and

(2) Is the net price after applying any standard trade discounts offered by the Contractor.

(b) The Contractor shall promptly notify the Contracting Officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those items delivered on and after the effective date of the decrease in the Contractor’s established price, and this contract shall be modified accordingly.

(c) If the Contractor’s applicable established price is increased after the contract date, the corresponding contract unit price shall be increased, upon the Contractor’s written request to the Contracting Officer, by the same percentage that the established price is increased, and the contract shall be modified accordingly, subject to the following limitations:

(1) The aggregate of the increases in any contract unit price under this clause shall not exceed ___ percent of the original contract unit price.

(2) The increased contract unit price shall be effective –

(i) On the effective date of the increase in the applicable established price if the Contracting Officer receives the Contractor’s written request within 10 days thereafter; or

(ii) If the written request is received later, on the date the Contracting Officer receives the request.

(3) The increased contract unit price shall not apply to quantities scheduled under the contract for delivery before the effective date of the increased contract unit price, unless failure to deliver before that date results from causes beyond the control and without the fault or negligence of the Contractor, within the meaning of the default clause.

(4) No modification increasing a contract unit price shall be executed under this paragraph (c) until the Contracting Officer verifies the increase in the applicable established price.

(5) Within 30 days after receipt of the Contractor’s written request, the Contracting Officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase, except as follows.

(i) The Contractor may, after that time, deliver any items that were completed or in the process of manufacture at the time of receipt of the cancellation notice, provided the Contractor certifies and notifies the Contracting Officer of such items within 10 days after the Contractor receives the cancellation notice.

(ii) The Government shall pay for those items at the contract unit price increased to the extent provided by paragraph (d) of this clause.

(iii) Any standard steel supply item shall be deemed to be in the process of manufacture when the steel for that item is in the state of processing after the beginning of the furnace melt.

(d) During the time allowed for the cancellation provided for in subparagraph (c)(5) of this clause, and thereafter if there is no cancellation, the Contractor shall continue deliveries according to the contract delivery schedule, and the Government shall pay for such deliveries at the contract unit price, increased to the extent provided by paragraph (c) of this clause.

(e) The Contractor shall certify on each invoice that each unit price stated therein reflects all decreases required by this clause and shall certify on the final invoice that all price decreases required by this clause have been applied in the manner required herein.

(f) Disputes. Any dispute arising under this clause shall be determined in accordance with the Disputes clause of the contract.

(End of Clause)

52.216-9034 Economic Price Adjustment – Published Market Price – Silver.

As prescribed in 16.203-4-90(h), use the following clause.

ECONOMIC PRICE ADJUSTMENT – PUBLISHED MARKET PRICE – SILVER (FEB 2009)

(a) Warranties. The Contractor warrants that--

(1) The base unit prices set forth in the schedule do not include allowances for any portion of the contingency covered by this clause;

(2) ____ ounces of silver are contained in each unit offered which will be the basis for price adjustment under this clause; and

(3) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause:

(1) "Unit price" means the unit price offered, as set out in the contract schedule.

(2) "Base market price" means the sum of one-half the simple average of the Englehard industrial bullion quotations, plus one-half the simple average of the Handy and Harman base price quotations, for silver on the New York market over the fifteen working days immediately preceding bid opening, or the date of award for negotiated contracts, as reported in the Wall Street Journal. If the quotation for silver on a particular day is set out as a range of prices, the average of these prices shall be considered the price for that day.

(3) "Adjusting market price" means the sum of one-half the simple average of the Englehard industrial bullion quotations, plus one-half the Handy and Harman Base Price Quotations, for silver on the New York market, as reported in the Wall Street Journal, for the fifteen working days prior to a delivery date specified in the contract schedule or delivery order. If the quotation for silver on a particular day is set out as a range of prices, the average of these prices shall be considered the price for that day.

(4) "Weight factor" means the amount of silver contained in each unit delivered. For purposes of this definition, the amount of silver per unit will be deemed to be the number of troy ounces stated in paragraph (a)(2).

(5) "Delivery date" means the date originally specified in the contract or delivery order plus any extension attributable solely to reasons determined by the Contracting Officer to be excusable within the meaning of the "Default" clause. It does not include any extension of the delivery schedule, however accomplished, except for such excusable causes.

(c) Adjustments.

(1) Notification. The Contractor shall promptly notify the Contracting Officer in writing, with accompanying calculations, upon a net change (increase or decrease) of $500 or more in the price of the items scheduled for delivery under an order due to an increase or decrease in the price of silver, as calculated in accordance with (c)(2) below. No adjustment will be made under this clause unless the calculated price change for an individual order resulting from change in the price of silver is $500 or more.

(2) Calculations. All calculations shall be rounded to two decimal places. The price adjustment will be calculated by computing, as a dollar amount per ounce of silver, the difference (increase or decrease) between the base market price and the adjusting market price, multiplying the result by the number of ounces of silver per unit specified in (a)(2) above, and adding or subtracting (as appropriate) that result to/from the unit price, resulting in the adjusted contract unit price applicable to that order.

(3) Modification. Price adjustments under this clause shall be effected by contract modifications showing the base market price, calculation of the adjusting market price, the base unit price, and the calculations used to arrive at the adjusted contract unit price(s).

(4) Exceptions.

(i) No adjustment is allowed based on Contractor requests for a price increase that are submitted more than sixty days after the delivery date of items for which a price increase is requested.

(ii) There will be no adjustment for increases which occur after the required delivery date unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Default clause of this contract.

(5) Invoices. The prices payable for a particular delivery under this contract will be the contract unit price for the items supplied plus the product of the net difference between the applicable adjusting market price and the base market price times the weight factor times the number of units delivered.

(d) Upward ceiling on economic price adjustment. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed ___% of the original base unit price in any applicable contract year (whether a single year or multiyear program), except as provided hereafter:

(i) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The contract ceiling price means the unit price limitation stated in (d). The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the market price would raise a contract unit price for an item above the current ceiling, the Contracting Officer may issue a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(e) Revision of market price indicator. In the event --

(1) A market price is discontinued or its method of derivation is altered substantially; or

(2) The Contracting Officer determines that a market price consistently and substantially fails to reflect market conditions,

The parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the price was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(f) Options. If this contract contains a term (period) option provision which is exercised, the contract price(s) for each succeeding term shall be subject to adjustment pursuant to this EPA clause. The contract price(s) in effect on the last day of the term or period immediately preceding the period for which the option has been exercised will be the contract price(s) on the first day of the succeeding option period.

(g) Disputes. Any dispute arising under this clause shall be determined in accordance with the Disputes clause of the contract.

(h) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(End of Clause)

52.216-9035 Economic Price Adjustment – Published Market Price – Lead.

As prescribed in 16.203-4-90(i), use the following clause.

ECONOMIC PRICE ADJUSTMENT – PUBLISHED MARKET PRICE – LEAD (FEB 2009)

(a) arranties. The Contractor warrants that—

(1) The base unit prices set forth in the schedule do not include allowances for any portion of the contingency covered by this clause;

(2) ___ pounds of lead are contained in each unit offered which will be the basis for price adjustment under this clause; and

(3) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause:

(1) “Unit price” means the unit price offered, as set out in the contract schedule.

(2) “Base market price” means the average of the prices for standard lead as reported on the London metals exchange, over the fifteen working days immediately preceding bid opening or the day set for receipt of proposals. If the quotation for lead on a particular day is set out as a range of prices, the average of these prices shall be considered the price for that day.

(3) “Adjusting market price” means the average price of standard lead as reported on the London metals exchange, for the fifteen working days prior to a delivery date specified in the contract schedule or delivery order.

(4) “Weight factor” means the amount of lead contained in each unit delivered. For purposes of this definition, the amount of lead per unit will be deemed to be the number of pounds stated in (a)(2) of this clause, rounded off to the nearest hundredth of a pound.

(5) “Delivery date” means the date originally specified in the contract or delivery order plus any extension attributable solely to reasons determined by the Contracting Officer to be excusable within the meaning of the "default" clause. It does not include any extension of the delivery schedule, however accomplished, except for such excusable causes

(c) Adjustments.

(1) Notification. The Contractor shall promptly notify the Contracting Officer in writing, with accompanying calculations, upon a net change (increase or decrease) of at least $500 in the price of the items scheduled for delivery. No adjustment will be made under this clause unless the total change in the contract amount is $500 or more.

(2) Calculations. All calculations shall be rounded to two decimal places.

(3) Modification. Price adjustments under this clause shall be effected by contract modifications showing the base market price, calculation of the adjusting market price, the base unit price, and the calculations used to arrive at the adjusted contract unit price(s).

(4) Exceptions.

(i) The Contractor claims for a price increase that are submitted more than sixty days after the delivery date of items for which a price adjustment under this clause is requested will not be honored.

(ii) There will be no adjustment for increases which occur after the required delivery date unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the default clause of this contract.

(5) Invoices. The prices payable for a particular delivery under this contract will be the contract unit price for the items supplied and the product of the net difference (adjusting market price less the base market price) times the weight factor, multiplied by the number of units delivered.

(d) The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed ____% of the original base unit price in any applicable contract year (whether a single year or multiyear program), except as provided hereafter:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the market price would raise a contract unit price for an item above the current ceiling, the Contracting Officer may issue a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(e) Revision of market price indicator. In the event –

(1) A market price is discontinued or its method of derivation is altered substantially; or

(2) The Contracting Officer determines that a market price consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the price was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(f) Options. If this contract contains a term (period) option provision which is exercised, the contract price(s) for each succeeding term shall be subject to adjustment pursuant to this EPA clause. The contract price(s) in effect on the last day of the term or period immediately preceding the period for which the option has been exercised will be the contract price(s) on the first day of the succeeding option period.

(g) Disputes. Any dispute arising under this clause shall be determined in accordance with and subject to the "disputes" clause of the contract.

(h) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(End of Clause)

52.216-9036 Evaluation of Offers – Economic Price Adjustment.

As prescribed in 16.203-4-90(j)(i), use the following clause.

EVALUATION OF OFFERS - ECONOMIC PRICE ADJUSTMENT (FEB 2009)

(a) Offers in response to solicitations will be evaluated without adding any amount for economic price adjustment unless the economic price adjustment (EPA) clause included in the solicitation provides for offerors to specify the portion of the contract price subject to EPA. In this case, the offered price(s) subject to the EPA clause will be adjusted to the maximum possible extent under the EPA using the price ceiling limitation provision of such clause for the basic contract plus all options covered by the evaluation. The resulting price(s) will be used for evaluation of offers.

(b) If a successful offeror stipulates a lower maximum increase limitation then that included in the solicitation, it will be incorporated into the resulting contract.

(c) Offers which (1) increase the maximum ceiling percentage specified in the solicitation, (2) stipulate a maximum decrease limit, or (3) delete or otherwise alter the economic price adjustment clause, will not be considered for award, unless the Contracting Officer determines that award on such basis is in the best interests of the Government and all Offerors are afforded an opportunity to offer on the same basis.

(End of Clause)

52.216-9037 Evaluation of Bids – Economic Price Adjustment.

As prescribed in 16.203-4-90(j)(ii), use the following clause.

EVALUATION OF BIDS - ECONOMIC PRICE ADJUSTMENT (NOV 2011)

(a) Bids will be evaluated without adding any amount for economic price adjustment.

(b) If the bid selected for award stipulates an economic price adjustment ceiling lower than that included in the solicitation, it will be incorporated into the resulting contract.

(c) Bids will be rejected as nonresponsive if they:

(1) increase the maximum percentage stipulated,

(2) stipulate a maximum decrease limit or

(3) delete or otherwise alter the economic price adjustment clause.

(End of Clause)

52.216-9038 Price Redetermination – Prospective (DEVIATION - PERMANENT).

As prescribed in 16.205-4-90(a), insert the following clause:

PRICE REDETERMINATION PROSPECTIVE (DEVIATION - PERMANENT) (DEC 2012)

(a) General. The unit prices and the total price stated in this contract shall be periodically redetermined in accordance with this clause, except that --

(1) The prices for supplies ordered and services performed before the first effective date of price redetermination (see paragraph (c) of this clause) shall remain fixed; and

(2) In no event shall the total amount paid under this contract exceed any ceiling price included in the contract.

(b) Definition. “Costs,” as used in this clause, means allowable costs in accordance with Part 31 of the Federal Acquisition Regulation (FAR) in effect on the date of this contract.

(c) Price redetermination periods. For the purpose of price redetermination, performance of this contract is divided into successive periods. The first period shall extend from the date of the contract to ________, (see note (1)) and the second and each succeeding period shall extend for ______ [insert appropriate number] months from the end of the last preceding period, except that the parties may agree to vary the length of the final period. The first day of the second and each succeeding period shall be the effective date of price redetermination for that period.

(d) Data submission.

(1) Not more than _______ nor less than ______ (see note (2)) days before the end of each redetermination period, except the last, the Contractor shall submit --

(i) Proposed prices for supplies that may be ordered or services that may be performed in the next succeeding period, and –

(A) An estimate and breakdown of the costs of these supplies or services in the format of Table 15-2, FAR 15.408, or in any other form on which the parties may agree;

(B) Sufficient data to support the accuracy and reliability of this estimate; and

(C) An explanation of the differences between this estimate and the original (or last preceding) estimate for the same supplies or services; and

(ii) A statement of all costs incurred in performing this contract through the end of the ___ month (see Note (3) before the submission of proposed prices in the format of Table 15-2, FAR 15.408 (or in any other form on which the parties may agree), with sufficient supporting data to disclose unit costs and cost trends for --

(A) Supplies ordered and services performed; and

(B) Inventories of work in process and undelivered contract supplies on hand (estimated to the extent necessary).

(2) The Contractor shall also submit, to the extent that it becomes available before negotiations on redetermined prices are concluded –

(i) Supplemental statements of costs incurred after the date stated in subdivision (d)(1)(ii) of this section for --

(A) Supplies ordered and services performed; and

(B) Inventories of work in process and undelivered contract supplies on hand (estimated to the extent necessary); and

(C) Any other relevant data that the Contracting Officer may reasonably require.

(3) If the Contractor fails to submit the data required by subparagraphs (d)(1) and (2) of this section, within the time specified, the Contracting Officer may suspend payments under this contract until the data are furnished. If it is later determined that the Government has overpaid the Contractor, the Contractor shall repay the excess to the Government immediately. Unless repaid within 30 days after the end of the data submittal period, the amount of the excess shall bear interest, computed from the date the data were due to the date of repayment, at the rate established in accordance with the Interest clause.

(e) Price redetermination. Upon the Contracting Officer’s receipt of the data required by paragraph (d) of this section, the Contracting Officer and the Contractor shall promptly negotiate to redetermine fair and reasonable prices for supplies that may be ordered or services that may be performed in the period following the effective date of price redetermination.

(f) Contract modifications. Each negotiated redetermination of prices shall be evidenced by a modification to this contract, signed by the Contractor and the Contracting Officer, stating the redetermined prices that apply during the redetermination period.

(g) Adjusting billing prices. Pending execution of the contract modification (see paragraph (f) of this section), the Contractor shall submit invoices or vouchers in accordance with the billing prices stated in this contract. If at any time it appears that the then-current billing prices will be substantially greater than the estimated final prices, or if the Contractor submits data showing that the redetermined price will be substantially greater than the current billing prices, the parties shall negotiate an appropriate decrease or increase in billing prices. Any billing price adjustment shall be reflected in a contract modification and shall not affect the redetermination of prices under this clause. After the contract modification for price redetermination is executed, the total amount paid or to be paid on all invoices or vouchers shall be adjusted to reflect the agreed-upon prices, and any requested additional payments, refunds, or credits shall be made promptly.

(h) Quarterly limitation on payments statement. This paragraph (h) applies only during periods for which firm prices have not been established.

(1) Within 45 days after the end of the quarter of the Contractor’s fiscal year in which a delivery is first made (or services are first performed) and accepted by the Government under this contract, and for each quarter thereafter, the Contractor shall submit to the contract administration office (with a copy to the contracting office and the cognizant contract auditor) a statement, cumulative from the beginning of the contract, showing --

(i) The total contract price of all supplies or services ordered and accepted by the Government and for which final prices have been established;

(ii) The total costs (estimated to the extent necessary) reasonably incurred for, and properly allocable solely to, the supplies or services ordered and accepted by the Government and for which final prices have not been established;

(iii) The portion of the total interim profit (used in establishing the initial contract price or agreed to for the purpose of this paragraph (h)) that is in direct proportion to the supplies or services ordered and accepted by the Government and for which final prices have not been established; and

(iv) The total amount of all invoices or vouchers for supplies or services ordered and accepted by the Government (including amounts applied or to be applied to liquidate progress payments).

(2) The statement required by subparagraph (h)(1) of this section need not be submitted for any quarter for which either no costs are to be reported under subdivision (h)(1)(ii) of this section, or revised billing prices have been established in accordance with paragraph (g) of this section, and do not exceed the existing contract price, the Contractor’s price-redetermination proposal, or a price based on the most recent quarterly statement, whichever is least.

(3) Notwithstanding any provision of this contract authorizing greater payments, if on any quarterly statement the amount under subdivision (h)(1)(iv) of this section exceeds the sum due the Contractor, as computed in accordance with subdivisions (h)(1)(i), (ii), and (iii) of this section, the Contractor shall immediately refund or credit to the Government the amount of this excess. The Contractor may, when appropriate, reduce this refund or credit by the amount of any applicable tax credits due the Contractor under 26 U.S.C.1481 and by the amount of previous refunds or credits affected under this clause. If any portion of the excess has been applied to the liquidation of progress payments, then that portion may, instead of being refunded, be added to the unliquidated progress payment account, consistent with the Progress Payments clause. The Contractor shall provide complete details to support any claimed reductions in refunds.

(4) If the Contractor fails to submit the quarterly statement within 45 days after the end of each quarter and it is later determined that the Government has overpaid the Contractor, the Contractor shall repay the excess to the Government immediately. Unless repaid within 30 days after the end of the statement submittal period, the amount of the excess shall bear interest, computed from the date the quarterly statement was due to the date of repayment, at the rate established in accordance with the Interest clause.

(i) Subcontracts. No subcontract placed under this contract may provide for payment on a cost-plus-a-percentage-of-cost basis.

(j) Disagreements. If the Contractor and the Contracting Officer fail to agree upon redetermined prices for any price redetermination period within 60 days (or within such other period as the parties agree) after the date on which the data required by paragraph (d) of this section are to be submitted, the Contracting Officer shall promptly issue a decision in accordance with the Disputes clause. For the purpose of paragraphs (f), (g), and (h) of this section, and pending final settlement of the disagreement on appeal, by failure to appeal, or by agreement, this decision shall be treated as an executed contract modification. Pending final settlement, price redetermination for subsequent periods, if any, shall continue to be negotiated as provided in this clause.

(k) Termination. If this contract is terminated, prices shall continue to be established in accordance with this clause for

(1) completed supplies and services accepted by the Government and

(2) those supplies and services not terminated under a partial termination. All other elements of the termination shall be resolved in accordance with other applicable clauses of this contract.

(End of Clause)

Notes:

(1) Express in terms of units ordered, or as a date; but in either case the period should end on the last day of a month.

(2) Insert the numbers of days chosen so that the Contractor’s submission will be late enough to reflect recent cost experience (taking into account the Contractor’s accounting system), but early enough to permit review, audit (if necessary), and negotiation before the start of the prospective period.

(3) Insert “first,” except that “second” may be inserted if necessary to achieve compatibility with the Contractor’s accounting system.

52.216-9039 Economic Price Adjustment – Standard Supplies - DEVIATION.

As prescribed in 16.203-4(a)(1)(S-91), insert the following

ECONOMIC PRICE ADJUSTMENT – STANDARD SUPPLIES – DEVIATION (JAN 2009)

(a) The Contractor warrants that the unit price stated in the schedule for _________ [offeror insert schedule line item number] is not in excess of the Contractor’s applicable established price in effect on the contract date for like quantities of the same item. The term “unit price” excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term “established price” means a price that --

(1) Is an established catalog or market price for a commercial item sold in substantial quantities to the general public; and

(2) Is the net price after applying any standard trade discounts offered by the Contractor.

(b) The Contractor shall promptly notify the Contracting Officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those items ordered on and after the effective date of the decrease in the Contractor’s established price, and this contract shall be modified accordingly.

(c) If the Contractor’s applicable established price is increased after the contract date, the corresponding contract unit price shall be increased, upon the Contractor’s written request to the Contracting Officer, by the same percentage that the established price is increased, and the contract shall be modified accordingly, subject to the following limitations:

(1) The aggregate of the increases in any contract unit price under this clause shall not exceed 10 percent of the contract unit price [at the outset of each performance/ordering period].

(2) The increased contract unit price shall be effective --

(i) On the effective date of the increase in the applicable established price if the Contracting Officer receives the Contractor’s written request within 10 days thereafter; or

(ii) If the written request is received later, on the date the Contracting Officer receives the request.

(3) The increased contract unit price shall not apply to quantities [ordered] under the contract before the effective date of the increased contract unit price.

(4) No modification increasing a contract unit price shall be executed under this paragraph (c) until the Contracting Officer verifies the increase in the applicable established price.

(5) Within 30 days after receipt of the Contractor’s written request, the Contracting Officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase.

(d) During the time allowed for the cancellation provided for in subparagraph (c)(5) of this clause, and thereafter if there is no cancellation, the Contractor shall continue deliveries according to the contract delivery schedule, and the Government shall pay for such deliveries at the contract unit price, increased to the extent provided by paragraph (c) of this clause.

(End of Clause)

52.216-9040 Economic Price Adjustment – Established Catalog Price Two Upward Adjustments Per Year Open Season E-CAT Solicitation.

As prescribed in 16.203-4(a)(2)(90)(i), 16.203-4(a)(2)(96)(ii), and 16.203-4(a)(2)(97)(iii), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – ESTABLISHED CATALOG PRICE TWO UPWARD ADJUSTMENTS PER YEAR OPEN SEASON E-CAT SOLICITATION (MAR 2016)

(a) All price adjustments authorized or mandated by this clause are based upon changes in the Contractor’s list prices and certain Federal Supply Schedule (FSS) unit prices. The clause also provides for voluntary price reductions (VPR) in the form of “specials” or “discounts”.

(b) Definitions:

(1) Contract unit price: The price per unit of issue comprised of the “list price” and the applicable “discount”. The contract unit price is determined by reducing the applicable list price by the appropriate discount. Proposed revised prices are loaded by the Contractor into an E-CAT file and are forwarded electronically to the Government. The Contractor shall also separately submit (in Excel spreadsheet or ACCESS database format) the additional information as required in paragraphs (g) and (h) below in order for the Government to review and evaluate these proposed price changes. Upon the Government’s determination that the offered unit prices are acceptable/fair and reasonable, the Government shall release them into the contract electronic catalog residing in the E-CAT system. (Contract unit prices, list prices, and discounts under this contract are not visible in the E-CAT System to the Contractor or any customer. The prices visible in the E-CAT system to the Contractor or any customer are the delivered unit prices which are the contract unit prices plus the DLA Troop Support administrative fee percentage (in effect at that time) charged customers ordering under this contract.)

(2) Discount: The percentage reduction off the list price proposed by the Contractor, accepted by the Government, and maintained in the contract file (not the E-CAT System) by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. These discounts are in addition to any standard trade discounts in the Contractor’s established commercial catalog/price list. (Contractors may offer larger discounts and/or reduced list prices at any time.)

(3) List price: The established catalog unit prices of the items. In order for a “list price” to meet the criteria as an established catalog price, it must meet the definition in (c)(1) below.

(4) Voluntary price reduction (VPR): See paragraph (l).

(c) Established catalog unit price.

(1) The term "established catalog unit price", as used in this clause, means a unit price that (i) is a catalog price for a commercial item sold in substantial quantities to the general public and (ii) is the net price after applying any standard trade discounts offered by the Contractor.

(2) Unless otherwise specified, all reference to the terms “FSS unit price”(s) or “FSS price(s)” as used in this clause, shall be the prices appearing in the Contractor’s current Federal Supply Schedule for the same items under this contract.

(d) The offeror/Contractor warrants that (1) the list prices and the subsequent revisions thereto are the established catalog unit prices in effect at time of award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these list prices do not include allowances for any portion of the contingency covered by this clause. The offeror/Contractor also warrants that any contract unit prices determined using FSS unit prices do not include allowances for any portion of the contingency covered by this clause.

(e) Prior to award, the Contractor must furnish:

(1) their current established catalog/price list, offered discounts, proposed contract unit prices; and

(2) a copy of their current FSS’s, FSS unit prices, and the FSS contract expiration dates applicable to items offered as well as any other information required by the Contracting Officer.

(f) Upon acceptance by the Government, the award unit prices will be established at the list prices minus the offered discounts provided the resulting contract unit prices do not exceed the current FSS unit price for the same item. Accordingly, offers are cautioned to propose discounts which, when applied to the list prices, will not exceed FSS unit prices.

(g) Downward adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in either 1) list prices or 2) FSS unit prices when the reduction results in a revised FSS Price which is now lower than the current contract unit price. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in list price and any FSS unit price reduction which results in an FSS unit price which is now lower than the current contract unit price. If the offered price decrease is based upon a reduction in list price or FSS price, the Contractor shall propose a lower contract unit price taking into consideration the benchmarks in paragraphs (g)(2) and (3) below.

The Contractor must furnish a copy of the revised catalog/price list or FSS unit price as soon as it is available. Also, for reductions in list prices, the Contractor must provide a copy of the “E-CAT file” at least 60 days, unless otherwise specified in the contract, prior to the date when the reduced list prices take effect. For reductions in FSS, the Contractor shall provide a copy of the E-CAT file at least 30 days, unless otherwise specified in the contract, prior to the date the reduced FSS unit price takes effect.

In addition to the “E-CAT file” and any other information required by the Contracting Officer, the Contractor shall also separately furnish, within the appropriate timeframe above (i.e., at least 60 days, unless otherwise specified in the contract, for a reduction in list price; at least 30 days, unless otherwise specified in the contract, for a reduction in FSS), an Excel spreadsheet or ACCESS database (in both hard copy and disc) that displays for each item with an offered decrease in contract unit price the appropriate information below:

(i) For list price or FSS changes: The item number; e.g., 0001AA.

(ii) For list price or FSS changes: The supplier (catalog); e.g., ABC Imaging, Inc.

(iii) For list price or FSS changes: The product name/nomenclature; e.g., high speed handpiece.

(iv) For list price or FSS changes: part number; HIH 2000

(v) For list price or FSS changes: The list price upon which the current contract unit price is based.

(vi) For list price or FSS changes: The applicable contract discount used as a basis for determining the current contract unit price.

(vii) For list price or FSS changes: The contract unit price currently in effect.

(viii) For list price changes: The reduced list price.

(ix) For list price or FSS changes: The applicable contract discount or larger contract discount now offered.

(x) For list price or FSS changes: The reduced contract unit price now offered.

(xi) For list price changes: The percentage decrease in list price from the list price which determined the current contract unit price to the new, lower list price.

(xii) For list price changes: The percentage change in contract unit price from the current contract unit price to the new lower contract unit price now offered.

(xiii) For FSS changes: The current FSS unit price which is about to expire and the new reduced FSS unit price which will replace it and triggered this contract unit price reduction.

(xiv) For list price changes: For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS unit price(s) for the same item.

(2) Reductions in list price(s). f the offered price decrease is based upon a reduction in the list price, the appropriate discount or larger discount now offered will be applied to each reduced list price to determine the adjusted contract unit price provided the proposed lower contract unit price does not exceed the lower of the following two benchmarks:

(i) The offered reduction in contract unit price on a percentage basis must be at least equal to the percentage reduction from the list price currently in effect under the contract to the new lower list price; i.e., the current contract unit price must, as a minimum, be reduced by the percentage decrease in list price.

(ii) The new proposed lower contract unit price shall not exceed the current FSS unit price for the same item.

(3) FSS price reductions. If the offered price decrease is based upon a reduction in the FSS price, the proposed lower contract unit price shall not exceed the following benchmark: The new proposed lower contract unit price shall not exceed the revised lower FSS price for the same item.

(4) If the proposed contract unit price exceeds the lower of the appropriate list price benchmarks (for reductions based upon reduced list prices) or the FSS price benchmark (for reductions based upon reduced FSS prices), the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a contract unit price that does not exceed the appropriate benchmarks.

(i) All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the list or FSS price(s) and discount(s) which make up these prices.)

(ii) If an agreement cannot be reached the Contracting Officer has the option of removing these items from the E-CAT system or taking the action in the last sentence below. If the proposed contract unit price does not exceed the lowest of the appropriate list price or FSS price benchmarks, it will be determined fair and reasonable.

(iii) Upon acceptance of any proposed price decreases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the reduced Contract unit prices. These reduced Contract unit prices shall apply to those items ordered on or after the date when these prices appear in the contract electronic catalog residing in the E-CAT system. (Revisions will not be added to the electronic catalog prior to date they take effect).

(iv) If the Contractor fails to notify the Contracting Officer of any list price or FSS price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the effective date of the decrease in the Contractor’s established list or FSS prices.

(h) Upward Adjustments.

(1) The Contractor is authorized to submit a maximum of two requests for upward adjustment for each contract year. Each request for upward price adjustment must be based upon increases in list prices only. They may be submitted from, for the first contract year, 30 days after award to sixty days prior to the end of that year and, for each subsequent contract year, from 30 days after the anniversary date of the contract award to 60 days prior to the end of each contract year. The Contractor shall propose a contract unit price taking into consideration the benchmarks in paragraph (g)(2). The request shall include a copy of the revised catalog/price list, the “E-CAT file” and the following for each item with a proposed increase in contract unit price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The supplier(catalog); e.g., ABC Dental, Inc.

(C) The product name/nomenclature; e.g., high speed handpiece.

(D) The part number; e.g., HIH2000.

(E) For the initial year, the list price that determined the award unit price, the applicable contract discount, and the award unit price. For all subsequent contract years, the list price that determined the highest contract unit price that was in effect at any time during the preceding contract year, the applicable discount, and the highest contract unit price that was in effect during the preceding contract year.

(F) The increased list price and its effective date, the applicable contract discount or larger contract discount now offered, and the proposed higher contract unit price.

(G) For the initial year, the percentage change from the list price that determined the award unit price to the new higher list price. For all subsequent contract years, the percentage change from the list price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher list price.

(H) For the initial year, the percentage change from the award unit price to the new higher proposed contract unit price. for all subsequent contract years, the percentage change from the highest contract unit price that was in effect at any time during the preceding contract year to the new higher proposed contract unit price.

(I) For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS unit price(s) for the same item.

(J) Any other information required by the Contracting Officer.

(2) Benchmarks. If any list price increases, and the increase is authorized under this clause, the Contract unit prices for any corresponding items ordered after the increase takes effect in the E-CAT system shall be determined using the increased list price and either the applicable discount originally awarded or any larger discount now offered that applies to the affected item. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lowest of the following three benchmarks:

(i) For the initial year of the contract, the proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the list price that determined the award unit price to the new higher list price. For all subsequent contract years, the proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the list price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher list price.

(ii) Any proposed higher contract unit price shall not exceed the current FSS unit price for the same item.

(iii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial contract year, contract unit price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher contract unit price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent contract years, contract unit price increases shall be limited to the following annual ceiling(s) applied to the highest contract unit price in effect during the preceding contract year for the same item (i.e., any proposed higher contract unit price cannot exceed the highest contract unit price in effect during the preceding contract year plus the annual ceiling.)

Annual ceiling, all items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. Upward price adjustments shall be effective once they appear in the contract electronic catalog residing in the E-CAT system. These updates will take place within 60 days after receipt of the Contractor’s request for upward price adjustment (or at the same time the increased list price takes effect, whichever is later) unless the Contracting Officer is unable to determine during that period that a price increase on any item or items is fair and reasonable (i.e., the proposed contract unit price exceeds the lowest of the three benchmarks above).

(i) In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable. If necessary, the Contracting Officer shall conduct discussions with the Contractor to negotiate a price reduction which results in a contract unit price that does not exceed the lowest of the three benchmarks. When discussions have concluded and an agreement which results in fair and reasonable prices is reached, the Contractor shall confirm the agreed-to price(s) in writing and forward an E-CAT file which includes the agreed-to price(s). (The agreement shall also identify the list price and discount which makes up each agreed-to price.) Once the written agreement is received, the Government shall modify the contract electronic catalog residing in the E-CAT system to include the increased contract unit prices.

(ii) If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will delete these items from the catalog in the E-CAT System. (This procedure applies to only those items whose prices the Contracting Officer is unable to determine fair and reasonable within the 60-day period the Government has to evaluate prices and update the E-CAT System. The remainder of the items whose price increases are determined fair and reasonable, shall be entered into the E-CAT system within the prescribed period.) In addition, the Contracting Officer may also, at any time, remove any item from the catalog in the E-CAT System that the Contracting Officer believes is no longer reasonably priced (if the Contracting Officer and the Contractor are unable to agree upon a reduced price) and notify customers accordingly.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (h)(2)(iii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in contract unit price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower contract unit price, or delete the item(s) from the contract electronic catalog residing in the E-CAT system. In no case may the increase in Contract Unit Price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a contract unit price that exceeds the other benchmarks.

(5) Any increased list prices shall not be used to compute contract unit prices for delivery orders issued before the date the adjusted contract unit prices take effect under the contract (i.e., the date they appear in the contract electronic catalog residing in the E-CAT system).

(6) If the Contracting Officer removes items from the E-CAT system for price unreasonableness (see (g)(4) and (h)(3)and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the contract unit price in effect at the time of the order.

(i) If the Contracting Officer at any time has any reason to believe that the established list price has been discontinued, the basis for the list price has been substantially altered, or that the item no longer meets the criteria to qualify as an established catalog priced item, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that any of the preceding conditions are present and a substitute for determining price adjustments is needed, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this clause. The Contract shall be modified to incorporate the substitute and its effective date.

(j) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(k) Pending approval of any proposed price changes and revision of the contract unit prices in the contract electronic catalog residing in the E-CAT System, payment shall be made at the contract unit prices in effect at the time of order.

(l) Voluntary price reductions (VPR):

(1) A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, which items are items included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the contract unit price(s) in effect at that time.

(2) If a list price (or FSS Unit Price) decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a contract unit price increase based upon an increased list price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause as if no VPR had been in effect.

(End of Clause)

52.216-9041 Economic Price Adjustment – Federal Supply Schedule Prices – Open Season E-CAT Solicitation.

As prescribed in 16.203-4(a)(2)(91)(i), 16.203-4(a)(2)(94)(ii), and 16.203-4(a)(2)(95)(iii), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – FEDERAL SUPPLY SCHEDULE PRICES - OPEN SEASON E-CAT SOLICITATION (MAR 2016)

(a) This clause applies to any items under this contract where the offeror has proposed the same (or discounted) prices as their current Federal Supply Schedule (FSS) prices and the Contracting Officer has accepted this pricing methodology. During the life of this contract, the Contracting Officer and the Contractor may agree in writing to also apply this clause to any other items that previously were not, but subsequently become, available under both this contract and any concurrent FSS contract(s).

(b) Definitions:

(1) FSS Price(s): “FSS Prices” or “FSS Unit Prices” refer to the unit prices for specific commercial items the Contractor and the Department of Veterans Affairs (DVA) have agreed to and are included in one or more current Federal Supply Schedule Contracts. All references to “FSS prices” or “FSS unit prices” shall be the prices appearing on the current Federal Supply Schedule for the same items under this contract.

(2) Discount: The percentage reduction off the FSS unit price proposed by the Contractor, accepted by the Government, and maintained in the contract file (not the E-CAT System) by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. (Contractors may offer larger discounts and/or reduced contract unit prices at any time.)

(3) Contract unit price: The price per unit of issue comprised of the FSS unit price and the applicable “discount”. The contract unit price is determined by reducing the FSS unit price by the appropriate discount. Proposed revised prices are loaded by the Contractor into an E-CAT file and are forwarded electronically to the Government. The Contactor shall also separately submit (in Excel spreadsheet or ACCESS database format) the additional information as required in paragraphs (e) and (f) below in order for the Government to review and evaluate these proposed price changes. Upon the Government’s determination that the offered prices are acceptable/fair and reasonable, the Government shall release them into the contract electronic catalog residing in the E-CAT System. (Contract unit prices, FSS unit prices and discounts under this contract are not visible in the E-CAT System to the Contractor or any customer. The prices visible in the E-CAT System to the Contractor or any customer are the delivered unit prices, which are the contract unit prices plus the DLA Troop Support administrative fee percentage (in effect at that time) charged customers ordering under this contract.)

(4) Voluntary price reduction (VPR): See paragraph (k).

(c) The offeror/Contractor warrants that (1) the FSS unit prices and the subsequent revisions thereto are the FSS unit prices in effect at time of award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these FSS unit prices do not include allowances for any portion of the contingency covered by this clause.

(d) Prior to award, the Contractor must furnish a copy of their current FSSs, FSS unit prices and the FSS contract expiration date for each item. The Contractor shall also furnish its offered discounts and proposed contract unit prices. at the option of the Contracting Officer, the Contractor shall also furnish the documentation set forth in paragraphs (f)(1)(i)(I) and (f)(1)(ii) below. Upon acceptance by the Government, the award unit prices shall be established at the FSS unit prices minus the offered discounts.

(e) Downward adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in FSS unit prices. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in FSS unit price. The Contractor shall propose a lower contract unit price taking into consideration the benchmark in paragraph (e)(2) below. The Contractor must furnish a copy of the revised FSS contract and FSS unit prices as soon as they are available. Also, the Contractor must provide a copy of the “E-CAT file” at least 30 days, unless otherwise specified in the contract, prior to the date when the reduced FSS unit price takes effect. Finally, the Contractor shall also furnish, within the timeframe above, a separate Excel spreadsheet or ACCESS database (in both hard copy and disc) that displays for each item with an offered decrease in contract unit price the following information:

(i) The item number; e.g., 0003.

(ii) The supplier; for example, ABC Dental, Incorporated.

(iii) The product name/nomenclature; e.g., high speed handpiece.

(iv) The part number; for example, HPH2000.

(v) The applicable contract discount used as a basis for determining the current contract unit price.

(vi) The FSS unit price upon which the current contract unit price is based.

(vii) The contract unit price currently in effect.

(viii) The applicable contract discount or larger contract discount now offered.

(ix) The reduced FSS unit price.

(x) The reduced contract unit price now offered.

(xi) The percentage decrease in FSS unit price from the FSS unit price that determined the current contract unit price to the new, lower FSS unit price.

(xii) The percentage decrease in contract unit price from the current contract unit price to the new lower contract unit price now offered.

(2) Benchmark for FSS price reductions.

The appropriate contract discount or larger discount now offered will be applied to each reduced FSS unit price to determine the adjusted contract unit price provided the adjusted contract unit price does not exceed the following benchmark:

The offered reduction in contract unit price on a percentage basis must be at least equal to the percentage reduction from the FSS unit price that determined the current contract unit price to the new lower FSS unit price, i.e., the current contract unit price must, as a minimum, be reduced by the percentage decrease in the FSS unit price.

(3) If the proposed contract unit price exceeds the benchmark above, the Contracting Officer shall determine the proposed price reductions unreasonable. The Contracting Officer and Contractor shall negotiate a reduction in the proposed contract unit price to an amount that does not exceed the benchmark above. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the FSS prices and discount(s) which make up these prices.)

(i) If an agreement cannot be reached, the Contracting Officer has the option of removing these items from the E-CAT system or taking the action in the last sentence below. If the proposed contract unit price does not exceed the benchmark above, it will be determined fair and reasonable.

(ii) Upon acceptance of any proposed price decreases, the Government shall modify the contract electronic catalog residing in the E-CAT system to include the reduced prices. These reduced contract unit prices shall apply to those items ordered on or after the date when these lower prices appear in the contract electronic catalog residing in the E-CAT system. (Revisions will not be added to the electronic catalog prior to date they take effect.)

(iii) If the Contractor fails to notify the Contracting Officer of any FSS unit price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the date the new FSS unit price takes effect.

(f) Upward adjustments.

(1) Upward adjustments may be requested at any time. The requested upward price adjustments must be based upon increases in the Contractor’s FSS unit prices. The request shall include a copy of the revised FSS unit prices, the “E-CAT file”, and the following for each item with a proposed increase in contract unit price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The supplier; e.g., ABC Dental, Inc.

(C) The product name/nomenclature; e.g., high speed handpiece.

(D) The part number; e.g., HPH2000.

(E) For the initial year, the FSS unit price that determined the award unit price, the applicable contract discount, and the award unit price. For all subsequent contract years, the FSS unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year, the applicable discount, and the highest contract unit price that was in effect during the preceding contract year.

(F) The increased FSS unit price, the applicable contract discount or larger contract discount now offered, and the proposed higher contract unit price.

(G) For the initial year, the percentage change from the FSS unit price that determined the award unit price to the new higher FSS unit price. For all subsequent contract years, the percentage change from the FSS unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher FSS unit price.

(H) For the initial year, the percentage change from the award unit price to the new higher proposed contract unit price. For all subsequent contract years, the percentage change from the highest contract unit price that was in effect at any time during the preceding contract year to the new higher proposed contract unit price.

(I) For any items offered to the Department of Veterans Affairs and the General Services Administration at other than Federal Supply Schedule (FSS) prices, the non-FSS prices/discounts (if different than the reported FSS unit prices/discounts) offered to those agencies.

(ii) Any other applicable supporting data requested by the Contracting Officer.

(2) Benchmarks for FSS price increases: If any FSS unit price increases, and the increase is authorized under this clause, the contract unit prices for any corresponding items shall be determined using the increased FSS unit price(s) and either the applicable discount(s) originally awarded or any larger discount(s) now offered. These increased contract unit prices shall apply to all orders issued on or after the date these revised unit prices appear in the electronic catalog residing in the E-CAT system. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lower of the following two benchmarks:

(i) For the initial year of the contract, any proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the FSS unit price that determined the award unit price to the new higher FSS unit price. For all subsequent contract years, any proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the FSS unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher FSS unit price.

(ii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial contract year, contract unit price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher contract unit price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent contract years, contract unit price increases shall be limited to the following annual ceiling(s) applied to the highest contract unit price in effect during the preceding contract year for the same item (i.e., any proposed higher contract unit price cannot exceed the highest contract unit price in effect during the preceding contract year plus the annual ceiling.)

Annual ceiling, all items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. Upward price adjustments shall be effective once they appear in the contract electronic catalog residing in the E-CAT system.

(i) These updates will take place within 60 days after receipt of the Contractor’s request for upward price adjustment (or at the same time the increased FSS price takes effect, whichever is later) unless the Contracting Officer is unable to determine during that period that a price increase on any item or items is fair and reasonable (i.e., the proposed contract unit price exceeds the lower of the two benchmarks above). In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable.

(ii) If necessary, the Contracting Officer shall conduct discussions with the Contractor to reduce the proposed contract unit price to an amount which does not exceed the lower of the two benchmarks and reach an agreement on fair and reasonable prices.

(iii) When discussions have concluded, the Contractor shall confirm the agreed-to price(s) in writing and forward an E-CAT file which includes the agreed-to price(s). (The agreement shall also identify the FSS price and discount which makes up each agreed-to price.) Once the written agreement is received, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will delete these items from the catalog in the E-CAT System.

(iv) This procedure applies to only those items whose prices the Contracting Officer is unable to determine fair and reasonable within the 60-day period the Government has to evaluate prices and update the E-CAT System. The remainder of the items whose price increases are determined fair and reasonable, shall be entered into the E-CAT system within the prescribed period.

(v) In addition, the Contracting Officer may also, at any time, remove any item from the catalog in the E-CAT System that the Contracting Officer believes is no longer reasonably priced (if the Contracting Officer and the Contractor are unable to agree upon a reduced price) and notify customers accordingly.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (f)(2)(ii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in contract unit price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower contract unit price, or delete the item from the contract electronic catalog residing in the E-CAT system. In no case may the increase in contract unit price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a contract unit price that exceeds the other benchmark.

(5) Any increased FSS unit prices shall not be used to compute contract unit prices for delivery orders issued before the date the adjusted contract unit prices take effect under the contract (i.e., the date they appear in the contract electronic catalog residing in the E-CAT system).

(g) If the Contracting Officer removes items from the E-CAT system for price unreasonableness (see (e)(3), (f)(3) and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the Contract Unit Price in effect at the time of the order.

(h) If the Contracting Officer at any time has any reason to believe that the FSS unit price has been discontinued, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that the FSS unit price has been discontinued, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this or some other appropriate EPA clause. The Contract shall be modified to incorporate the substitute and its effective date.

(i) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for economic price adjustment.

(j) Pending approval of any proposed price changes and revision of the contract unit prices in the contract electronic catalog residing in the E-CAT System, payment shall be made at the contract unit prices in effect at the time of order.

(k) Voluntary price reductions (VPR):

(1) A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, the applicable items included, and the length of time the VPR will remain in effect. Once the special or discount period expires, prices will revert to the contract unit prices in effect at that time.

(2) If an FSS unit price decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a contract unit price increase based upon an increased FSS unit price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause if no VPR had been in effect.

(End of Clause)

52.216-9042 Economic Price Adjustment (EPA) – Department of Labor Bureau of Labor Statistics – Consumer Price Index.

As prescribed in 16.203-4(d)(2)(90), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) - DEPARTMENT OF LABOR BUREAU OF LABOR STATISTICS - CONSUMER PRICE INDEX(CPI) (NOV 2011)

(a) The Contractor warrants that the contract unit prices do not include allowances for any portion of the contingency covered by this clause.

(b) Consumer Price Indexes (CPIs) are published by the United States (U.S.) Department of Labor, Bureau of Labor Statistics. The CPI for the expenditure category “Prescription Drugs and Medical Supplies” or “Nonprescription Drugs and Medical Supplies” located in Table 3 under “Medical Care Commodities” will be the economic indicator used for calculating the proposed new unit price for any option period to be exercised by the Government. The CPI, as used in this clause, means the index, as published monthly, not seasonally adjusted, for all urban consumers (CPI-U), U.S. city average. The index for a given month is available approximately two weeks into the following month. The item(s) offered are:

Prescription ( ) Nonprescription ( ) (Offeror must check appropriate block)

(c) All references to the terms “federal supply schedule (FSS) unit price(s)" or “FSS Price(s)” used herein, means the prices appearing in the Contractor’s current federal supply schedule for the same items under this contract.

(d) Price adjustments based upon CPI changes.

(1) Price adjustments (increases and decreases) based upon changes in the CPI indexes are authorized once for each option period provided the Government elects to exercise that option. Price increases must be requested by the Contractor. Any request for a price increase must be submitted to the Contracting Officer at least thirty days prior to the expiration of the current contract period in order for a price increase to take effect at the same time the upcoming option period takes effect (all indexes used to calculate the base and adjusting indexes should be available by this time). The request must include the calculations used to compute the proposed new unit price and a comparison of the appropriate benchmarks to the proposed new unit price. Price decreases are mandated by this clause. The Contractor shall notify the Contracting Officer of any price decreases in accordance with the same timeframe and provide the same information as required for increases above.

(2) Price Increases: If a request is not submitted within the required timeframe, increases will not take effect until 30 days after the request is received. If no request is received within 60 days after the New Option Period takes effect, the Contractor waives its right to a price increase for that Option Period. Price Decreases: If the Contractor fails to report any price decrease, the Contracting Officer will unilaterally establish a New Option Period Unit Price based upon the parameters for adjustment under this clause.

(e) Additional Price Adjustment(s). The Contractor is required to notify the Contracting Officer whenever there is a reduction in the Contractor’s FSS unit price and/or the Federal ceiling price (FCP) at least 30 days prior to its taking effect for the same item(s) as under this contract when that reduction results in an FSS price and/or FCP that is now lower than the current contract unit price. This notification will trigger a price reduction in the current contract unit price to an amount equal to the lower FSS unit price and/or FCP. (For covered drugs where both the FSS and FCP have been reduced, the contract unit price shall be reduced to the lower of the two.)

(f) Calculation of the unit price (U/P) for the option periods based upon changes in the CPI.

(1) A "Base" and "Adjusting" index shall be established for each option period. (See paragraph (g) below).

(2) The unit price for the contract period about to expire will be increased or decreased based upon the percentage change from the base index to the applicable adjusting index using the formulas below.

First option period:

Proposed new U/P for = Adjusting Index x Current Contract U/P for the

First option period Base Index expiring Base Period

Subsequent option periods:

Proposed new U/P for = Adjusting Index x Current Contract U/P for the

Upcoming Option Period Base Index expiring Option Period

(3) The proposed new unit price will be used to price the upcoming option period provided it does not exceed the lowest of the applicable benchmarks. If it does exceed the lowest of the applicable benchmarks, however, the Contractor shall agree on a price reduction to an amount which is equal to or lower than the lowest of the applicable benchmarks. This reduced unit price will then be used to price the upcoming option period.

(g) Determining the "base" and "adjusting" indexes for price changes based upon the CPI. A base and adjusting index shall be established for each option period.

(1) For the first option period, the base index shall be the arithmetic average of the CPI indexes published for the month before and the actual month the award is made. The Adjusting Index shall be the arithmetic average of the CPI indexes published for the third and fourth month prior to the month the Base Period expires (e.g., if the Base Period expires in June, the Adjusting Index would be the average of the indexes published for February and March of the Base Period.)

(2) For subsequent option periods, the base index for any upcoming option period shall be the previously established adjusting index (e.g., the base index for the upcoming second option period shall be the adjusting index established for the first option period.) The adjusting index for any upcoming option period shall be the arithmetic average of the CPI Indexes published for the third and fourth months prior to the month the current option period expires (e.g., if the first option period expires in June, the adjusting index for the upcoming second option period would be the average of the indexes published for February and March of the first option period).

(h) Benchmarks for price changes based upon the CPI:

(1) Any proposed new unit price calculated as a result of using the formula in (f) above shall not exceed whichever is the lowest of the following applicable benchmarks:

(i) The maximum ceiling unit price calculated by escalating the expiring contract period unit price by 10% (e.g., the ceiling for the first option period unit price will be based on the base period unit price escalated by 10%; the ceiling for the third option period unit price will be based on the second option period unit price escalated by 10%.) (Applies to price increases only. There is no percentage limit on downward adjustments under this clause.);

(ii) The Contractor’s current federal supply schedule price for the same item (applies to all adjustments where the Contractor has a concurrent FSS for the same item(s) as under this contract); and

(iii) The current Federal ceiling price for the same item (applies to covered drugs only).

(i) All price increases or decreases (including any decreases under paragraph (e) above) under this clause shall be effected through the issuance of a modification. The modification shall indicate the new unit price and the effective date of that price, which, in most cases, should be on the same date the option period takes effect. All delivery orders issued after the effective date shall be priced using the new unit price. The modification shall also include the Adjusting Index.

(j) Payment on each delivery order under this contract shall be at the contract unit price in effect at the time the order is issued.

(k) In the event publication of any CPI index used under this clause is discontinued or its method of calculation is altered substantially in that it fails to reflect market conditions, the Contracting Officer may modify the contract to specify use of an appropriate substitute index or alternate method for adjusting prices. The substitute index or alternate adjustment method will take effect on the date the original index begins to fail to reflect market conditions.

(l) Any pricing actions pursuant to paragraph (c) entitled "Changes" of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provisions of the contract shall be priced as though there were no provisions for economic price adjustment.

(m) Voluntary price reductions (VPR):

(1) A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, the applicable items included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the contract unit prices that would be in effect at that time.

(2) If any VPR is in effect when a price decrease is mandated under this clause, the VPR will remain in effect until it expires if it is lower than the price decrease. If the Contractor requests a price increase based upon an increase in the CPI indexes when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause as if no VPR had been in effect.

(End of Clause)

52.216-9043 Economic Price Adjustment – Federal Supply Schedule Prices.

As prescribed in 16.203-4(a)(2)(92), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – FEDERAL SUPPLY SCHEDULE PRICES (FSS) (NOV 2011)

(a) This clause applies to any items under this contract where the offeror has proposed the same (or discounted) prices as their current FSS prices and the Contracting Officer has accepted this pricing methodology. During the life of this contract, the Contracting Officer and the Contractor may agree in writing to also apply this clause to any other items that previously were not, but subsequently become, available under both this contract and any concurrent FSS contract(s).

(b) Definitions:

(1) FSS Price(s): “FSS prices” or “FSS unit prices” refer to the unit prices for specific commercial items the Contractor and the Department of Veterans Affairs (DVA) have agreed to and are included in one or more current Federal Supply Schedule Contracts. All references to “FSS prices” or “FSS unit prices” shall be the prices appearing on the current Federal supply schedule for the same items under this contract.

(2) Discount: The percentage reduction off the FSS unit price proposed by the Contractor and accepted by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. (Contractors may offer larger discounts and/or reduced contract unit prices at any time.)

(3) Contract unit price: The price per unit of issue comprised of the FSS unit price and the applicable “discount”. The contract unit price is determined by reducing the FSS unit price by the appropriate discount.

(4) Voluntary price reduction (VPR): See paragraph (k).

(c) The offeror/Contractor warrants that (1) the FSS unit prices and the subsequent revisions thereto are the FSS unit prices in effect at time of award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these FSS unit prices do not include allowances for any portion of the contingency covered by this clause.

(d) Prior to award, the Contractor must furnish a copy of their current FSSs, FSS unit prices and the FSS contract expiration date for each item. The Contractor shall also furnish its offered discounts and proposed contract unit prices. At the option of the Contracting Officer, the Contractor shall also furnish the documentation set forth in paragraphs (f)(1)(i)(I) and (f)(1)(ii) below. Upon acceptance by the Government, the award unit prices shall be established at the FSS unit prices minus the offered discounts.

(e) Downward adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in FSS unit prices. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in FSS Unit Price. The Contractor shall propose a lower contract unit price taking into consideration the benchmark in paragraph (e)(2) below. The Contractor must furnish a copy of the revised FSS contract and FSS unit prices as soon as they are available. Also, at least 30 days prior to the date when the reduced FSS unit price takes effect, the Contractor shall furnish an Excel spreadsheet or ACCESS database (in both hard copy and disc) that displays for each item with an offered decrease in contract unit price the following information:

(i) The item number; e.g., 0003.

(ii) The supplier; e.g., ABC Dental, Inc.

(iii) The product name/nomenclature; e.g., high speed handpiece.

(iv) The part number; e.g., HPH2000.

(v) The applicable contract discount used as a basis for determining the current contract unit price.

(vi) The FSS unit price upon which the current contract unit price is based.

(vii) The contract unit price currently in effect.

(viii) The applicable contract discount or larger contract discount now offered.

(ix) The reduced FSS unit price.

(x) The reduced contract unit price now offered.

(xi) The percentage decrease in FSS unit price from the FSS unit price that determined the current contract unit price to the new, lower FSS unit price.

(xii) The percentage decrease in contract unit price from the current contract unit price to the new lower contract unit price now offered.

(2) Benchmark for FSS price reductions. The appropriate contract discount or larger discount now offered will be applied to each reduced FSS Unit Price to determine the adjusted contract unit price provided the adjusted Contract Unit Price does not exceed the following benchmark:

The offered reduction in contract unit price on a percentage basis must be at least equal to the percentage reduction from the FSS unit price that determined the current contract unit price to the new lower FSS Unit Price, i.e., the current contract unit price must, as a minimum, be reduced by the percentage decrease in the FSS Unit Price.

(3) If the proposed contract unit price exceeds the benchmark above, the Contracting Officer shall determine the proposed price reductions unreasonable. The Contracting Officer and Contractor shall negotiate a reduction in the proposed contract unit price to an amount that does not exceed the benchmark above. All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the FSS prices and discount(s) which make up these prices. The Contract will be modified as discussed directly below.)

(i) If the proposed contract unit price does not exceed the benchmark above, it will be determined fair and reasonable.

(ii) Upon acceptance of any proposed price decreases, the Government shall modify the contract to include the reduced contract unit price(s) which will take effect on the same day the reduced FSS Unit Price takes effect. The modification will also show the applicable discount, the reduced FSS Unit Price(s) and their effective date(s).

(iii) The reduced contract unit prices shall apply to those items ordered on or after the effective date of the decrease in the Contractor’s FSS Price(s).

(iv) f the Contractor fails to notify the Contracting Officer of any FSS Unit Price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the date the new FSS Unit Price takes effect.

(f) Upward adjustments.

(1) Upward adjustments may be requested at any time. The requested upward price adjustments must be based upon increases in the Contractor’s FSS Unit Prices. The request shall include a copy of the revised FSS Unit Prices, and the following for each item with a proposed increase in contract unit price:

(i) An Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The supplier; e.g., ABC Dental, Inc.

(C) The product name/nomenclature; e.g., high speed handpiece.

(D) The part number; e.g., HPH2000.

(E) For the initial year, the FSS unit price that determined the award unit price, the applicable contract discount, and the award unit price. For all subsequent contract years, the FSS unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year, the applicable discount, and the highest contract unit price that was in effect during the preceding contract year.

(F) The increased FSS unit price, the applicable contract discount or larger contract discount now offered, and the proposed higher contract unit price.

(G) For the initial year, the percentage change from the FSS unit price that determined the award unit price to the new higher FSS unit price. For all subsequent contract years, the percentage change from the FSS unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher FSS unit price.

(H) For the initial year, the percentage change from the award unit price to the new higher proposed contract unit price. For all subsequent contract years, the percentage change from the highest contract unit price that was in effect at any time during the preceding contract year to the new higher proposed contract unit price.

(I) For any items offered to the Department of Veterans Affairs and the General Services Administration at other than Federal Supply Schedule (FSS) prices, the non-FSS prices/discounts (if different than the reported FSS unit prices/discounts) offered to those agencies.

(ii) Any other applicable supporting data requested by the Contracting Officer.

(2) Benchmarks for FSS price increases: If any FSS unit price increases, and the increase is authorized under this clause, the contract unit prices for any corresponding items shall be determined using the increased FSS unit price(s) and either the applicable discount(s) originally awarded or any larger discount(s) now offered. hese increased contract unit prices shall apply to all orders issued on or after the effective date of these increases (see (f)(3) below). Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lower of the following two benchmarks:

(i) For the initial year of the contract, any proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the FSS unit price that determined the award unit price to the new higher FSS unit price. For all subsequent contract years, any proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the FSS unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher FSS unit price.

(ii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial contract year, contract unit price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher contract unit price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent contract years, contract unit price increases shall be limited to the following annual ceiling(s) applied to the highest contract unit price in effect during the preceding contract year for the same item (i.e., any proposed higher contract unit price cannot exceed the highest contract unit price in effect during the preceding contract year plus the annual ceiling.)

Annual ceiling, all items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon acceptance of any proposed price increases, the Government shall modify the contract showing the increased contract unit prices and when they become effective, the applicable discount, and the increased FSS unit price(s) and their effective date(s). Upward price adjustments shall be effective within 60 days after receipt of the Contractor’s request for upward price adjustment (or at the same time the increased FSS price takes effect, whichever is later) unless the Contracting Officer is unable to determine during that period that a price increase on any item or items is fair and reasonable (i.e., the proposed contract unit price exceeds the lower of the two benchmarks above). in this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable.

If necessary, the Contracting Officer shall conduct discussions with the Contractor to reduce the proposed contract unit price to an amount which does not exceed the lower of the two benchmarks and reach an agreement on fair and reasonable prices. When discussions have concluded, the Contractor shall confirm the agreed-to price(s) in writing. (The agreement shall also identify the FSS price and discount which makes up each agreed-to price.)

Once the written agreement is received, the Government shall modify the contract showing the increased contract unit prices and when they become effective, the applicable discount, and the increased FSS Unit Price(s) and their effective date(s). (No increases will be effective prior to the date the increased FSS takes effect.)

If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will remove these items from the contract.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (f)(2)(ii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in Contract Unit Price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower Contract Unit Price, or delete the item from the contract. In no case may the increase in Contract Unit Price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a Contract Unit Price that exceeds the other benchmark.

(5) Any increased FSS unit prices shall not be used to compute contract unit prices for delivery orders issued before the date the adjusted contract unit prices take effect under the Contract.

(g) If the Contracting Officer removes items from the contract for price unreasonableness (see (e)(3), (f)(3) and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the Contract Unit Price in effect at the time of the order.

(h) If the Contracting Officer at any time has any reason to believe that the FSS unit price has been discontinued, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that the FSS Unit Price has been discontinued, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this or some other appropriate EPA clause. The contract shall be modified to incorporate the substitute and its effective date.

(i) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(j) Pending approval of any proposed price changes and the issuance of any subsequent modification establishing the effective date of these changes, payment shall be made at the contract unit prices in effect at the time of order.

(k) Voluntary price reductions (VPR): A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time.

The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, the applicable items included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the contract unit prices in effect at that time.

If an FSS unit price decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a contract unit price increase based upon an increased FSS unit price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause if no VPR had been in effect.

(End of Clause)

52.216-9044 Economic Price Adjustment – Established Catalog Price Multiple Adjustments Authorized Per Clause Terms.

As prescribed in 16.203-4(a)(2)(93), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – ESTABLISHED CATALOG PRICE - MULTIPLE ADJUSTMENTS AUTHORIZED PER CLAUSE TERMS - NON-ECAT (NOV 2011)

(a) All price adjustments authorized or mandated by this clause are based upon changes in the Contractor’s list prices and certain Federal Supply Schedule (FSS) unit prices. The clause also provides for voluntary price reductions (VPR) in the form of “specials” or “discounts”.

(b) Definitions:

(1) Contract unit price: The price per unit of issue comprised of the “list price” and the applicable “discount”. The contract unit price is determined by reducing the applicable list price by the appropriate discount. The list prices and discounts shall be listed in the contract. The resulting net contract unit prices may or may not be listed in the contract at the discretion of the Contracting Officer.

(2) Discount: The percentage reduction off the list price proposed by the Contractor and accepted by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. These discounts are in addition to any standard trade discounts in the Contractor’s established commercial catalog/price list. (Contractors may offer larger discounts and/or reduced list prices at any time.)

(3) List price: The established catalog unit prices of the items. In order for a “list price” to meet the criteria as an established catalog price, it must meet the definition in (c)(1) below.

(4) Voluntary price reduction (VPR): See paragraph (l) below.

(c) Established catalog unit price.

(1) The term "established catalog unit price", as used in this clause, means a unit price that (i) is a catalog price for a commercial item sold in substantial quantities to the general public and (ii) is the net price after applying any standard trade discounts offered by the Contractor.

(2) Unless otherwise specified, all reference to the terms “FSS unit price”(s) or “FSS price(s)” as used in this clause, shall be the prices appearing in the Contractor’s current Federal Supply Schedule for the same items under this contract.

(d) The offeror/Contractor warrants that (1) the list prices and the subsequent revisions thereto are the established catalog unit prices in effect at time of award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these list prices do not include allowances for any portion of the contingency covered by this clause. The offeror/Contractor also warrants that any contract unit prices determined using FSS unit prices do not include allowances for any portion of the contingency covered by this clause.

(e) Prior to award the Contractor must furnish:

(1) their current established catalog/price list, offered discounts, proposed contract unit prices; and

(2) a copy of their current FSS’s, FSS unit prices, and the FSS contract expiration dates applicable to any items offered as well as any other information required by the Contracting Officer.

(f) Upon acceptance by the Government, the award unit prices will be established at the list prices minus the offered discounts provided the resulting contract unit prices do not exceed any current FSS unit price for the same item. Accordingly, offers are cautioned to propose discounts which, when applied to the list prices, will not exceed FSS Unit Prices.

(g) Downward adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in either 1) List Prices or 2) FSS Unit Prices when the reduction results in a revised FSS Price which is now lower than the current Contract Unit Price. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in list price and any FSS Unit Price reduction which results in an FSS Unit Price which is now lower than the current Contract Unit Price.

If the offered price decrease is based upon a reduction in list price or FSS Price, the Contractor shall propose a lower Contract Unit Price taking into consideration the benchmarks in paragraphs (g)(2) and (3) below. The Contractor must furnish a copy of the revised Catalog/Price List or FSS Unit Price as soon as it is available. Also, the Contractor must provide an Excel spreadsheet or ACCESS Database (in both hard copy and disc) that displays for each item with an offered decrease in Contract Unit Price the appropriate information below.

For reductions in List Price(s), the Contractor shall submit this information at least 60 days prior to the date when the reduced List Prices take effect. For reductions in FSS Price(s), the Contractor shall provide this information at least 30 days prior to the date the reduced FSS unit price(s) takes effect.

(i) For list price or FSS changes: The item number; e.g., 0001AA.

(ii) For list price or FSS changes: The Supplier (Catalog); e.g., ABC Imaging, Inc.

(iii) For list price or FSS changes: The Product Name/Nomenclature; e.g., High Speed Handpiece.

(iv) For list price or FSS changes: Part Number; e.g., HIH 2000

(v) or list price or FSS changes: The list price upon which the current Contract Unit Price is based.

(vi) For list price or FSS changes: The applicable Contract Discount used as a basis for determining the current Contract Unit Price.

(vii) For list price or FSS changes: The Contract Unit Price currently in effect.

(viii) For list price changes: The reduced List Price.

(ix) For list price changes: The applicable Contract Discount or larger Contract Discount now offered.

(x) For list price or FSS changes: The reduced contract unit price now offered.

(xi) For list price changes: The percentage decrease in list price from the list price which determined the current Contract Unit Price to the new, lower List Price.

(xii) For list price changes: The percentage change in Contract Unit Price from the current Contract Unit Price to the new lower Contract Unit Price now offered.

(xiii) For FSS changes: The current FSS Unit Price which is about to expire and the new reduced FSS Unit Price which will replace it and triggered this Contract Unit Price reduction.

(xiv) For list price changes: For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS Unit Price(s) for the same item.

(2) Reductions in List Price(s). If the offered price decrease is based upon a reduction in the List Price, the appropriate discount or larger discount now offered will be applied to each reduced list price to determine the adjusted Contract Unit Price provided the proposed lower Contract Unit Price does not exceed the lower of the following two benchmarks:

(i) The offered reduction in Contract Unit Price on a percentage basis must be at least equal to the percentage reduction from the list price currently in effect under the contract to the new lower List Price; i.e., the current Contract Unit Price must, as a minimum, be reduced by the percentage decrease in List Price.

(ii) The new proposed lower Contract Unit Price shall not exceed the current FSS Unit Price for the same item.

(3) FSS Price Reductions. If the offered price decrease is based upon a reduction in the FSS Price, the proposed lower Contract Unit Price shall not exceed the following benchmark: The new proposed lower Contract Unit Price shall not exceed the revised lower FSS Price for the same item.

(4) If the proposed Contract Unit Price exceeds the lower of the appropriate list price benchmarks (for reductions based upon reduced List Prices) or the FSS Price benchmark (for reductions based upon reduced FSS Prices), the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the appropriate benchmarks.

(i) All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the list price(s) and discount(s) which make up these prices. Changes based upon FSS price reductions will be expressed in terms of the current list price and an appropriate discount which results in an adjusted Contract Unit Price which does not exceed the revised lower FSS Price.

(ii) If an agreement cannot be reached the Contracting Officer has the option of removing these items from the Contract or taking the action in the last sentence below. If the proposed Contract Unit Price does not exceed the lowest of the appropriate list price or FSS Price benchmarks, it will be determined fair and reasonable.

(iii) Upon acceptance of any proposed price decreases, the Government shall modify the contract to include the reduced list prices and discounts (changes based upon FSS price reductions will be expressed in terms of the current list price and an appropriate discount which results in an adjusted Contract Unit Price which does not exceed the revised lower FSS Price). The adjusted contract unit prices may or may not be shown in the modification at the discretion of the Contracting Officer. These reduced contract unit prices shall apply to those items ordered on or after the effective date of the reduced List or FSS Unit Price(s).

(iv) If the Contractor fails to notify the Contracting Officer of any list price or FSS Price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the effective date of the decrease in the Contractor’s established List or FSS Prices.

(h) Upward Adjustments.

(1) Upward adjustments may be requested at any time. However, any request for upward price adjustment must be based upon increases in List Prices only. The Contractor shall propose a Contract Unit Price taking into consideration the benchmarks in paragraph (g)(2). The request shall include a copy of the revised Catalog/Price List and the following for each item with a proposed increase in Contract Unit Price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The Supplier(Catalog); e.g., ABC Dental, Inc.

(C) The Product Name/Nomenclature; e.g., High Speed Handpiece.

(D) The Part Number; e.g., HIH2000.

(E) For the initial year, the list price that determined the Award Unit Price, the applicable Contract Discount, and the Award Unit Price. For all subsequent contract years, the list price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year, the applicable discount, and the highest Contract Unit Price that was in effect during the preceding Contract Year.

(F) The increased list price and its effective date, the applicable Contract Discount or larger Contract Discount now offered, and the proposed higher Contract Unit Price.

(G) For the initial year, the percentage change from the list price that determined the award unit price to the new higher List Price. For all subsequent contract years, the percentage change from the list price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year to the new higher List Price.

(H) For the initial year, the percentage change from the award unit price to the new higher proposed Contract Unit Price. For all subsequent contract years, the percentage change from the highest Contract Unit Price that was in effect at any time during the preceding contract year to the new higher proposed Contract Unit Price.

(I) For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS Unit Price(s) for the same item.

(J) Any other information required by the Contracting Officer.

(2) Benchmarks. If any list price increases, and the increase is authorized under this clause, the contract unit prices for any corresponding items ordered after the increase takes effect shall be determined using the increased list price and either the applicable Discount originally awarded or any larger Discount now offered that applies to the affected item. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lowest of the following three benchmarks:

(i) For the Initial Year of the contract, the proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the list price that determined the award unit price to the new higher List Price. For all subsequent Contract Years, the proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the list price that determined the highest Contract Unit Price that was in effect at any time during the preceding contract year to the new higher List Price.

(ii) Any proposed higher Contract Unit Price shall not exceed the current FSS Unit Price for the same item.

(iii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial Contract Year, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent Contract Years, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the highest Contract Unit Price in effect during the preceding Contract Year for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the highest Contract Unit Price in effect during the preceding Contract Year plus the annual ceiling.)

Annual Ceiling, All Items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract to include the increased list prices and discounts. The adjusted contract unit prices may or may not be included in the modification at the discretion of the Contracting Officer.

(i) Upward price adjustments shall be effective within 60 days after receipt of the Contractor’s request for upward price adjustment (or at the same time the increased list price takes effect, whichever is later) unless the Contracting Officer is unable to determine during that period that a price increase on any item or items is fair and reasonable (i.e., the proposed Contract Unit Price exceeds the lowest of the three benchmarks above). In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable. If necessary, the Contracting Officer shall conduct discussions with the Contractor to negotiate a price reduction which results in a Contract Unit Price that does not exceed the lowest of the three benchmarks.

(ii) When discussions have concluded and an agreement which results in fair and reasonable prices is reached, the Contractor shall confirm the agreed-to price(s) in writing (The agreement shall also identify the list price and discount which makes up each agreed-to price.) Once the written agreement is received, the Government shall modify the contract to include the increased list prices and discounts. The adjusted contract unit prices may or may not be included in the modification at the discretion of the Contracting Officer (No increases will be effective prior to the date the increased List Price(s) take effect.)

(iii) If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will delete these items from the contract. In addition, the Contracting Officer may also, at any time, remove any item from the contract that the Contracting Officer believes is no longer reasonably priced (if the Contracting Officer and the Contractor are unable to agree upon a reduced price) and notify customers accordingly.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (h)(2)(iii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in contract unit price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower contract unit price, or delete the item(s) from the contract. In no case may the increase in Contract Unit Price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a contract unit price that exceeds the other benchmarks.

(5) Any increased list prices shall not be used to compute contract unit prices for delivery orders issued before the date the adjusted contract unit prices take effect under the contract.

(6) If the Contracting Officer removes items from the contract for price unreasonableness (see (g)(4) and (h)(3) and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the Contract Unit Price in effect at the time of the order.

(i) If the Contracting Officer at any time has any reason to believe that the established list price has been discontinued, the basis for the list price has been substantially altered, or that the item no longer meets the criteria to qualify as an established Catalog Priced item, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that any of the preceding conditions are present and a substitute for determining price adjustments is needed, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this or another appropriate clause. The Contract shall be modified to incorporate the substitute and its effective date.

(j) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(k) Pending approval of any proposed price changes and the subsequent modification of the contract unit prices, payment shall be made at the contract unit prices in effect at the time of order.

(l) Voluntary Price Reductions (VPR): A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause.

(1) The Contractor shall notify the Contracting Officer when the VPR takes effect, which items are included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the Contract Unit Price(s) in effect at that time.

(2) If a list price (or FSS Unit Price) decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a Contract Unit Price increase based upon an increased list price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause as if no VPR had been in effect.

(End of Clause)

52.216-9045 Economic Price Adjustment – Other Federal Agency Contracts – E-CAT.

As prescribed in 16.203-4(a)(2)(94)(i), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – OTHER FEDERAL AGENCY CONTRACTS – E-CAT

(NOV 2011)

(a) This clause applies to any items under this contract where the offeror has proposed the same (or discounted) prices as are included in any current contract(s) the Contractor may have with Other Federal Agencies (OFA) and the Contracting Officer agrees to use this pricing methodology. During the life of this contract, the Contracting Officer and the Contractor may agree in writing to also apply this clause to any other items that previously were not, but subsequently become, available under both this contract and any concurrent OFA contract(s).

(b) Definitions:

(1) Other Federal Agency (OFA) Price: “OFA Prices” or “OFA Unit Prices” refer to the unit prices for specific commercial items the Contractor and another Federal Agency have agreed to and are included in one or more current Contracts.

(2) Discount: The percentage reduction off the OFA Unit Price proposed by the Contractor, accepted by the Government, and maintained in the contract file (not the E-CAT System) by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. (Contractors may offer larger discounts and/or reduced contract unit prices at any time.)

(3) Contract Unit Price: The price per unit of issue comprised of the OFA Unit Price and the applicable “Discount”. The Contract Unit Price is determined by reducing the OFA Unit Price by the appropriate Discount. contract unit prices and any subsequent proposed revisions thereto are loaded by the Contractor into an E-CAT file and are forwarded electronically to the Government. For proposed price changes, the Contactor shall also separately submit (in Excel Spreadsheet or ACCESS Database format) the additional information as required in paragraphs (e) and (f) below in order for the Government to review and evaluate these proposed price changes. Upon the Government’s determination that the offered prices are acceptable/fair and reasonable, the Government shall release them into the contract electronic catalog residing in the E-CAT System. (Contract unit prices, OFA unit prices and discounts under this contract are not visible in the E-CAT System to the Contractor or any customer. The prices visible in the E-CAT System to the Contractor or any customer are the Delivered Unit Prices, which are the contract unit prices plus the DLA Troop Support Administrative Fee percentage (in effect at that time) charged customers ordering under this contract.)

(4) Voluntary Price Reduction (VPR): See paragraph (k).

(c) The offeror/Contractor warrants that (1) the OFA Unit Prices and the subsequent revisions thereto are the OFA unit prices in effect at time of award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these OFA Unit Prices do not include allowances for any portion of the contingency covered by this clause.

(d) Prior to award, the Contractor must furnish a copy of their current OFA Contract, OFA contract unit prices and the OFA contract expiration date for each item. The Contractor shall also furnish its offered Discounts and proposed contract unit prices. At the option of the Contracting Officer, the Contractor shall also furnish the documentation set forth in paragraphs (f)(1)(i)(I) and (f)(1)(ii) below. Upon acceptance by the Government, the Award Unit Prices shall be established at the OFA Unit Prices minus the offered Discounts.

(e) Downward Adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in OFA Unit Prices. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in OFA Unit Price. The Contractor shall propose a lower Contract Unit Price taking into consideration the benchmark in paragraph (e)(2) below. The Contractor must furnish a copy of the revised OFA Contract and OFA Unit Prices as soon as they are available. Also, the Contractor must provide a copy of the “E-CAT file” at least 30 days prior to the date when the reduced OFA Unit Price takes effect. Finally, the Contractor shall also furnish, within the timeframe above, a separate Excel spreadsheet or ACCESS database (in both hard copy and disc) that displays for each item with an offered decrease in Contract Unit Price the following information:

(i) The item number; e.g., 0003.

(ii) The Supplier; e.g., ABC Dental, Inc.

(iii) The Product Name/Nomenclature; e.g., High Speed Handpiece.

(iv) The Part Number; e.g., HPH2000.

(v) The applicable contract discount used as a basis for determining the current Contract Unit Price.

(vi) The OFA Unit Price upon which the current Contract Unit Price is based.

(vii) The Contract Unit Price currently in effect.

(viii) The applicable Contract Discount or larger Contract Discount now offered.

(ix) The reduced OFA Unit Price.

(x) The reduced Contract Unit Price now offered.

(xi) The percentage decrease in OFA Unit Price from the OFA Unit Price that determined the Current Contract Unit Price to the new, lower OFA Unit Price.

(xii) The percentage decrease in Contract Unit Price from the current Contract Unit Price to the new lower Contract Unit Price now offered.

(2) Benchmark For OFA Price Reductions.

(i) The appropriate Contract Discount or larger Discount now offered will be applied to each reduced OFA Unit Price to determine the adjusted Contract Unit Price provided the adjusted Contract Unit Price does not exceed the following benchmark:

(ii) The offered reduction in Contract Unit Price on a percentage basis must be at least equal to the percentage reduction from the OFA Unit Price that determined the current Contract Unit Price to the new lower OFA Unit Price, i.e., the current Contract Unit Price must, as a minimum, be reduced by the percentage decrease in the OFA Unit Price.

(3) If the proposed Contract Unit Price exceeds the benchmark above, the Contracting Officer shall determine the proposed price reductions unreasonable. The Contracting Officer and Contractor shall negotiate a reduction in the proposed Contract Unit Price to an amount that does not exceed the benchmark above. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the OFA prices and discount(s) which make up these prices.)

(i) If an agreement cannot be reached, the Contracting Officer has the option of removing these items from the E-CAT system or taking the action in the last sentence below. If the proposed Contract Unit Price does not exceed the benchmark above, it will be determined fair and reasonable. Upon acceptance of any proposed price decreases, the Government shall modify the contract electronic catalog residing in the E-CAT system to include the reduced prices. These reduced contract unit prices shall apply to those items ordered on or after the date when these lower prices appear in the contract electronic catalog residing in the E-CAT system. (Revisions will not be added to the electronic catalog prior to date they take effect.)

(ii) If the Contractor fails to notify the Contracting Officer of any OFA Unit Price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the date the new OFA Unit Price takes effect.

(f) Upward Adjustments.

(1) The Base Year contract unit prices are not subject to any upward adjustment. The Contractor is authorized to submit one request for any upward adjustments to contract unit prices for each Option Year. This request shall be submitted no later than 30 days prior to the effective date of the upcoming Option Year (if exercised). The requested upward price adjustments must be based upon increases in the Contractor’s OFA Unit Prices. The request shall include a copy of the revised OFA Unit Prices, the “E-CAT file”, and the following for each item with a proposed increase in Contract Unit Price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The Supplier; e.g., ABC Dental, Inc.

(C) The Product Name/Nomenclature; e.g., High Speed Handpiece.

(D) The Part Number; e.g., HPH2000.

(E) For the initial Option year, the OFA Unit Price that determined the Award Unit Price, the applicable Contract Discount, and the Award Unit Price. For all subsequent Option years, the OFA Unit Price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year, the applicable discount, and the highest Contract Unit Price that was in effect during the preceding Contract Year.

(F) The increased OFA Unit Price, the applicable Contract Discount or larger Contract Discount now offered, and the proposed higher Contract Unit Price.

(G) For the initial Option year, the percentage change from the OFA Unit Price that determined the award unit price to the new higher OFA Unit Price. For all subsequent Option years, the percentage change from the OFA Unit Price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year to the new higher OFA Unit Price.

(H) For the initial Option year, the percentage change from the award unit price to the new higher proposed Contract Unit Price. For all subsequent contract years, the percentage change from the highest Contract Unit Price that was in effect at any time during the preceding contract year to the new higher proposed contract unit price.

(I) For any items offered to Federal Agencies at other than OFA Contract Prices, the non-OFA prices/discounts (if different than the reported OFA Unit Prices/Discounts) offered to those agencies.

(ii) Any other applicable supporting data requested by the Contracting Officer.

(2) Benchmarks For OFA Price Increases: If any OFA Unit Price increases, and the increase is authorized under this clause, the contract unit prices for any corresponding items shall be determined using the increased OFA Unit Price(s) and either the applicable Discount(s) originally awarded or any larger Discount(s) now offered. These increased contract unit prices shall apply to all orders issued on or after the effective date of the increase. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lower of the following two benchmarks:

(i) For the Initial Option Year of the contract, any proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the OFA Unit Price that determined the award unit price to the new higher OFA Unit Price. For all subsequent Option Years, any proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the OFA Unit Price that determined the highest Contract Unit Price that was in effect at any time during the preceding contract year to the new higher OFA Unit Price.

(ii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial Option Year, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent Option Years, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the highest Contract Unit Price in effect during the preceding Contract Year for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the highest Contract Unit Price in effect during the preceding Contract Year plus the annual ceiling.)

Annual Ceiling, All Items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. Upward price adjustments shall be effective on the same day that the Option Year takes effect unless either of the following occurs:

(i) If the Contractor's request for price adjustment is not received a minimum of 30 days prior to the effective date of the upcoming Option Year (if exercised), any approved upward price adjustment shall not be effective until 30 days after receipt of the request.

(ii) If, during the 30-day period the Government has to evaluate prices and update the E-CAT system, the Contracting Officer is unable to determine that a price increase on any item or items is fair and reasonable (i.e., the proposed Contract Unit Price exceeds the lower of the two benchmarks above). In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable.

(A) If necessary, the Contracting Officer shall conduct discussions with the Contractor to reduce the proposed Contract Unit Price to an amount which does not exceed the lower of the two benchmarks and reach an agreement on fair and reasonable prices. When discussions have concluded, the Contractor shall confirm the agreed-to price(s) in writing and forward an E-CAT file which includes the agreed-to price(s). (The agreement shall also identify the OFA price and discount which makes up each agreed-to price.) Once the written agreement is received, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices.

(B) If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will delete these items from the catalog in the E-CAT System. (This procedure applies to only those items whose prices the Contracting Officer is unable to determine fair and reasonable within the 30-day period the Government has to evaluate prices and update the E-CAT System. The remainder of the items whose price increases are determined fair and reasonable, shall be entered into the E-CAT system within the prescribed period.)

(C) In addition, the Contracting Officer may also, at any time, remove any item from the catalog in the E-CAT System that the Contracting Officer believes is no longer reasonably priced (if the Contracting Officer and the Contractor are unable to agree upon a reduced price) and notify customers accordingly.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (f)(2)(ii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in contract unit price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower contract unit price, or delete the item from the contract electronic catalog residing in the E-CAT system. In no case may the increase in contract unit price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a Contract Unit Price that exceeds the other benchmark.

(5) Any increased OFA unit prices shall not be used to compute contract unit prices for delivery orders issued before the date the adjusted contract unit prices take effect under the Contract.

(g) If the Contracting Officer removes items from the E-CAT system for price unreasonableness (see (e)(3), (f)(3)(ii) and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the Contract Unit Price in effect at the time of the order.

(h) If the Contracting Officer at any time has any reason to believe that the OFA Unit Price has been discontinued (e.g., the current OFA contract expires and the Contractor does not receive a subsequent contract), the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that the OFA Unit Price has been discontinued, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this or some other appropriate EPA clause. The Contract shall be modified to incorporate the substitute and its effective date.

(i) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(j) Pending approval of any proposed price changes and revision of the contract unit prices in the contract electronic catalog residing in the E-CAT System, payment shall be made at the contract unit prices in effect at the time of order.

(k) Voluntary price reductions (VPR): “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause.

(1) The Contractor shall notify the Contracting Officer when the VPR takes effect, the applicable items included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the contract unit prices in effect at that time.

(2) f an OFA unit price decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a contract unit price increase based upon an increased OFA unit price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause if no VPR had been in effect.

(End of Clause)

52.216-9046 Economic Price Adjustment – Other Federal Agency Contracts – E-CAT.

As prescribed in 16.203-4(a)(2)(95)(i), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – OTHER FEDERAL AGENCY CONTRACTS - E-CAT

(NOV 2011)

(a) This clause applies to any items under this contract where the offeror has proposed the same (or discounted) prices as are included in any current contract(s) the Contractor may have with other Federal Agencies (OFA) and the Contracting Officer agrees to use this pricing methodology. OFA contracts include GSA Schedule, Federal Supply Schedule, and Department of Veterans Affairs (DVA) National Acquisition Contracts. During the life of this contract, the Contracting Officer and the Contractor may agree in writing to also apply this clause to any other items that previously were not, but subsequently become, available under both this contract and any concurrent OFA contract(s).

(b) Definitions:

(1) Other Federal Agency (OFA) Price: “OFA Prices” or “OFA Unit Prices” refer to the unit prices for specific commercial items the Contractor and another Federal Agency have agreed to and are included in one or more current contracts.

(2) Discount: The percentage reduction off the OFA unit price proposed by the Contractor, accepted by the Government, and maintained in the contract file (not the E-CAT System) by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. (Contractors may offer larger discounts and/or reduced contract unit prices at any time.)

(3) Contract unit price: The price per unit of issue comprised of the OFA Unit Price and the applicable “Discount”. The contract unit price is determined by reducing the OFA Unit Price by the appropriate Discount. Proposed revised prices are loaded by the Contractor into an E-CAT file and are forwarded electronically to the Government. The Contactor shall also separately submit (in Excel Spreadsheet or ACCESS Database format) the additional information as required in paragraphs (e) and (f) below in order for the Government to review and evaluate these proposed price changes. Upon the Government’s determination that the offered prices are acceptable/fair and reasonable, the Government shall release them into the contract electronic catalog residing in the E-CAT System. (contract unit prices, OFA Unit Prices and Discounts under this contract are not visible in the E-CAT System to the Contractor or any customer. The prices visible in the E-CAT System to the Contractor or any customer are the delivered unit prices, which are the contract unit prices plus the DLA Troop Support administrative fee percentage (in effect at that time) charged customers ordering under this contract.)

(4) Voluntary price reduction (VPR): See paragraph (k).

(c) The offeror/Contractor warrants that (1) the OFA unit prices and the subsequent revisions thereto are the OFA unit prices in effect at time of award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these OFA unit prices do not include allowances for any portion of the contingency covered by this clause.

(d) Prior to award, the Contractor must furnish a copy of their current OFA Contract, OFA contract unit prices and the OFA contract expiration date for each item. The Contractor shall also furnish its offered Discounts and proposed contract unit prices. At the option of the Contracting Officer, the Contractor shall also furnish the documentation set forth in paragraphs (f)(1)(i)(I) and (f)(1)(ii) below. Upon acceptance by the Government, the Award Unit Prices shall be established at the OFA Unit Prices minus the offered Discounts.

(e) Downward Adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in OFA Unit Prices. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in OFA Unit Price. The Contractor shall propose a lower Contract Unit Price taking into consideration the benchmark in paragraph (e)(2) below. The Contractor must furnish a copy of the revised OFA Contract and OFA Unit Prices as soon as they are available. Also, the Contractor must provide a copy of the “E-CAT file” at least 30 days prior to the date when the reduced OFA Unit Price takes effect. Finally, the Contractor shall also furnish, within the timeframe above, a separate Excel spreadsheet or ACCESS database (in both hard copy and disc) that displays for each item with an offered decrease in Contract Unit Price the following information:

(i) The item number; e.g., 0003.

(ii) The Supplier; e.g., ABC Dental, Inc.

(iii) The Product Name/Nomenclature; e.g., High Speed Handpiece.

(iv) The Part Number; e.g., HPH2000.

(v) The applicable contract discount used as a basis for determining the current Contract Unit Price.

(vi) The OFA Unit Price upon which the current Contract Unit Price is based.

(vii) The Contract Unit Price currently in effect.

(viii) The applicable Contract Discount or larger Contract Discount now offered.

(ix) The reduced OFA Unit Price.

(x) The reduced Contract Unit Price now offered.

(xi) The percentage decrease in OFA Unit Price from the OFA Unit Price that determined the Current Contract Unit Price to the new, lower OFA Unit Price.

(xii) The percentage decrease in Contract Unit Price from the current Contract Unit Price to the new lower Contract Unit Price now offered.

(2) Benchmark For OFA Price Reductions. The appropriate Contract Discount or larger Discount now offered will be applied to each reduced OFA Unit Price to determine the adjusted Contract Unit Price provided the adjusted Contract Unit Price does not exceed the following benchmark:

The offered reduction in Contract Unit Price on a percentage basis must be at least equal to the percentage reduction from the OFA Unit Price that determined the current Contract Unit Price to the new lower OFA Unit Price, i.e., the current Contract Unit Price must, as a minimum, be reduced by the percentage decrease in the OFA Unit Price.

(3) If the proposed Contract Unit Price exceeds the benchmark above, the Contracting Officer shall determine the proposed price reductions unreasonable. The Contracting Officer and Contractor shall negotiate a reduction in the proposed Contract Unit Price to an amount that does not exceed the benchmark above. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the OFA prices and discount(s) which make up these prices.) If an agreement cannot be reached, the Contracting Officer has the option of removing these items from the E-CAT system or taking the action in the last sentence below.

If the proposed Contract Unit Price does not exceed the benchmark above, it will be determined fair and reasonable. Upon acceptance of any proposed price decreases, the Government shall modify the contract electronic catalog residing in the E-CAT system to include the reduced prices. These reduced contract unit prices shall apply to those items ordered on or after the date when these lower prices appear in the contract electronic catalog residing in the E-CAT system (Revisions will not be added to the electronic catalog prior to date they take effect).

If the Contractor fails to notify the Contracting Officer of any OFA Unit Price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the date the new OFA unit price takes effect.

(f) Upward adjustments.

(1) Upward adjustments may be requested at any time. The requested upward price adjustments must be based upon increases in the Contractor’s OFA Unit Prices. The request shall include a copy of the revised OFA unit prices, the “E-CAT file”, and the following for each item with a proposed increase in contract unit price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The supplier; e.g., ABC Dental, Inc.

(C) The product name/nomenclature; e.g., high speed hand-piece.

(D) The part number, e.g., HPH2000.

(E) For the initial year, the OFA unit price that determined the award unit price, the applicable contract discount, and the award unit price. For all subsequent contract years, the OFA unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year, the applicable discount, and the highest contract unit price that was in effect during the preceding contract year.

(F) The increased OFA Unit Price, the applicable Contract Discount or larger Contract Discount now offered, and the proposed higher Contract Unit Price.

(G) For the initial year, the percentage change from the OFA Unit Price that determined the award unit price to the new higher OFA Unit Price. For all subsequent contract years, the percentage change from the OFA Unit Price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year to the new higher OFA Unit Price.

(H) For the initial year, the percentage change from the award unit price to the new higher proposed contract unit price. For all subsequent contract years, the percentage change from the highest contract unit price that was in effect at any time during the preceding contract year to the new higher proposed contract unit price.

(I) For any items offered to the Department of Veterans Affairs and the General Services Administration at other than OFA contract prices, the non-OFA prices/discounts (if different than the reported OFA unit prices/discounts) offered to those agencies.

(ii) Any other applicable supporting data requested by the Contracting Officer.

(2) Benchmarks for OFA price increases: If any OFA unit price increases, and the increase is authorized under this clause, the contract unit prices for any corresponding items shall be determined using the increased OFA unit price(s) and either the applicable discount(s) originally awarded or any larger discount(s) now offered. These increased contract unit prices shall apply to all orders issued on or after the date these revised unit prices appear in the electronic catalog residing in the E-CAT system. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lower of the following two benchmarks:

(i) For the initial year of the contract, any proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the OFA unit price that determined the award unit price to the new higher OFA unit price. For all subsequent contract years, any proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the OFA unit price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher OFA unit price.

(ii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial contract year, contract unit price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher contract unit price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent Contract Years, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the highest Contract Unit Price in effect during the preceding Contract Year for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the highest Contract Unit Price in effect during the preceding Contract Year plus the annual ceiling.)

Annual Ceiling, All Items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices.

Upward price adjustments shall be effective once they appear in the contract electronic catalog residing in the E-CAT system. These updates will take place within 60 days after receipt of the Contractor’s request for upward price adjustment (or at the same time the increased OFA Price takes effect, whichever is later) unless the Contracting Officer is unable to determine during that period that a price increase on any item or items is fair and reasonable (i.e., the proposed Contract Unit Price exceeds the lower of the two benchmarks above).

In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable.

If necessary, the Contracting Officer shall conduct discussions with the Contractor to reduce the proposed Contract Unit Price to an amount which does not exceed the lower of the two benchmarks and reach an agreement on fair and reasonable prices. When discussions have concluded, the Contractor shall confirm the agreed-to price(s) in writing and forward an E-CAT file which includes the agreed-to price(s). (The agreement shall also identify the OFA price and discount which makes up each agreed-to price.)

Once the written agreement is received, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will delete these items from the catalog in the E-CAT System. (This procedure applies to only those items whose prices the Contracting Officer is unable to determine fair and reasonable within the 60-day period the Government has to evaluate prices and update the E-CAT System.

The remainder of the items whose price increases are determined fair and reasonable, shall be entered into the E-CAT system within the prescribed period.)

In addition, the Contracting Officer may also, at any time, remove any item from the catalog in the E-CAT System that the Contracting Officer believes is no longer reasonably priced (if the Contracting Officer and the Contractor are unable to agree upon a reduced price) and notify customers accordingly.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (f)(2)(ii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in Contract Unit Price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower Contract Unit Price, or delete the item from the contract electronic catalog residing in the E-CAT system. In no case may the increase in Contract Unit Price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a contract unit price that exceeds the other benchmark.

(5) Any increased OFA unit prices shall not be used to compute contract unit prices for Delivery Orders issued before the date the adjusted contract unit prices take effect under the Contract(i.e., the date they appear in the contract electronic catalog residing in the E-CAT system).

(g) If the Contracting Officer removes items from the E-CAT system for price unreasonableness (see (e)(3), (f)(3) and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the Contract Unit Price in effect at the time of the order.

(h) If the Contracting Officer at any time has any reason to believe that the OFA Unit Price has been discontinued (e.g., the current OFA contract expires and the Contractor does not receive a subsequent contract), the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that the OFA unit price has been discontinued, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this or some other appropriate EPA clause. The contract shall be modified to incorporate the substitute and its effective date.

(i) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(j) Pending approval of any proposed price changes and revision of the contract unit prices in the contract electronic catalog residing in the E-CAT System, payment shall be made at the contract unit prices in effect at the time of order.

(k) Voluntary price reductions (VPR): A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, the applicable items included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the contract unit prices in effect at that time.

If an OFA unit price decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a contract unit price increase based upon an increased OFA unit price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause if no VPR had been in effect.

(End of Clause)

52.216-9047 Economic Price Adjustment – Established Catalog Price – One Upward Adjustment Per Option Year E-CAT Solicitation.

As prescribed in 16.203-4(a)(2)(90)(ii), 16.203-4(a)(2)(91)(ii), 16.203-4(a)(2)(96)(i), and 16.203-4(a)(2)(97), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – ESTABLISHED CATALOG PRICE ONE UPWARD ADJUSTMENT PER OPTION YEAR E-CAT SOLICITATION (NOV 2011)

(a) All price adjustments authorized or mandated by this clause are based upon changes in the Contractor’s list prices and certain Other Federal Agency (OFA) contract unit prices. The clause also provides for voluntary price reductions (VPR) in the form of “specials” or “discounts”.

(b) Definitions:

(1) Contract Unit Price: The price per unit of issue comprised of the “List Price” and the applicable “Discount”. The Contract Unit Price is determined by reducing the applicable list price by the appropriate discount. Contract unit prices and any revisions thereto are loaded by the Contractor into an E-CAT File and are forwarded electronically to the Government. For proposed price changes, the Contractor shall also separately submit (in Excel Spreadsheet or ACCESS Database format) the additional information as required in paragraphs (g) and (h) below in order for the Government to review and evaluate these proposed price changes. Upon the Government’s determination that the offered unit prices are acceptable/fair and reasonable, the Government shall release them into the contract electronic catalog residing in the E-CAT System. (Contract unit prices, list prices, and discounts under this contract are not visible in the E-CAT System to the Contractor or any customer. The prices visible in the E-CAT System to the Contractor or any customer are the delivered unit prices which are the contract unit prices plus the DLA Troop Support administrative fee percentage (in effect at that time) charged customers ordering under this contract.)

(2) Discount: The percentage reduction off the list price proposed by the Contractor, accepted by the Government, and maintained in the contract file (not the E-CAT System) by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. These discounts are in addition to any standard trade discounts in the Contractor’s established commercial Catalog/Price List. (Contractors may offer larger discounts and/or reduced List Prices at any time.)

(3) List Price: The established Catalog Unit Prices of the items. In order for a “List Price” to meet the criteria as an established Catalog Price, it must meet the definition in (c)(1) below.

(4) Voluntary Price Reduction (VPR): See paragraph (l).

(c)(1) The term "established Catalog Unit Price", as used in this clause, means a Unit Price that (i) is a Catalog Price for a commercial item sold in substantial quantities to the general public and (ii) is the net price after applying any standard trade discounts offered by the Contractor.

(2) Unless otherwise specified, all reference to the terms “OFA Unit Price”(s) or “ OFA Price(s)” as used in this clause, shall be the prices appearing in the Contractor’s current contract it may have with another Federal Agency for the same items under this contract.

(d) The offeror/Contractor warrants that (1) the List Prices and the subsequent revisions thereto are the established Catalog Unit Prices in effect at time of Award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these List Prices do not include allowances for any portion of the contingency covered by this clause. The offeror/Contractor also warrants that any contract unit prices determined using OFA Unit Prices do not include allowances for any portion of the contingency covered by this clause.

(e) Prior to award the Contractor must furnish:

(1) Their current established Catalog/Price List, offered Discounts, proposed contract unit prices; and

(2) If applicable, a copy of their current OFA Contract(s), OFA Unit Prices, and the OFA contract expiration dates applicable to items offered as well as any other information required by the Contracting Officer.

(f) Upon acceptance by the Government, the Award Unit Prices will be established at the List Prices minus the offered Discounts provided the resulting contract unit prices do not exceed the current OFA Unit Price (if applicable) for the same item. Accordingly, offers are cautioned to propose discounts which, when applied to the list prices, will not exceed OFA Unit Prices (if applicable).

(g) Downward Adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in either 1) List Prices or 2) OFA Unit Prices when the reduction results in a revised OFA Price which is now lower than the current Contract Unit Price. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in list price and any OFA Unit Price reduction which results in an OFA Unit Price which is now lower than the current Contract Unit Price. If the offered price decrease is based upon a reduction in list price or OFA Price, the Contractor shall propose a lower Contract Unit Price taking into consideration the benchmarks in paragraphs (g)(2) and (3) below. The Contractor must furnish a copy of the revised Catalog/Price List or OFA Unit Price as soon as it is available. Also, the Contractor must provide a copy of the “E-CAT file” at least 30 days prior to the date when the reduced List Price(s) or OFA Price(s) take effect. In addition to the “E-CAT file” and any other information required by the Contracting Officer, the Contractor shall also separately furnish, within the timeframe above, an Excel spreadsheet or ACCESS database (in both hard copy and disc) that displays for each item with an offered decrease in Contract Unit Price the appropriate information below:

(i) For List or OFA Price changes: The item number; e.g., 0001AA.

(ii) For List or OFA Price changes: The Supplier (Catalog); e.g., ABC Imaging, Inc.

(iii) For List or OFA Price changes: The Product Name/Nomenclature; e.g., High Speed Handpiece.

(iv) For List or OFA Price changes: Part Number; HIH 2000

(v) For List or OFA Price changes: The list price upon which the current Contract Unit Price is based.

(vi) For List or OFA Price changes: The applicable Contract Discount used as a basis for determining the current Contract Unit Price.

(vii) For List or OFA Price changes: The Contract Unit Price currently in effect.

(viii) For list price changes: The reduced List Price.

(ix) For List or OFA Price changes: The applicable Contract Discount or larger Contract Discount now offered.

(x) For List or OFA Price changes: The reduced Contract Unit Price now offered.

(xi) For list price changes: The percentage decrease in list price from the list price which determined the current contract unit price to the new, lower list price.

(xii) For list price changes: The percentage change in contract unit price from the current contract unit price to the new lower contract unit price now offered.

(xiii) For OFA Price changes: The current OFA unit price which is about to expire and the new reduced OFA unit price which will replace it and triggered this contract Unit Price reduction.

(xiv) For list price changes: For any items offered to Federal Agencies under an OFA Contract, the current OFA Unit Price(s) for the same item.

(2) Reductions in list price(s). if the offered price decrease is based upon a reduction in the list price, the appropriate discount or larger discount now offered will be applied to each reduced list price to determine the adjusted contract unit price provided the proposed lower contract unit Price does not exceed the lower of the following two benchmarks:

(i) The offered reduction in Contract Unit Price on a percentage basis must be at least equal to the percentage reduction from the list price currently in effect under the contract to the new lower List Price; i.e., the current Contract Unit Price must, as a minimum, be reduced by the percentage decrease in List Price.

(ii) The new proposed lower Contract Unit Price shall not exceed the current OFA Unit Price for the same item.

(3) OFA price reductions. If the offered price decrease is based upon a reduction in the OFA price, the proposed lower contract unit price shall not exceed the following benchmark:

The new proposed lower contract unit price shall not exceed the revised lower OFA price for the same item.

(4) If the proposed contract unit price exceeds the lower of the appropriate list price benchmarks (for reductions based upon reduced List Prices) or the OFA Price benchmark (for reductions based upon reduced OFA Prices), the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the appropriate benchmarks. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the list price(s) and discount(s) which make up these prices.

Changes based upon OFA Price reductions will be expressed in terms of the current list price and an appropriate discount which results in an adjusted Contract Unit Price which does not exceed the revised lower OFA Price.) If an agreement cannot be reached the Contracting Officer has the option of removing these items from the E-CAT system or taking the action in the last sentence below. If the proposed Contract Unit Price does not exceed the lowest of the appropriate list price or OFA Price benchmarks, it will be determined fair and reasonable.

Upon acceptance of any proposed price decreases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the reduced contract unit prices. (Changes based upon OFA Price reductions will be expressed in terms of the current list price and an appropriate discount which results in an adjusted Contract Unit Price which does not exceed the revised lower OFA Price). These reduced contract unit prices shall apply to those items ordered on or after the date the reduced list or OFA prices take effect (Revisions will not be added to the electronic catalog prior to date they take effect).

If the Contractor fails to notify the Contracting Officer of any list price or OFA Price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the effective date of the decrease in the Contractor’s established List or OFA Prices.

(h) Upward Adjustments.

(1) The Base Year contract unit prices are not subject to any upward adjustment. The Contractor is authorized to submit one request for any upward adjustments to contract unit prices for each Option Year. This request shall be submitted no later than 30 days prior to the effective date of the upcoming Option Year (if exercised). Each request for upward price adjustment must be based upon increases in List Prices only. The Contractor shall propose a Contract Unit Price taking into consideration the benchmarks in paragraph (h)(2). The request shall include a copy of the revised Catalog/Price List, the “E-CAT file” and the following for each item with a proposed increase in Contract Unit Price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The Supplier(Catalog); e.g., ABC Dental, Inc.

(C) The Product Name/Nomenclature; e.g., High Speed Handpiece.

(D) The Part Number; e.g., HIH2000.

(E) For the initial Option year, the list price that determined the Award Unit Price, the applicable Contract Discount, and the Award Unit Price. For all subsequent Option years, the list price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year, the applicable discount, and the highest Contract Unit Price that was in effect during the preceding Contract Year.

(F) The increased list price and its effective date, the applicable Contract Discount or larger Contract Discount now offered, and the proposed higher Contract Unit Price.

(G) For the initial Option year, the percentage change from the list price that determined the award unit price to the new higher List Price. For all subsequent Option years, the percentage change from the list price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year to the new higher List Price.

(H) For the initial Option year, the percentage change from the award unit price to the new higher proposed Contract Unit Price. For all subsequent Option years, the percentage change from the highest Contract Unit Price that was in effect at any time during the preceding contract year to the new higher proposed Contract Unit Price.

(I) For any items offered to another Federal Agency under an OFA Contract, the current OFA Unit Price(s) for the same item.

(J) Any other information required by the Contracting Officer.

(2) Benchmarks. If any list price increases, and the increase is authorized under this clause, the contract unit prices for any corresponding items ordered after the increase takes effect shall be determined using the increased list price and either the applicable Discount originally awarded or any larger Discount now offered that applies to the affected item. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lowest of the following three benchmarks:

(i) For the Initial Option Year of the contract, the proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the list price that determined the award unit price to the new higher List Price. For all subsequent Option Years, the proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the list price that determined the highest Contract Unit Price that was in effect at any time during the preceding contract year to the new higher List Price.

(ii) Any proposed higher Contract Unit Price shall not exceed the current OFA Unit Price for the same item.

(iii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial Option Year, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent Option Years, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the highest Contract Unit Price in effect during the preceding Contract Year for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the highest Contract Unit Price in effect during the preceding Contract Year plus the annual ceiling.)

Annual Ceiling, All Items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. Upward price adjustments shall be effective on the same day that the Option Year takes effect unless either of the following occurs:

(i) If the Contractor's request for price adjustment is not received a minimum of 30 days prior to the effective date of the upcoming Option Year (if exercised), any approved upward price adjustment shall not be effective until 30 days after receipt of the request.

(ii) If, during the 30-day period the Government has to evaluate prices and update the E-CAT system, the Contracting Officer is unable to determine that a price increase on any item or items is fair and reasonable (i.e., the proposed Contract Unit Price exceeds the lowest of the three benchmarks above). In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable.

If necessary, the Contracting Officer shall conduct discussions with the Contractor to negotiate a price reduction which results in a Contract Unit Price that does not exceed the lowest of the three benchmarks. When discussions have concluded and an agreement which results in fair and reasonable prices is reached, the Contractor shall confirm the agreed-to price(s) in writing and forward an E-CAT file which includes the agreed-to price(s). (The agreement shall also identify the list price and discount which makes up each agreed-to price.)

Once the written agreement is received, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will delete these items from the catalog in the E-CAT System. (This procedure applies to only those items whose prices the Contracting Officer is unable to determine fair and reasonable within the 30-day period the Government has to evaluate prices and update the E-CAT System. The remainder of the items whose price increases are determined fair and reasonable, shall be entered into the E-CAT system within the prescribed period.) In addition, the Contracting Officer may also, at any time, remove any item from the catalog in the E-CAT System that the Contracting Officer believes is no longer reasonably priced (if the Contracting Officer and the Contractor are unable to agree upon a reduced price) and notify customers accordingly.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (h)(2)(iii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in Contract Unit Price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower Contract Unit Price, or delete the item(s) from the contract electronic catalog residing in the E-CAT system. In no case may the increase in Contract Unit Price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a Contract Unit Price that exceeds the other benchmarks.

(5) Any increased List Prices shall not be used to compute contract unit prices for Delivery Orders issued before the date the adjusted contract unit prices take effect under the Contract.

(6) If the Contracting Officer removes items from the E-CAT system for price unreasonableness (see (g)(4) and (h)(3)(ii) and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the Contract Unit Price in effect at the time of the order.

(i) If the Contracting Officer at any time has any reason to believe that the established list price has been discontinued, the basis for the list price has been substantially altered, or that the item no longer meets the criteria to qualify as an established Catalog Priced item, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that any of the preceding conditions are present and a substitute for determining price adjustments is needed, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this clause. The contract shall be modified to incorporate the substitute and its effective date.

(j) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(k) Pending approval of any proposed price changes and revision of the contract unit prices in the contract electronic catalog residing in the E-CAT System, payment shall be made at the contract unit prices in effect at the time of order.

(l) Voluntary price reductions (VPR): A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, which items are items included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the Contract Unit Price(s) in effect at that time.

If a list price (or OFA unit price) decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. f the Contractor requests a contract unit price increase based upon an increased list price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause as if no VPR had been in effect.

(End of Clause)

52.216-9048 Economic Price Adjustment – Established Catalog Price – Multiple Adjustments Authorized Per Clause Terms – E-CAT Solicitation.

As prescribed in 16.203-4(a)(2)(97), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – ESTABLISHED CATALOG PRICE - MULTIPLE ADJUSTMENTS AUTHORIZED PER CLAUSE TERMS - E-CAT SOLICITATION (NOV 2011)

(a) All price adjustments authorized or mandated by this clause are based upon changes in the Contractor’s list prices and certain Federal Supply Schedule (FSS) unit prices. The clause also provides for voluntary price reductions (VPR) in the form of “specials” or “discounts”.

(b) Definitions:

(1) Contract unit price: The price per unit of issue comprised of the “List Price” and the applicable “Discount”. The Contract unit price is determined by reducing the applicable list price by the appropriate Discount. Proposed revised prices are loaded by the Contractor into an E-CAT File and are forwarded electronically to the Government. The Contractor shall also separately submit (in Excel Spreadsheet or ACCESS database format) the additional information as required in paragraphs (g) and (h) below in order for the Government to review and evaluate these proposed price changes. Upon the Government’s determination that the offered unit prices are acceptable/fair and reasonable, the Government shall release them into the contract electronic catalog residing in the E-CAT System. (Contract unit prices, list prices, and discounts under this contract are not visible in the E-CAT System to the Contractor or any customer. The prices visible in the E-CAT System to the Contractor or any customer are the delivered unit prices which are the contract unit prices plus the DLA Troop Support administrative fee percentage (in effect at that time) charged customers ordering under this contract.)

(2) Discount: The percentage reduction off the list price proposed by the Contractor, accepted by the Government, and maintained in the contract file (not the E-CAT System) by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. These discounts are in addition to any standard trade discounts in the Contractor’s established commercial catalog/price list. (Contractors may offer larger discounts and/or reduced list prices at any time.)

(3) List price: The established catalog unit prices of the items. In order for a “List Price” to meet the criteria as an established Catalog Price, it must meet the definition in (c)(1) below.

(4) Voluntary price reduction (VPR): See paragraph (l).

(c)(1) The term "established catalog unit price", as used in this clause, means a unit price that (i) is a catalog price for a commercial item sold in substantial quantities to the general public and (ii) is the net price after applying any standard trade discounts offered by the Contractor.

(2) Unless otherwise specified, all reference to the terms “FSS Unit Price”(s) or “FSS Price(s)” as used in this clause, shall be the prices appearing in the Contractor’s current Federal Supply Schedule for the same items under this contract.

(d) The offeror/Contractor warrants that (1) the List Prices and the subsequent revisions thereto are the established Catalog Unit Prices in effect at time of Award or adjustment for like quantities of the same items and (2) any contract unit prices determined using these List Prices do not include allowances for any portion of the contingency covered by this clause. The offeror/Contractor also warrants that any contract unit prices determined using FSS unit prices do not include allowances for any portion of the contingency covered by this clause.

(e) Prior to award the Contractor must furnish:

(1) Their current established Catalog/Price List, offered Discounts, proposed contract unit prices; and

(2) A copy of their current FSS’s, FSS unit prices, and the FSS contract expiration dates applicable to items offered as well as any other information required by the Contracting Officer.

(f) Upon acceptance by the Government, the award unit prices will be established at the list prices minus the offered discounts provided the resulting contract unit prices do not exceed the current FSS unit price for the same item. Accordingly, offers are cautioned to propose discounts which, when applied to the list prices, will not exceed FSS unit prices.

(g) Downward Adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in either 1) List prices or 2) FSS unit prices when the reduction results in a revised FSS Price which is now lower than the current contract unit price. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in list price and any FSS unit price reduction which results in an FSS unit price which is now lower than the current contract unit price. If the offered price decrease is based upon a reduction in list price or FSS price, the Contractor shall propose a lower Contract Unit Price taking into consideration the benchmarks in paragraphs (g)(2) and (3) below. The Contractor must furnish a copy of the revised Catalog/Price List or FSS Unit Price as soon as it is available. Also, for reductions in List Prices, the Contractor must provide a copy of the “E-CAT file” at least 60 days prior to the date when the reduced List Prices take effect. For reductions in FSS, the Contractor shall provide a copy of the E-CAT file at least 30 days prior to the date the reduced FSS Unit Price takes effect.

In addition to the “E-CAT file” and any other information required by the Contracting Officer, the Contractor shall also separately furnish, within the appropriate timeframe above (i.e., at least 60 days for a reduction in List Price; at least 30 days for a reduction in FSS), an Excel spreadsheet or ACCESS database (in both hard copy and disc) that displays for each item with an offered decrease in Contract Unit Price the appropriate information below:

(i) For list price or FSS changes: The item number; e.g., 0001AA.

(ii) For list price or FSS changes: The Supplier (Catalog); e.g., ABC Imaging, Inc.

(iii) For list price or FSS changes: The Product Name/Nomenclature; e.g., High Speed Handpiece.

(iv) For list price or FSS changes: Part Number; HIH 2000

(v) For list price or FSS changes: The list price upon which the current Contract Unit Price is based.

(vi) For list price or FSS changes: The applicable Contract Discount used as a basis for determining the current Contract Unit Price.

(vii) For list price or FSS changes: The Contract Unit Price currently in effect.

(viii) For list price changes: The reduced list price.

(ix) For list price or FSS changes: The applicable contract discount or larger contract discount now offered.

(x) For list price or FSS changes: The reduced Contract Unit Price now offered.

(xi) For list price changes: The percentage decrease in list price from the list price which determined the current contract unit price to the new, lower list price.

(xii) For list price changes: The percentage change in contract unit price from the current contract unit price to the new lower contract unit price now offered.

(xiii) For FSS changes: The current FSS unit price which is about to expire and the new reduced FSS Unit Price which will replace it and triggered this contract unit price reduction.

(xiv) For list price changes: For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS Unit Price(s) for the same item.

(2) Reductions in list price(s). If the offered price decrease is based upon a reduction in the list price, the appropriate discount or larger discount now offered will be applied to each reduced list price to determine the adjusted contract unit price provided the proposed lower contract unit price does not exceed the lower of the following two benchmarks:

(i) The offered reduction in contract unit price on a percentage basis must be at least equal to the percentage reduction from the list price currently in effect under the contract to the new lower list price; i.e., the current contract unit price must, as a minimum, be reduced by the percentage decrease in list price.

(ii) The new proposed lower contract unit price shall not exceed the current FSS unit price for the same item.

(3) FSS price reductions. If the offered price decrease is based upon a reduction in the FSS price, the proposed lower contract unit price shall not exceed the following benchmark:

The new proposed lower Contract Unit Price shall not exceed the revised lower FSS Price for the same item.

(4) If the proposed contract unit price exceeds the lower of the appropriate list price benchmarks (for reductions based upon reduced list prices) or the FSS Price benchmark (for reductions based upon reduced FSS Prices), the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the appropriate benchmarks. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s) and the list price(s) and discount(s) which make up these prices.

Changes based upon FSS price reductions will be expressed in terms of the current list price and an appropriate discount which results in an adjusted Contract Unit Price which does not exceed the revised lower FSS Price.) If an agreement cannot be reached the Contracting Officer has the option of removing these items from the E-CAT system or taking the action in the last sentence below. If the proposed contract unit price does not exceed the lowest of the appropriate list price or FSS Price benchmarks, it will be determined fair and reasonable.

Upon acceptance of any proposed price decreases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the reduced contract unit prices. (Changes based upon FSS price reductions will be expressed in terms of the current list price and an appropriate discount which results in an adjusted contract unit price which does not exceed the revised lower FSS price.) These reduced contract unit prices shall apply to those items ordered on or after the date when these prices appear in the contract electronic catalog residing in the E-CAT system (Revisions will not be added to the electronic catalog prior to date they take effect).

If the Contractor fails to notify the Contracting Officer of any list price or FSS Price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the effective date of the decrease in the Contractor’s established List or FSS Prices.

(h) Upward Adjustments.

(1) Upward adjustments may be requested at any time. However, any request for upward price adjustment must be based upon increases in List Prices only. The Contractor shall propose a Contract Unit Price taking into consideration the benchmarks in paragraph (g)(2). The request shall include a copy of the revised Catalog/Price List, the “E-CAT file” and the following for each item with a proposed increase in Contract Unit Price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The Supplier(Catalog); e.g., ABC Dental, Inc.

(C) The Product Name/Nomenclature; e.g., High Speed Handpiece.

(D) The Part Number; e.g., HIH2000.

(E) For the initial year, the list price that determined the Award Unit Price, the applicable Contract Discount, and the Award Unit Price. For all subsequent contract years, the list price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year, the applicable discount, and the highest Contract Unit Price that was in effect during the preceding Contract Year.

(F) The increased list price and its effective date, the applicable Contract Discount or larger Contract Discount now offered, and the proposed higher Contract Unit Price.

(G) For the initial year, the percentage change from the list price that determined the award unit price to the new higher list price. For all subsequent contract years, the percentage change from the list price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher list price.

(H) For the initial year, the percentage change from the award unit price to the new higher proposed contract unit price. For all subsequent contract years, the percentage change from the highest contract unit price that was in effect at any time during the preceding contract year to the new higher proposed contract unit price.

(I) For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS Unit Price(s) for the same item.

(J) Any other information required by the Contracting Officer.

(2) Benchmarks. If any list price increases, and the increase is authorized under this clause, the contract unit prices for any corresponding items ordered after the increase takes effect in the E-CAT system shall be determined using the increased list price and either the applicable discount originally awarded or any larger discount now offered that applies to the affected item. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lowest of the following three benchmarks:

(i) For the initial year of the contract, the proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the list price that determined the award unit price to the new higher list price. For all subsequent contract years, the proposed increase in contract unit price on a percentage basis cannot exceed the percentage increase from the list price that determined the highest contract unit price that was in effect at any time during the preceding contract year to the new higher list price.

(ii) Any proposed higher Contract Unit Price shall not exceed the current FSS Unit Price for the same item.

(iii) Any proposed higher contract unit prices are subject to the following limitations:

(A) For the initial Contract Year, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the award unit price plus the annual ceiling).

(B) For all subsequent contract years, contract unit price increases shall be limited to the following annual ceiling(s) applied to the highest contract unit price in effect during the preceding contract year for the same item (i.e., any proposed higher contract unit price cannot exceed the highest contract unit price in effect during the preceding contract year plus the annual ceiling.)

Annual Ceiling, All Items: 10%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. Upward price adjustments shall be effective once they appear in the contract electronic catalog residing in the E-CAT system. These updates will take place within 60 days after receipt of the Contractor’s request for upward price adjustment (or at the same time the increased list price takes effect, whichever is later) unless the Contracting Officer is unable to determine during that period that a price increase on any item or items is fair and reasonable (i.e., the proposed Contract Unit Price exceeds the lowest of the three benchmarks above). In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable.

If necessary, the Contracting Officer shall conduct discussions with the Contractor to negotiate a price reduction which results in a Contract Unit Price that does not exceed the lowest of the three benchmarks. When discussions have concluded and an agreement which results in fair and reasonable prices is reached, the Contractor shall confirm the agreed-to price(s) in writing and forward an E-CAT file which includes the agreed-to price(s). (The agreement shall also identify the list price and discount which makes up each agreed-to price.)

Once the written agreement is received, the Government shall modify the contract electronic catalog residing in the E-CAT System to include the increased contract unit prices. (No increase will be effective prior to the date the increased list price(s) take effect.) If the Contracting Officer and the Contractor are unable to agree upon the price for any items, the Contracting Officer will delete these items from the catalog in the E-CAT System.

In addition, the Contracting Officer may also, at any time, remove any item from the catalog in the E-CAT System that the Contracting Officer believes is no longer reasonably priced (if the Contracting Officer and the Contractor are unable to agree upon a reduced price) and notify customers accordingly.

(4) Isolated incidents may occur for an item or group of items when proposed increases could exceed the annual ceiling benchmark in paragraph (h)(2)(iii). In such cases the Contractor can submit an adequately justified written request for Contracting Officer approval of an increase in contract unit price that exceeds the ceiling. The Contracting Officer may approve the request on a one-time basis, increase the ceiling for the item or group of items if appropriate, negotiate a lower contract unit price, or delete the item(s) from the contract electronic catalog residing in the E-CAT system. In no case may the increase in contract unit price exceed the ceiling without written authorization from the Contracting Officer. Also, no increase will be authorized that results in a contract unit price that exceeds the other benchmarks.

(5) Any increased list prices shall not be used to compute contract unit prices for Delivery Orders issued before the date the adjusted contract unit prices take effect under the Contract (i.e., the date they appear in the contract electronic catalog residing in the E-CAT system).

(6) If the Contracting Officer removes items from the E-CAT system for price unreasonableness (see (g)(4) and (h)(3)and (4) above), all outstanding orders issued prior to the date the items are removed shall be delivered in accordance with the contract delivery schedule and the Government shall pay for such items at the contract unit price in effect at the time of the order.

(i) If the Contracting Officer at any time has any reason to believe that the established list price has been discontinued, the basis for the list price has been substantially altered, or that the item no longer meets the criteria to qualify as an established catalog priced item, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that any of the preceding conditions are present and a substitute for determining price adjustments is needed, the parties shall promptly agree upon an appropriate substitute for determining adjustments pursuant to this or another appropriate clause. The Contract shall be modified to incorporate the substitute and its effective date.

(j) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(k) Pending approval of any proposed price changes and revision of the contract unit prices in the contract electronic catalog residing in the E-CAT System, payment shall be made at the contract unit prices in effect at the time of order.

(l) Voluntary price reductions (VPR): A “special or discount” offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time.

The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, which items are included, and the length of time the VPR will remain in effect. Once the “special or discount” period expires, prices will revert to the contract unit price(s) in effect at that time.

If a list price (or FSS Unit Price) decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a contract unit price increase based upon an increased list price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause as if no VPR had been in effect.

(End of Clause)

52.216-9049 Economic Price Adjustment (EPA) of the Annual Management Fee(s) and Annual Management Cost(s) for the Option Years.

As prescribed in 16.203-4(d)(2)(91), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) OF THE ANNUAL MANAGEMENT FEE(S) AND ANNUAL MANAGEMENT COST(S) FOR THE OPTION YEARS (NOV 2011)

(a)(1) The Contractor warrants that the prices/costs and fees included in the Solicitation/Contract do not include allowances for any portion of the contingency covered by this clause. Any management fees and related management costs applicable to this contract (e.g., inventory and/or program) shall be calculated in accordance with this clause. The type(s) of management fee(s) and related management cost(s) that apply are specified elsewhere in this contract.

(2) Adjustments under this clause are predicated upon the Government exercising one or more option year extensions. The Government, at its discretion may choose to exercise or not exercise an option to extend the contract.

(b) The economic indicator for the purpose of calculating the management fee(s) (expressed as a percentage) and management cost(s) for each option year except the initial option year* under this clause shall be the initial publication of the preliminary producer price index for code number 4931104931101 entitled General Warehousing And Storage. This information is contained in the publication entitled "Producer Price Indexes", as published by the United States (U.S.) Department of Labor (DoL), Bureau of Labor Statistics (BLS). The preliminary index for a given month is available approximately two weeks into the following month. The index is also available through the Bureau of Labor Statistics web site at www.bls.gov. Click on “get detailed statistics” and select “series report”. Enter Series ID pcu4931104931101, select number of years and format for output, and then select “retrieve data” at the bottom of the page. (*Note: The base index for the first option year will use the revised PPI).

(c) This clause authorizes only one calculation annually (see paragraph (d)) to determine the management fee(s) and management cost(s) applicable to the upcoming option year. (The management fee(s) and management cost(s) for the base contract period are not subject to adjustment under this clause.) This calculation is as follows:

(1) A "base" and "adjusting" index shall be established for each option year (see paragraph (e) below).

(2) The percentage change (upward or downward) between the applicable "base" index and "adjusting" index shall be calculated.

(3) The management fee(s) for the contract year about to expire shall be increased or decreased based upon the percentage change in the indexes (see paragraph (h) for upward adjustments) in order to determine the management fee(s) for the upcoming option year. (However, for increases or decreases, Contractors may offer lower management fee(s) than those calculated in accordance with this formula).

(4) (A) The new management fee(s) for the upcoming option year shall be applied to one or more categories of guaranteed coverage (e.g., Contractor inventory material (CIM), Contractor furnished material (CFM), and Government purchased material (GPM)) as spelled out elsewhere in this contact.) The resultant subtotals represent the management cost(s) for each applicable category of guaranteed coverage and are added together to get the total management cost(s) for the upcoming option year. For payment purposes, the total management cost(s) for the upcoming option year may be paid on a monthly, quarterly, or some other basis at the discretion of the Contracting Officer.

(B) Prior to applying the new or current management fee(s) to the guaranteed coverage, the value of each category of guaranteed coverage is updated yearly by the Contracting Officer. This is accomplished by applying the DAPA, Federal Supply Schedule (FSS), ECAT, or Department of Defense (DoD) national contract price(s) (whichever is lower) in effect 60 days prior to the date the option takes effect to the quantities in each category of guaranteed coverage for the upcoming option year. The resultant subtotals represent the new value for each applicable category of guaranteed coverage and added together, represents the total inventory value for the upcoming option year.

(d)(1) Adjustment requests and notifications.

(i) If the “adjusting” index is higher than the “base” index, the Contractor may request an increase in accordance with the terms of this clause in the management fee(s) applicable to the upcoming option year. This written request must be received by the Contracting Officer within 30 days after the indexes used to calculate the adjusting index are available. The request may be generic or may include the specific calculations required by this clause to determine the revised management fee(s). When making the calculations, the 10% ceiling (paragraph (h) below) shall be taken into consideration. The Contractor has the option of proposing a management fee based upon these calculations or a lower management fee(s).

(ii) If the “adjusting” index is lower than the “base” index, a decrease in the management fee(s) is mandated by this clause. As above, the Contractor shall notify the Contracting Officer in writing of this decrease. This notification must be received by the Contracting Officer within 30 days after the indexes used to calculate the adjusting index are available. The notification may be generic or may include the specific calculations required by this clause to determine the revised management fee(s). The Contractor has the option of proposing the inventory management fee(s) based upon these calculations or a lower management fee(s).

(2) Upon receipt of a request for an upward adjustment or notification of a downward adjustment by the Contractor, the Contracting Officer shall review and validate the Contractor’s submittal. If acceptable, the Contracting Officer will calculate the management fees, if necessary, and the management cost(s) for the upcoming option year in accordance with paragraph (c) (4) above. If no increase is requested and a mandated decrease is not warranted, the Contracting Officer shall use the current management fee(s) to calculate the management cost(s) applicable to the upcoming option year. In either case, the management fee(s), management cost(s), and the total inventory value reserved for this contract for the upcoming option year shall be included in a contract modification.

If a request for an upward adjustment is received after the required 30-day timeframe, the Contracting Officer reserves the right to reject the request, as money may not available to fund the increase. If funds are available, the Contracting Officer shall have 30 days from the date the Contractor’s request is received to review the request, make the required calculations and issue an adjustment modification. The upward adjustment shall take effect on the same day the modification takes effect. If a notification of a downward adjustment is not submitted until after the required 30-day timeframe or the Contractor fails to notify the Contracting Officer of a decrease, the Contracting Officer shall unilaterally make the required adjustments in accordance with this clause. The effective date of the downward adjustment shall be retroactive to the date the new option year takes effect.

(e) Determining the "base" and "adjusting" indexes.

(1) First option year:

(i) The base index shall be the arithmetic average of the revised indexes published for the month before and the month of the closing of the final proposal revisions.

(ii) The adjusting index shall be the arithmetic average of the preliminary indexes published for the third and fourth month prior to the month the base period expires (e.g., if the base period expires in June, the adjusting index would be the average of the indexes published for February and March of the base period.)

(2) Subsequent option years:

(i) The base index for any upcoming option year shall be the previously established adjusting index (e.g., the base index for the upcoming 2nd option year shall be the adjusting index established for the first option year. Note: If no adjustment was made for option year 1, determine the adjusting index for that year anyway in order to establish the base index for upcoming 2nd option year. This applies to any time an adjustment is not made for a given year.)

(ii) The adjusting index for any upcoming option year shall be the arithmetic average of the preliminary indexes published for the third and fourth months prior to the month the current option year expires (e.g., if the first option year expires in June, the adjusting index for the upcoming second option year would be the average of the indexes published for February and March of the first option year.)

(f) Following is a hypothetical example of adjustment calculations to determine the inventory management fee for option year III, and the associated inventory management costs (the base and adjusting indexes, the inventory management fee for option year II, and the CIM and CFM inventory values for option year III are hypothetical and are used only to illustrate how the inventory management fee and inventory management costs are calculated. Any management fee(s) and management cost(s) that may apply would be calculated in the same manner.):

(1) Base index: 102.05 Adjusting index: 103.75

(2) Inventory management fee for option year II: 1.50%

(3) Inventory value for guaranteed coverage (CIM and CFM) for option year III. (There are only 2 categories of guaranteed coverage for this hypothetical example.):

CIM: $405,000 CFM: $300,000

(4) Calculate the inventory management fee:

(i) Establish base index (use previously established adjusting index for the option year II which is the average of the preliminary indexes published for 3rd and 4th month prior to the month option year I expires. For example, if option year I expires in June, the base index for option year III would be the average of the preliminary indexes for February and March of option year I.)

Feb Index: 101.10 Mar Index: 103.00 Base Index (Average of Feb and Mar): 102.05

(ii) Establish Adjusting Index (average of preliminary indexes published for February and March of 2nd Option Year.)

Feb Index: 102.30 Mar Index: 105.20 Adjusting Index (Average of Feb and Mar): 103.75

Adjusting Index: 103.75

Less Base Index: -102.05

---------

Increase to index 1.70

Divide increase to index 1.70/102.05 = 0.016659 = Adjustment Factor (1.6659 %)

by Base Index

Inv. Man. Fee for Yr II x Adjustment Factor plus 1 = Inv. Man. Fee for Option

Option Year III 1.50% x 1.016659 = 1.52%

Ceiling provision:

Max Fee for Option Year III cannot exceed 10% increase of Op Yr II fee Max Fee = 1.10 (ceiling) x .0150 (Inv Man Fee for Op Yr II expressed as a decimal ) = .0165 (1.65%) (Maximum allowable fee 1.65%) 1.52% adjusted fee is less than 1.65% maximum fee, therefore 1.52% is new fee

(5) Contracting Officer to calculate the following:

CIM Inventory Value for OP YR III: $405,000.00

Multiplied by 1.52% (converted to a decimal value) x .0152

---------------

CIM Inventory Management Cost for OP YR III $6,156.00

CFM Inventory Value for OP YR III: $300,000.00

Multiplied by 1.52% (converted to a decimal value) x .0152

---------------

CFM Inventory Management Cost for OP YR III $4,560.00

CIM Inventory Management Cost for OP YR III: $6,156.00

CFM Inventory Management Cost for OP YR III + $4,560.00

--------------

Inventory Management Cost for OP YR III $10,716.00

(Total Inventory Value is $705,000, i.e., CIM Inventory Value plus CFM Inventory Value)

Note: Round all computations involving the PPIs to two decimal places.

Round adjustment factor to six decimal places.

Round inventory management fees to two decimal places when expressed as a percentage and four decimal places when expressed as a decimal.

Round all dollar figures to nearest cent.

(g) The adjusting contract modification will show all the calculations used to establish the management fee(s), management cost(s) and total inventory value covering the new option year.

(h) Any request to increase the management fee(s) in accordance with the requirements of this clause for any upcoming option year shall be limited to 10% of the same management fee(s) for the previous contract year. If the management fee(s) increase exceeds 10% of the management fee(s) for the previous contract year, and the Contractor has requested an increase of 10% or more, the Contractor shall be limited to the 10% increase. There is no percentage limit on any decreases in the management fee(s) under this clause. Contractors can also propose lower management fee(s) than those calculated in accordance with the requirements of this clause.

(i) The Contractor shall include a statement on the final invoice for each contract year/period that amounts invoiced under this contract reflect all decreases required by this clause.

(j) Payment on this contract shall be at the current management fee(s) and management cost(s) pending the issuance of the modification establishing the management fee(s), management cost(s), and total inventory value for the applicable option year. The management fee(s) and management cost(s) will, if necessary, be retroactively adjusted if the applicable price adjustment is delayed by the Government. In this case, any retroactive adjustment shall cover performance only from when the adjustment should have taken effect but for the delay caused by the Government through the day that the EPA modification takes effect.

(k) In the event that the publication of the economic indicator is discontinued, its method of derivation is altered substantially, or the Contracting Officer determines that the index consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate substitute method or adjustment mechanism to determine the management fee(s) and/or management cost(s). The contract shall be modified to specify the use of an appropriate substitute, which will be effective on the date the Index is no longer published, the derivation of the index is substantially altered, or the Index begins to consistently and substantially fail to reflect marked conditions.

(l) Any pricing actions pursuant to Federal Acquisition Regulation (FAR) clause 52.212-4, paragraph (c) entitled "Changes" (including any revisions by addendum thereto) or other provisions of the Contract shall be priced as though there were no provisions for economic price adjustment.

(m) No adjustment shall be made under this EPA clause unless the total change in contract amount exceeds $500.00.

(End of Clause)

52.216-9050 Economic Price Adjustment (EPA) of the Annual Inventory Holding Fee and Annual Inventory Holding Cost for the Option Years.

As prescribed in 16.203-4(d)(2)(92), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) OF THE ANNUAL INVENTORY HOLDING FEE AND ANNUAL INVENTORY HOLDING COST FOR THE OPTION YEARS (NOV 2011)

(a) The Contractor warrants that the prices/costs and fees included in the Solicitation/Contract do not include allowances for any portion of the contingency covered by this clause. Adjustments under this clause are predicated upon the Government exercising one or more option year extensions. The Government, at its discretion may choose to exercise or not exercise an option to extend the Contract.

(b) The economic indicator, for the purpose of calculating the inventory holding fee (expressed as a percentage) and inventory holding cost for each option year under this clause, shall be the prime rate, as published Monday through Friday in the Wall Street Journal.

(c) This clause authorizes only one calculation annually (see paragraph d) to determine the inventory holding fee and inventory holding cost applicable to the upcoming option year. (The inventory holding fee and inventory holding cost for the base contract period are not subject to adjustment under this clause.) This calculation is as follows:

(1) A "base" and "adjusting" prime rate shall be established for each option year (see paragraph (e) below).

(2) Determine the change in points (upward or downward) between the Base Prime Rate and Adjusting Prime Rate for the twelve-month period* which ends 60 days prior to the upcoming option year for which the new inventory holding fee and inventory holding cost will be calculated. (*Note: The period for the adjustment for option year I may be longer or shorter than twelve months.)

(3)(i) Increases. The actual change in points up to the maximum allowed in accordance with paragraph (h) shall be added to the Inventory Holding Fee for the contract year/period about to expire to determine the inventory holding fee for the upcoming option year. Upward adjustments shall not exceed 1.50 points.

(ii) Decreases. The actual change in points shall be subtracted from the inventory holding fee for the contract year/period about to expire to determine the inventory holding fee for the upcoming option year.

(iii) For increases or decreases, Contractors may offer lower inventory holding fees than those calculated in accordance with the above.

(4) To determine the inventory holding cost for the upcoming option year, the Contracting Officer will apply the new inventory holding fee to the value of contractor furnished material inventory reserved for this contract (hereafter referred to as the CFM inventory) for the upcoming option year (i.e., the value of the CFM inventory for the upcoming option year x new inventory holding fee expressed as a decimal to four decimal places = new inventory holding cost for the upcoming option year). The Contracting Officer will update the value of the CFM inventory for each contract year by applying the current DAPA, FSS, ECAT, or DoD national contract prices (whichever is lower) to the CFM inventory coverage for the upcoming contract year. For payment purposes, the inventory holding cost for the upcoming option year may be paid on a monthly, quarterly, or some other basis at the discretion of the Contracting Officer.

(d)(1) Adjustment requests and notifications:

(i) If the adjusting prime rate is higher than the base prime rate, the Contractor may request an increase in accordance with the terms of this clause in the inventory holding fee applicable to the upcoming option year. This written request must be received by the Contracting Officer within 30 days after the adjusting prime rate is published and may be generic or may include the specific calculations required by this clause to determine the revised inventory holding fee. The ceiling provision (paragraph (h) below) must also be considered when making the calculations. The Contractor has the option of proposing an inventory holding fee based upon these calculations or a lower inventory holding fee.

(ii) If the adjusting prime rate is lower than the base prime rate, a decrease in the inventory holding fee is mandated by this clause. Accordingly, the Contractor shall notify the Contracting Officer in writing of this decrease. This notification must be received by the Contracting Officer within 30 days after the adjusting prime rate is published and may be generic or may include the specific calculations required by this clause to determine the revised inventory holding fee. The Contractor has the option of proposing the inventory holding fee based upon these calculations or a lower inventory holding fee.

(2) Upon receipt of a request for an upward adjustment or notification of a downward adjustment by the Contractor, the Contracting Officer shall review and validate the Contractor's submittal. If acceptable, the Contracting Officer will calculate the inventory holding fee, if necessary, and the inventory holding cost for the upcoming option year in accordance with paragraph (c)(4) above. If no increase is requested and a mandated decrease is not warranted, the Contracting Officer shall use the current inventory holding fee to calculate the inventory holding cost for the upcoming option year. In either case, the inventory holding fee, inventory holding cost, and the value of the CFM inventory for the upcoming option year shall be included in a contract modification.

(3) If a request for an upward adjustment is received after the required 30-day timeframe, the Contracting Officer reserves the right to reject the request, as money may not available to fund the increase. If funds are available, the Contracting Officer shall have 30 days from the date the Contractor's request is received to review and validate the request, make the required calculations and issue an adjustment modification. The upward adjustment shall take effect on the same day the modification takes effect. If a notification of a downward adjustment is not submitted until after the required 30-day timeframe or the Contractor fails to notify the Contracting Officer of a decrease, the Contracting Officer shall unilaterally make the required adjustments in accordance with this clause. The effective date of the downward adjustment shall be retroactive to the date the new option year takes effect.

(e) Determining the "base" and "adjusting" indexes.

(1) The base prime rate used to calculate the inventory holding fee and inventory holding cost covering option year I under this clause shall be the prime rate, as published on the date of closing of the final proposal revision. The base prime rate used to calculate the inventory holding fee and inventory holding cost for each subsequent option year shall be the prime rate, as published 60 days prior to the effective date of each previous option year (e.g., the base prime rate for option year III will be the prime rate published 60 days prior to the effective date of option year II.)

(2) The adjusting prime rate used to calculate the inventory holding fee and inventory holding cost for each option year shall be the prime rate, as published 60 days prior to the effective date of each option year (e.g., the adjusting prime rate for option year III will be the prime rate published 60 days prior to the effective date of option year III).

(f) Following is a hypothetical example of adjustment calculations to determine the inventory holding fee for option year III and the associated inventory holding cost. (The base and adjusting prime rates, the inventory holding fee for option year II and the value of the CFM inventory for option year III are hypothetical and are used only to illustrate how the inventory holding fee and inventory holding cost are calculated):

(1) Base prime rate (in effect 60 days prior to effective date of option year II): 4.00

(2) Adjusting prime rate (in effect 60 days prior to effective date of option year III): 5.75

(3) Current contract inventory holding fee for option year II: 3.75

(4) Calculate the inventory holding fee:

Adjusting Prime Rate: 5.75

Base Prime Rate: -4.00

------

Change in (Prime Rate) Points: (-Increase-) 1.75

Maximum increase allowed is 1.50 points: Clause ceiling of 1.50 is less than 1.75 calculated; therefore the allowable increase is 1.50 points.

Inventory Holding Fee for Option Year II: 3.75

Maximum Increase in Prime Rate Allowed: + 1.50

-----

Inventory Holding Fee for Option Year III: 5.25

(5) Contracting Officer to calculate the Inventory Holding Cost:

Value of CFM Inventory as adjusted for Option Year III: $20,000,000.00

$20,000,000.00 x .0525 = $1,050,000 (Annual Inventory Holding Cost for Option Year III)

(g) The adjusting contract modification will show all the calculations used to establish the inventory holding fee, inventory holding cost, and the value of the CFM inventory covering the new option year.

(h) Any request to increase the Inventory Holding Fee in accordance with the requirements of this clause for any upcoming option year shall be limited to the point increase (in increments of 0.25) in the prime rate, up to, but not exceeding 1.50 points. This will be determined when calculating the change in points in the prime rate using the base and adjusting prime rates described in paragraph (c)(2) and (c)(3)(i) and illustrated in paragraph (f). If the prime rate increase exceeds 1.50 points and the Contractor has requested an increase of 1.50 points or more, the Contractor shall be given the 1.50 point increase. There are no limitations on downward adjustments under this clause. Contractors can also propose lower inventory holding fees than those calculated in accordance with the requirements of this clause.

(i) The Contractor shall include a statement on the final invoice for each contract year/period that amounts invoiced under this contract reflect all decreases required by this clause.

(j) Payment on this contract shall be at the current inventory holding fee and inventory holding cost pending the issuance of the modification establishing the new inventory holding fee, inventory holding cost, and value of the CFM inventory for the applicable option year. The inventory holding fee and inventory holding cost will, if necessary, be retroactively adjusted if the applicable price adjustment is delayed by the Government. In this case, any retroactive adjustment shall cover performance only from when the adjustment should have taken effect but for the delay caused by the Government through the day that the EPA modification takes effect.

(k) In the event that the prime rate is discontinued, its method of derivation is altered substantially, or the Contracting Officer determines that the prime rate consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate substitute method or adjustment mechanism to determine the annual inventory holding fee and/or inventory holding cost. The Contract shall be modified to specify the use of an appropriate substitute, which will be effective on the date the prime rate is no longer published, the derivation of the prime rate is substantially altered, or the prime rate begins to consistently and substantially fail to reflect market conditions. If the base or adjusting prime rates established in paragraph (e) above fall on a day the prime rate is not published, use the next day the prime rate is published.

(l) Any pricing actions pursuant to Federal Acquisition Regulation (FAR) clause 52.212-4, paragraph (c) entitled "Changes" (including any revisions by addendum thereto) or other provisions of the Contract shall be priced as though there were no provisions for economic price adjustment.

(m) No adjustment shall be made under this EPA clause unless the total change in contract amount exceeds $500.00.

(End of Clause)

52.216-9051 Economic Price Adjustment – Federal Ceiling Prices – One Adjustment Per Year.

As prescribed in 16.203-4(d)(2)(93), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – FEDERAL CEILING PRICES – ONE ADJUSTMENT PER YEAR (NOV 2011)

(a) All price adjustments authorized or mandated by this clause are based upon changes in the Federal ceiling price or Federal Supply Schedule (FSS) Price for each item. The clause also provides for voluntary price reductions (VPR) in the form of “specials” or “discounts”. The Government reserves the right not to exercise an Option.

(b) The offeror/Contractor warrants that any contract unit prices determined using the Federal ceiling price or FSS Price do not include allowances for any portion of the contingency covered by this clause.

(c) Prior to award, the Contractor must furnish a copy of the current Federal ceiling price, FSS Price, the Veteran Administration (VA) approval of those prices, and any other information required by the Contracting Officer. During the life of the contract, any changes to the Federal ceiling price and the FSS Price, as well as the VA’s approval of those price changes and any other information required by the Contracting Officer, must be furnished in writing not later than 15 workdays after the effective dates of those price changes.

(d) Award unit prices shall not exceed the current federal ceiling price as well as any current FSS price in effect for the same item.

(e) Downward Adjustments.

(1) During the base year of the contract, downward adjustments to contract unit prices are mandated whenever there are decreases in the Federal ceiling price and/or whenever a reduction to the FSS price results in a revised FSS price which is now lower than the current contract unit price. During the Option years of the contract, downward adjustments to contract unit prices are mandated whenever reductions to the Federal ceiling price and/or the FSS price results in a revised Federal ceiling price and/or FSS price that is lower than the current contract unit price.

The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in the Federal ceiling price and/or FSS price. The Contractor shall propose a lower contract unit price taking into consideration the benchmarks in paragraphs (e)(2) and (3) below. The Contractor must furnish a copy of the revised Federal ceiling price and/or FSS price within 15 workdays after it takes effect.

If the decrease is based upon a lower Federal ceiling price (FCP), the Contractor shall furnish the information in (i)-(viii) below. If the decrease is based upon a lower FSS Price, the Contractor shall furnish the information in (i), (iii), (v), (vi), (viii), and (ix) below.

(i) FCP/FSS: The item number; e.g., 0002.

(ii) FCP: The previous Federal ceiling price.

(iii) FCP/FSS: The Federal ceiling price now in effect.

(iv) FCP: The percentage change in Federal ceiling price from the previous Federal ceiling price to the new, lower Federal ceiling price.

(v) FCP/FSS: The current Contract Unit Price.

(vi) FCP/FSS: The reduced Contract Unit Price now offered.

(vii) FCP: The percentage decrease from the current Contract Unit Price to the new lower Contract Unit Price.

(viii) FCP/FSS: For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS price(s) for the same item.

(ix) FSS: For any items offered to the DVA under the FSS, the previous FSS price(s) for the same item.

(2) Federal ceiling price reduction. If the offered price decrease is based upon a reduction in the Federal ceiling price, the proposed lower contract unit price shall not exceed the lower of the following two benchmarks:

(i) For the base contract year adjustment, the offered reduction in contract unit price on a percentage basis must be at least equal to the percentage reduction from the previous Federal ceiling price under the contract to the new lower Federal ceiling price; i.e., the current contract unit price, must, as a minimum, be reduced by the percentage decrease in Federal ceiling price. For each option year adjustment, the new proposed lower contract unit price shall not exceed the new Federal ceiling price.

(ii) The new proposed lower contract unit price shall not exceed the current FSS price for the same item.

(3) FSS price reduction. If the offered price decrease is based upon a reduction in the FSS Price, the proposed lower contract unit price shall not exceed the lower of the following two benchmarks:

(i) The new proposed lower contract unit price shall not exceed the revised lower FSS Price for the same item.

(ii) The new proposed lower contract unit price shall not exceed the current Federal ceiling price.

(4) If the proposed contract unit price exceeds the lower of the appropriate Federal Ceiling Price benchmarks (for reductions based upon a reduced Federal Ceiling Price) or FSS Price benchmarks (for reductions based upon a reduced FSS Price), the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the appropriate benchmarks. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s).) If the proposed Contract Unit Price does not exceed the lower of the appropriate Federal Ceiling Price or FSS Price benchmarks, it will be determined fair and reasonable.

Upon approval of the proposed price decrease, the Government shall modify the contract to include the reduced Contract Unit Price which, will take effect on the same day that the reduced Federal Ceiling Price or FSS Price takes effect, as appropriate. The modification will also show the current Federal Ceiling Price and FSS Price. The adjusted Contract Unit Price shall apply to those items ordered on or after the new Federal Ceiling Price or FSS Price takes effect, as appropriate. Any delivery orders issued after the reduced Federal Ceiling Price or FSS Price takes effect but before the Contracting Officer modifies the contract to incorporate the reduced Contract Unit Price, will be retroactively reduced to the new lower Contract Unit Price (see paragraph (i)).

If the Contractor fails to notify the Contracting Officer of any Federal Ceiling Price or FSS Price decreases within the timeframe and in the manner stated above, or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the effective date of the decrease in the Federal Ceiling Price or FSS Price, as appropriate.

(f) Upward adjustments.

(1) The Contractor is authorized to submit one request for upward adjustment to the Contract Unit Price each Contract Year (i.e. one adjustment during the Base Year and one adjustment during each Option Year, if the option is exercised by the Government). The request for upward price adjustment must be based upon increases in the Federal Ceiling Price and shall be submitted no later than 15 workdays after the effective date of the new Federal Ceiling Price. The Contractor shall propose a Contract Unit Price taking into consideration the benchmarks in paragraph (f)(2). The request shall be in writing and include the following:

(i) The item number; e.g., 0002.

(ii) The previous Federal ceiling price.

(iii) The increased Federal Ceiling Price now in effect.

(iv) The percentage change from the previous Federal Ceiling Price to the new, higher Federal Ceiling Price.

(v) The current contract unit price in effect.

(vi) The increased Contract Unit Price now proposed.

(vii) The percentage change from the current Contract Unit Price in effect to the new proposed higher Contract Unit Price.

(viii) For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS price(s) for the same item.

(ix) For any items offered to the DVA under the FSS, the previous FSS price(s) for the same item.

(x) Any other information required by the Contracting Officer.

(2) Upon receipt of the request for a Contract Unit Price increase based upon an increase in the Federal Ceiling Price, the Contracting Officer shall review the information the Contractor is required to submit and verify that the proposed increase is fair and reasonable. The proposed increase will be considered fair and reasonable if it does not exceed whichever is the lower of the following two benchmarks:

(i) For the Base Contract Year adjustment, the proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the previous Federal Ceiling Price to the new higher Federal Ceiling Price; i.e., the proposed Contract Unit Price cannot exceed the current Contract Unit Price plus the percentage increase in the Federal Ceiling Price. For each Option Year adjustment, the new proposed higher Contract Unit Price shall not exceed the new Federal Ceiling Price.

(ii) The proposed higher Contract Unit Price shall not exceed the current FSS Price for the same item.

(3) If the proposed higher Contract Unit Price exceeds the lower of the two benchmarks, the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the lower of the two benchmarks. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s)).

If the proposed increased Contract Unit Price does not exceed the lower of the two benchmarks, it will be determined fair and reasonable. Upon approval of the proposed price increases, the Government shall modify the contract to include the increased Contract Unit Price(s). The modification will also show the current Federal Ceiling Price and FSS Price. If the request for price increase is submitted within the required 15-day timeframe (see (f)(1)), the effective date of the increased Contract Unit Price will be on the same day the new Federal Ceiling Price takes effect and this increase shall apply to all orders issued thereafter.

Accordingly, any delivery orders issued after the increased Federal Ceiling Price takes effect but before the Contracting Officer modifies the contract to incorporate the increased Contract Unit Price(s), will be retroactively increased to the new higher Contract Unit Price (see paragraph (i)). If the request for increase is not received within the 15-day timeframe, the Contracting Officer reserves the right not to retroactively adjust any orders issued before an adjusting modification is issued. In this case, the effective date of the increase will be on the same day the adjusting modification takes effect.

(g) If the Contracting Officer at any time has any reason to believe that the Federal Ceiling Price or FSS price has been discontinued, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that a substitute for determining price adjustments is needed, the parties shall promptly agree upon an appropriate substitute method for determining adjustments. The Contract shall be modified to incorporate the substitute and its effective date.

(h) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(i) Pending the issuance of an adjusting modification revising the Contract Unit Price, payment shall be made at the contract unit prices in effect at the time of order.

(j) Any increased Federal Ceiling Price shall not be used to compute contract unit prices for Delivery Orders issued before the date the increased Federal Ceiling Price takes effect.

(k)(1) Voluntary Price Reductions (VPR): A "special or discount" offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, which items are included, and the length of time the VPR will remain in effect. Once the "special or discount" period expires, prices will revert to the Contract Unit Price(s) in effect at that time.

(2) If the Ceiling Price (or FSS Unit Price) decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a Contract Unit Price increase based upon an increased Federal Ceiling Price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause as if no VPR had been in effect.

(End of Clause)

52.216-9052 Economic Price Adjustment – Federal Ceiling Prices – One Adjustment Per Year.

As prescribed in 16.203-4(d)(2)(94), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – FEDERAL CEILING PRICES – ONE ADJUSTMENT PER YEAR (NOV 2011)

(a) All price adjustments authorized or mandated by this clause are based upon changes in the Federal Ceiling Price or Federal Supply Schedule (FSS) Price for each item. The clause also provides for voluntary price reductions (VPR) in the form of “specials” or “discounts”. The Government reserves the right not to exercise an option.

(b) The offeror/Contractor warrants that any contract unit prices determined using the Federal Ceiling Price or FSS Price do not include allowances for any portion of the contingency covered by this clause.

(c) Prior to award, the Contractor must furnish a copy of the current Federal Ceiling Price, FSS Price, the Department of Veteran Affairs (VA) approval of those prices, and any other information required by the Contracting Officer. During the life of the contract, any changes to the Federal Ceiling Price and the FSS Price, as well as the VA’s approval of those price changes and any other information required by the Contracting Officer, must be furnished in writing not later than 15 workdays after the effective dates of those price changes.

(d) Award unit prices shall not exceed the current Federal ceiling price as well as any current FSS price in effect for the same item.

(e) Downward adjustments.

(1) Downward adjustments to contract unit prices are mandated whenever there are decreases in the Federal Ceiling Price and/or whenever a reduction to the FSS Price results in a revised FSS Price which is now lower than the current Contract Unit Price. The Contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in the Federal Ceiling Price and/or FSS Price. The Contractor shall propose a lower Contract Unit Price taking into consideration the benchmarks in paragraphs (e)(2) and (3) below. The Contractor must furnish a copy of the revised Federal Ceiling Price and/or FSS Price within 15 workdays after it takes effect. If the decrease is based upon a lower Federal Ceiling Price (FCP), the Contractor shall furnish the information in (i)-(viii) below. If the decrease is based upon a lower FSS Price, the Contractor shall furnish the information in (i), (iii), (v), (vi), (viii), and (ix) below.

(i) FCP/FSS: The item number; e.g., 0002.

(ii) FCP: The previous Federal Ceiling Price.

(iii) FCP/FSS: The Federal Ceiling Price now in effect.

(iv) FCP: The percentage change in Federal Ceiling Price from the previous Federal Ceiling Price to the new, lower Federal Ceiling Price.

(v) FCP/FSS: The current Contract Unit Price.

(vi) FCP/FSS: The reduced Contract Unit Price now offered.

(vii) FCP: The percentage decrease from the current Contract Unit Price to the new lower Contract Unit Price.

(viii) FCP/FSS: For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS price(s) for the same item.

(ix) FSS: For any items offered to the DVA under the FSS, the previous FSS price(s) for the same item.

(2) Federal Ceiling Price Reduction. If the offered price decrease is based upon a reduction in the Federal Ceiling Price, the proposed lower Contract Unit Price shall not exceed the lower of the following two benchmarks:

(i) The offered reduction in Contract Unit Price on a percentage basis must be at least equal to the percentage reduction from the previous Federal Ceiling Price under the contract to the new lower Federal Ceiling Price; i.e., the current Contract Unit Price, must, as a minimum, be reduced by the percentage decrease in Federal Ceiling Price.

(ii) The new proposed lower Contract Unit Price shall not exceed the current FSS Price for the same item.

(3) FSS Price Reduction. If the offered price decrease is based upon a reduction in the FSS Price, the proposed lower Contract Unit Price shall not exceed the lower of the following two benchmarks:

(i) The new proposed lower Contract Unit Price shall not exceed the revised lower FSS Price for the same item.

(ii) The new proposed lower Contract Unit Price shall not exceed the current Federal Ceiling Price.

(4) If the proposed Contract Unit Price exceeds the lower of the appropriate Federal Ceiling Price benchmarks (for reductions based upon a reduced Federal Ceiling Price)or FSS Price benchmarks (for reductions based upon a reduced FSS Price), the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the appropriate benchmarks. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s).) If the proposed Contract Unit Price does not exceed the lower of the appropriate Federal Ceiling Price or FSS Price benchmarks, it will be determined fair and reasonable.

Upon approval of the proposed price decrease, the Government shall modify the contract to include the reduced Contract Unit Price which, will take effect on the same day that the reduced Federal Ceiling Price or FSS Price takes effect, as appropriate. The modification will also show the current Federal Ceiling Price and FSS Price. The adjusted Contract Unit Price shall apply to those items ordered on or after the new Federal Ceiling Price or FSS Price takes effect, as appropriate. Any delivery orders issued after the reduced Federal Ceiling Price or FSS Price takes effect but before the Contracting Officer modifies the contract to incorporate the reduced Contract Unit Price, will be retroactively reduced to the new lower Contract Unit Price (see paragraph I).

If the Contractor fails to notify the Contracting Officer of any Federal Ceiling Price or FSS Price decreases within the timeframe and in the manner stated above, or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the effective date of the decrease in the Federal Ceiling Price or FSS Price, as appropriate.

(f) Upward Adjustments.

(1) The Contractor is authorized to submit one request for upward adjustment to the Contract Unit Price each Contract Year (i.e. one adjustment during the Base Year and one adjustment during each Option Year, if the option is exercised by the Government). The request for upward price adjustment must be based upon increases in the Federal Ceiling Price and shall be submitted no later than 15 workdays after the effective date of the new Federal Ceiling Price. The Contractor shall propose a Contract Unit Price taking into consideration the benchmarks in paragraph (f)(2). The request shall be in writing and include the following:

(i) The item number; e.g., 0002.

(ii) The previous Federal Ceiling Price.

(iii) The increased Federal Ceiling Price now in effect.

(iv) The percentage changed from the previous Federal Ceiling Price to the new, higher, Federal Ceiling Price.

(v) The current Contract Unit Price in effect.

(vi) The increased Contract Unit Price now proposed.

(vii) The percentage change from the current Contract Unit Price in effect to the new, proposed, higher Contract Unit Price.

(viii) For any items offered to the Department of Veterans Affairs (DVA) under the FSS, the current FSS price(s) for the same item.

(ix) For any items offered to the DVA under the FSS, the previous FSS price(s) for the same item.

(x) Any other information required by the Contracting Officer.

(2) Upon receipt of the request for a Contract Unit Price increase based upon an increase in the Federal Ceiling Price, the Contracting Officer shall review the information the Contractor is required to submit and verify that the proposed increase is fair and reasonable. The proposed increase will be considered fair and reasonable if it does not exceed whichever is the lower of the following two benchmarks:

(i) The proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the previous Federal Ceiling Price to the new, higher, Federal Ceiling Price, i.e., the proposed Contract Unit Price cannot exceed the current Contract Unit Price plus the percentage increase in the Federal Ceiling Price.

(ii) The proposed higher Contract Unit Price shall not exceed the current FSS Price for the same item.

(3) If the proposed higher Contract Unit Price exceeds the lower of the two benchmarks, the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the lower of the two benchmarks. (All negotiated price reductions shall be confirmed in writing and will include the agreed-to price(s)). If the proposed increased Contract Unit Price does not exceed the lower of the two benchmarks, it will be determined fair and reasonable.

Upon approval of the proposed price increases, the Government shall modify the contract to include the increased Contract Unit Price(s). The modification will also show the current Federal Ceiling Price and FSS Price. If the request for price increase is submitted within the required 15-day timeframe (see (f)(1)), the effective date of the increased Contract Unit Price will be on the same day the new Federal Ceiling Price takes effect and this increase shall apply to all orders issued thereafter.

Accordingly, any delivery orders issued after the new Federal Ceiling Price takes effect but before the Contracting Officer modifies the contract to incorporate the increased Contract Unit Price(s), will be retroactively increased to the new higher Contract Unit Price (see paragraph (i)).

If the request for increase is not received within the 15-day timeframe, the Contracting Officer reserves the right not to retroactively adjust any orders issued before an adjusting modification is issued. In this case, the effective date of the increase will be on the same day the adjusting modification takes effect.

(g) If the Contracting Officer at any time has any reason to believe that the Federal Ceiling Price or FSS price has been discontinued, the Contractor shall furnish relevant information as required by the Contracting Officer. If the Contracting Officer determines that a substitute for determining price adjustments is needed, the parties shall promptly agree upon an appropriate substitute method for determining adjustments. The Contract shall be modified to incorporate the substitute and its effective date.

(h) Pricing actions pursuant to paragraph (c) entitled “Changes” of Federal Acquisition Regulation (FAR) clause 52.212-4 (including any revisions by addendum thereto) or any other provision of this Contract will be priced as though there were no provisions for Economic Price Adjustment.

(i) Pending the issuance of an adjusting modification revising the Contract Unit Price, payment shall be made at the contract unit prices in effect at the time of order.

(j) Any increased Federal Ceiling Price shall not be used to compute contract unit prices for Delivery Orders issued before the date the increased Federal Ceiling Price takes effect.

(k)(1) Voluntary Price Reductions (VPR): A "special or discount" offered by the Contractor which results in a voluntary price reduction for an item or group of items for a given period of time. The Contractor may offer a VPR at any time. The price reductions resulting from these VPRs will be in addition to any price reductions mandated by this EPA clause. The Contractor shall notify the Contracting Officer when the VPR takes effect, which items are included, and the length of time the VPR will remain in effect. Once the "special or discount" period expires, prices will revert to the Contract Unit Price(s) in effect at that time.

(2) If the Ceiling Price (or FSS Unit Price) decreases when a VPR is in effect, the VPR will remain in effect until it expires if it is lower than the proposed unit price decrease. If the Contractor requests a Contract Unit Price increase based upon an increased Federal Ceiling Price when a VPR is in effect, the VPR shall remain in effect until it expires. Upon expiration of the VPR, prices will revert to the adjusted contract unit prices, as calculated in accordance with this clause as if no VPR had been in effect.

(End of Clause)

52.216-9053 Economic Price Adjustment (EPA) - Established Market Price – Dehydrated Orange Juice.

As prescribed in 16.203-1(a)(90), 16.203-4-90, and FAR 16.203-1(a)(1), insert the following:

ECONOMIC PRICE ADJUSTMENT (EPA) - ESTABLISHED MARKET PRICE – DEHYDRATED ORANGE JUICE (NOV 2011)

(a) Warranties. The Contractor warrants that the unit prices included in the Schedule does not include allowances for any portion of the contingency covered by this clause.

(b) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically based market price fluctuations for commodity groups or specific supplies. The established market price that shall be used for adjustments to contract prices under this clause shall be the price for Frozen Concentrated Orange Juice (FCOJ) as published daily by the New York Board of Trade (NYBoT) in the Daily Market Reports Futures.

(1) The base unit price for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the first three month’s Settle prices published daily within 30 calendar days for FCOJ as published by the NYBoT immediately preceding (i) the closing date for proposals, if no discussions are held, (ii) the due date for final proposal revisions, if discussions are held, or (iii) the opening date, if sealed bidding is used. Settle price as defined in financial dictionaries is an average of the trading prices in the futures market during the last few minutes of trading.

(2) The adjusting unit price shall be the arithmetic average of the of the first three month’s Settle Price published daily within 30 calendar days for FCOJ as published by the NYBoT immediately preceding the date the option is exercised.

(c) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit price(s). One adjustment calculation shall be made annually to determine the unit price(s) applicable to the forthcoming option term (if exercised).

(d) Allowance Factor. For the purpose of price adjustment pursuant to this clause, it shall be conclusively presumed that 1.14 pounds of Frozen Concentrated Orange Juice (FCOJ) solids is needed to produce one can of dehydrated orange juice. This allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance.

(e) Adjustments shall be calculated as follows:

Compute the Adjusting Unit Price and the Base Unit Price of each ingredient.

(Adjusting Unit Price – Base Unit Price)/Base Unit Price = Market Price Change (+ or -).

The adjusting unit price and base unit price are based on the three month arithmetic average published by the New York Board of Trade (NYBoT) for Frozen Concentrated Orange Juice (FCOJ) as discussed in paragraphs b(1) and b(2) of this clause.

Adjusting Unit Price – Base Unit Price = Change in Price (+ or -).

The percentage change in price equals the change in price divided by the base unit price i.e. (3022/9000 = 0.3358). This change in market prices is rounded to four decimal places to determine percentage (%) market price change.

(3) Percentage Market Price Change X Price for Allowance Factor = Contract Unit Price Adjustment (+ or -) (Round to two decimal places). This calculation is used to determine upward or downward increases for price adjustments to frozen concentrated orange juice unit prices for the option periods.

(4) The original option unit price(s) for each option will be the sum of the firm fixed price portion and the portion subject to the EPA (as discussed in section (e) above, the portion of the price subject to the EPA is the Allowance Factor). The adjusted unit price(s) for each option shall be determined by increasing or decreasing (as appropriate) the Allowance Factor by the Contract Unit Price Adjustment and adding that to the firm fixed price portion agreed to at the time of award for the option period being adjusted. Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit prices.

(5) The three month average of the base unit price based on published prices by the New York Board of Trade (NYBoT) for Frozen Concentrated Orange Juice (FCOJ) used in this example was 9000.

The following examples assume identical upward or downward adjustments in the price of FCOJ to illustrate the impact on contract unit prices. In the first example of an upward adjustment, the three month adjusting unit price average for Option Year 2 was 12,022. In the second example of a downward adjustment, the three month adjusting unit price was 5,978. The change in price is multiplied times the price for the allowance factor of $1.11 which results in either an upward or downward adjustment of $0.37 in the unit price.

In the actual contract modification the detailed calculation showing the daily prices, monthly average, and average prices for three months would be shown. The price adjustment would be applied to the actual quantities ordered by the Government per the terms of the contract. The minimum and maximum quantities shown below illustrate the potential price impact that would be seen in a contract modification for Option Year 2 depending on whether an upward or downward adjustment was applicable.

(f) Modification: Price adjustments made under this clause shall be effected by contract modification showing the change in contract unit price adjustment and the minimum and maximum price differential for the option year using the methodology shown below.

Calculation for Contract Unit Price Adjustment

 

Upward

Downward

 

Adjustment

Adjustment

Adjusting Unit Price (NYBoT)

12022

5978

Less: Base Unit Price (NYBoT)

9000

9000

Change in Price

3022

(3022)

% Market Price Change

0.3358

(0.3358)

Multiply by the Allowance Factor

$1.11

$1.11

Contract Unit Price Adjustment

$0.37

$(0.37)

Calculation for Upward Adjusted Unit Price for Option Year 2

               

Price

   
   

Original

   

Adjusted

   

Differential

   

Min.

Max.

Unit

Min.

Max.

Unit

Min.

Max.

Unit

Min.

Max.

Qty.

Qty.

Price

Amt.

Amt.

Price

Amt.

Amt.

Price

Amt.

Amt.

10,000

120,0000

$4.75

$47,500

$570,000

$5.12

$51,200

$614,400

$0.37

$3,700

$44,400

Calculation for Downward Adjusted Unit Price for Option Year 2

               

Price

   
   

Original

   

Adjusted

   

Differential

   

Min.

Max.

Unit

Min.

Max.

Unit

Min.

Max.

Unit

Min.

Max.

Qty.

Qty.

Price

Amt.

Amt.

Price

Amt.

Amt.

Price

Amt.

Amt.

10,000

120,0000

$4.75

$47,500

$570,000

$4.38

$43,800

$525,600

($0.37)

($3,700)

($44,400)

Legend: Min. = Minimum; Qty. = Quantity; Max. = Maximum; Amt. = Amount.

(g) Payments: Payment for an adjustment under this clause shall be at the current contract price until an adjustment modification has been effected. The Government shall pay the Contractor, upon the submission of proper invoices or vouchers, the unit price stipulated in the contract modification for the applicable option period. The Contractor also represents by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(h) Any pricing actions pursuant to the CHANGES clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(i) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(j) Upward ceiling on economic price adjustment: The aggregate of the increases in any contract unit price shall not exceed 10% per year of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(k) Revision of market price indicator: In the event that (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or; (ii) the Contracting Officer determines that the market price indicator consistently and substantially fails to reflect market conditions, -- the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions

(l) Disputes: If the parties fail to agree on an appropriate substitute market price indicator, or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the DISPUTES clause of the contract.

(m) Examination of records. The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(End of Clause)

52.216-9054 ECONOMIC PRICE ADJUSTMENT - POLYMERIC TRAYPACK RATION

The clause at 52.216-9054 may be used in solicitations and contracts for polymeric traypack rations. The Contracting Officer may add additional components based upon customer requirements within paragraph (b) of the clause. Prior to incorporation of any additional component(s) into a solicitation or contract, the Contracting Officer shall provide the requested new components along with supporting documentation to the cost/price office for review and approval. DLA Troop Support will keep track of any items added and/or those that should be deleted from the clause and report to DLA HQ, Attention: J73 every two years for review and updating of the clause as necessary.

As prescribed in FAR 16.203-1(a)(1), Defense Logistics Acquisition Directive (DLAD) 16.203-1(a)(90) and 16.203-4(90) insert the following clause:

ECONOMIC PRICE ADJUSTMENT - POLYMERIC TRAYPACK RATION (SEP 2015)

(a) Warranties. For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule do not include allowances for any portion of the contingency covered by this clause.

(b) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only (e.g. an average of beef indices for beef products, an average of poultry indices for poultry products, etc.) for the period specified under the “Adjusted (ADJ.) Unit Price” below immediately preceding either the solicitation closing date for proposals (if no discussions are held), the due date for final proposal revisions (if discussions are held) or the solicitation opening date (if sealed bidding is used).

TRAY PACK ITEM

EPA FACTOR

ECONOMIC

INDICATOR

PUBLICATION / PUBLISHER

PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

             

Beef, ground,

Creamed

Beef

Boneless process

Beef, trimmings,

Weighted Average, 85%, BPN U24

Weekly National Carlot Meat Report / USDA

Weekly

52 week period

52 week period

             

Turkey Cutlets

In gravy

Turkey

Breasts, B/S, TOM, National Young Turkey Parts & Bulk Meat, Weighted Average Price

USDA Turkey Market News Report (Monday Edition) / USDA

Weekly

52-week period

52 week period

             

Ham Slices

Potatoes w/cheese

& ham

Ham

Ham bone-in, trimmed, 23-27#m spec 1, BPN U62

Weekly National Carlot Meat Report USDA

Weekly

52-week period

52 week period

             

Pork diced in sweet & sour

Pork

Picnics, fresh,

Smkr trm,RS,

Combo, weighted average, BPN U50

Weekly National Carlot Meat Report / USDA

Weekly

52-week period

52 week period

             

Chili Macaroni w/beef, corn and beans

Beef

Boneless process

Beef, trimmings,

Weighted average 85%

BPN U24

Weekly National Carlot Meat Report / USDA

Weekly

52-week period

52 week period

             

Corned Beef hash

Beef

IMPS 167A, round, knuckle, trimmed, Weighted Average, BPNU12

Weekly National Carlot Meat Report / USDA

Weekly

52-week period

52 week period

             

Turkey Sausage Links

Turkey

Breasts, B/S, TOM, National Young Turkey Parts & Bulk Meat, Weighted Average Price

USDA Turkey Market News Report (Monday Edition) / USDA

Weekly

52-week period

52 week period

             

Meatballs in gravy

Beef

Boneless process

Beef, trimmings,

Weighted Average 85%, BPN U24

Weekly National Carlot Meat Report / USDA

Weekly

52-week period

52 week period

             

Spaghetti w/meatballs

Beef

Boneless process

Beef, trimmings,

Weighted Average 85%, BPN U24

Weekly National

Carlot Meat Report / USDA

Weekly

52-week period

52 week period

             

Chicken breasts In gravy

Chicken Breast

Breasts – B/S, Georgia FOB Dock Prices.

USDA Broiler Market News Report (Monday Edition) / USDA

Weekly

52-week period

52 week period

             

Chicken breast in lemon pepper sauce

Chicken Breast

Breasts – B/S, Georgia FOB Dock Prices.

USDA Broiler Market News Report (Monday Edition) / USDA

Weekly

52-week period

52 week period

             

Chicken, Buffalo Style in spicy sauce

Chicken

Heavy Type Hens, S.E. Heavy Live Hen Report, At Farm Buyer Loading, Weighted Average

USDA Broiler Market News Report (Monday Edition) / USDA

Weekly

52-week period

52 week period

             

Stuffing w/sausage

Pork

Picnics, fresh,

Smkr trm,RS,

Combo, Weighted Average, BPN U50

Weekly National Carlot Meat Report /USDA

Weekly

52-week period

52 week period

             

Pork sausage

Links

Pork

Picnics, fresh,

Smkr trm,RS, Weighted Average,

Combo, BPN U50

Weekly National Carlot Meat Report /USDA

Weekly

52-week period

52 week period

             

Pork ribs in BBQ Sauce

Pork

Picnic cushion

Meat, combo 92%, fresh or frozen,

BPN U50

Weekly National Carlot Meat Report /USDA

Weekly

52-week period

52 week period

             

Pork sausage in Cream gravy

Pork

Picnics, fresh,

Smkr trm,RS,

Combo, Weighted Average,

BPN U50

Weekly National Carlot Meat Report /USDA

Weekly

52-week period

52 week period

             

Pasta w/ground hot Italian sausage

Pork

Picnics, fresh,

Smkr trm,RS,

Combo, Weighted Average, BPN U50

Weekly National Carlot Meat Report /USDA

Weekly

52-week period

52 week period

             

Beef taco filling

Beef

IMPS 167A round knuckle, trimmed, Weighted Average, BPN U12

Weekly National Carlot Meat Report /USDA

Weekly

52-week period

52 week period

             

Blueberry dessert

Blueberries

Frozen, 30 lb f.o.b. Michigan

The Food Institute

Report Monthly Price Range / USDA

Monthly

12 month period

12 month period

             

Beef Burgundy

Beef

IMPS 167A round knuckle, trimmed, Weighted Average, BPN U12

Weekly National Carlot Meat Report /USDA

Weekly

52-week period

52 week period

             

Chicken in Szechwan Style Sauce

Chicken Breast

Breasts –B/S, Georgia FOB Dock Prices.

USDA Broiler Market News Report (Monday Edition) / USDA

Weekly

52-week period

52 week period

             

Polypro-pylene (PP) Resin

PP Resin

Polypropylene

Large Buyer

Contract Price

Chemical Data/ Monthly Petrochemical & Plastics Analysis

Monthly

12 month period

12 month period

             

Linerboard

Linerboard

Linerboard (42-lb) Unbleached kraft, East

PPI Pulp & Paper Week

Monthly

Semi-annual

Semi-annual

In addition to the components shown above, the following are also included:

TRAY PACK ITEM

EPA FACTOR

ECONOMIC

INDICATOR

PUBLICATION / PUBLISHER

PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

(To be completed as required)

(c) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the Adjusting Unit Price column shown in paragraph (b) immediately preceding the effective date the option term is exercised.

(d) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically based market price fluctuations for commodity groups or specific supplies. The established market price that shall be used for the EPA factors subject to price adjustments under this clause, and the economic indicators and publications to be used are listed in paragraph (b) of this clause.

(1) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the Base Unit Price column in paragraph (b) immediately preceding (i) the closing date for proposals, if no discussions are held, (ii) the due date for final proposal revisions, if discussions are held, or (iii) the opening date, if sealed bidding is used.

(2) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator for the period specified under the Adjusting Unit Price column in paragraph (b) immediately preceding the effective date the option term is exercised, except for linerboard which shall require one additional adjustment six months after each option term is exercised.

(e) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit prices. One adjustment calculation shall be made annually to determine the unit prices applicable to the forthcoming option term (if exercised), except linerboard which will be adjusted on a semi-annual basis.

(f) ALLOWANCE FACTOR: For the purpose of price adjustment pursuant to this clause, it shall be conclusively presumed that the amount shown under “Portion Subject to EPA” represents the cost of each item that is subject to adjustment. The portion subject to EPA refers to the element of cost for each item that is outside the control of the vendor and in “Schedule B” the offerors will be required to fill in this amount. This is the only portion of the cost that will be subject to the EPA provision. The EPA provisions based on changes in market prices for product material costs such as beef, turkey, ham, pork, chicken, and blueberries are subject to the EPA, because there is serious doubt concerning the stability of market conditions. The balance of product costs for items such as labor, overhead, General and Administrative (G&A), transportation, and profit, are those contingencies that can be included in the contract price and can be identified and covered separately through firm-fixed-price. This allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance.

(1) The United States Army Research, Development and Engineering Command (RDECOM) Natick Soldier Center (NSC) who prepares the specifications has moved from Military Specifications to Performance Requirements. The Government no longer states the specific amount of meat, potatoes, gravy, etc. that goes into a tray pack item, only an overall amount with a protein and carbohydrate requirement. Meeting the protein requirement indicates that the Contractor has put in sufficient meat quantities in the tray/pouch to satisfy the requirement. Different Contractors will put in differing quantities of beef, turkey, ham, pork, chicken breast, etc. to meet the protein performance requirements. This is why specific weights or quantities cannot be specified in advance in this EPA as would be used in a Military Specification and the cost for the items subject to adjustment will be entered by the Contractor in Section B. The Government performs oversight to ensure that the performance requirements are met or exceeded.

(g) Adjustments shall be calculated as follows: (Round to four decimal places)

(1) Compute the Adjusting Unit Price and the Base Unit Price.

(2) (Adjusting Unit Price – Base Unit Price)/Base Unit Price = Market Price Change (+ or -).

(3) Market Price Change X Allowance Factor = Price Adjustment (+ or -).

(4) Determine the Contract Unit Price Adjustment by computing the sum total of the price Adjustment of all items subject to EPA.

(5) The original option unit price(s) for each option will be the sum of the firm fixed price portion and the portion subject to the EPA (as discussed in section (f) above, the portion of the price subject to the EPA is the Allowance Factor). The adjusted unit price(s) for each option shall be determined by increasing or decreasing (as appropriate) the EPA Allowance Factor by the Contract Unit Price Adjustment and adding that to the firm fixed price portion agreed to at the time of award for the option period being adjusted.

(h) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit price.

(i) Payments: Payment for an adjustment under this clause shall be at the current contract price until an adjustment modification has been effected. The Government shall pay the Contractor, upon submission of proper invoices or vouchers the unit price stipulated in the contract modification for the applicable option period. The Contractor also represents by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(j) Any pricing actions pursuant to the “CHANGES” clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(k) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(l) Upward ceiling on economic price adjustment: The total increase in any contract unit price shall not exceed 10% per year of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(m) Revision of market price indicator: In the event that (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially; or (ii) the Contracting Officer determines that a particular market price indicator consistently and substantially fails to reflect market conditions, -- the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(n) Disputes: If the parties fail to agree on an appropriate substitute market price indicator or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the Disputes clause of the contract.

(o) Authority to add additional traypack items to Polymeric Traypack Ration EPA clause. Paragraph (b) of this clause identifies 23 unique components contained in the polymeric traypack ration. These components are selected based on historical data and may not be included in every polymeric traypack ration. Refer elsewhere in the solicitation/contract for listing of the exact component makeup. Due to customer requirements, the Contracting Officer may add additional components to the polymeric traypack ration. The Contracting Officer will show within paragraph (b) the additional components(s).

(p) Examination of records: The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(q) In the event any applicable market price indicator is not published for any week(s), that week will not be included in calculating the base unit price or the adjusting unit price as applicable. For instance, if within a 52 week period an indicator is not published 4 times, the average of the 48 published prices only will be calculated. When a range of prices is provided, for the purposes of the calculations the arithmetic average of the high and low number will be calculated to determine the indicator for that period.

(End of Clause)

52.216-9058 Economic Price Adjustment (EPA) – Established Market Price – Wool Cloth .

As prescribed in 16.203-4-90 (l)(1) and FAR 16.203-1(a)(1), insert the following provision:

ECONOMIC PRICE ADJUSTMENT (EPA) - ESTABLISHED MARKET PRICE – WOOL CLOTH (SEP 2015)

(a) Warranties. For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule do not include allowances for any portion of the contingency covered by this clause.

(b) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price shall be used for adjustment(s) to contract price(s) under this clause. The established market price shall be the average price for [Contracting officer fill in with grade of wool] Australian Wool, clean delivered price in United States (U.S) Dollars, published during a specified period by the United States Department of Agriculture (USDA), in the "USDA Weekly National Lamb Market Summary (WNLMS)”.

(1) Base unit price. The base unit price for the purpose of calculating the adjustment(s) under this clause shall be the arithmetic average price for Australian wool clean delivered [contracting officer fill-in] published during the latest four week period immediately preceding the closing date for proposals (if no discussions are held), the due date of final proposal revision (if discussions are held), or the solicitation opening date (if sealed bidding is used.)

(2) Adjusting unit price. The adjusting unit price shall be the arithmetic average price for Australian wool clean delivered [contracting officer fill-in grade of wool] published during the four week period immediately preceding the effective date the option term is exercised.

(c) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit prices. One adjustment calculation shall be made annually to determine the unit price applicable to the forthcoming option term (if exercised).

(d) Allowance factor: For the purpose of the price adjustment pursuant to this clause, it shall be conclusively presumed that [Fill in with pounds of wool/yard] will be required to produce one linear yard of finished cloth. This allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance. The price adjustment under this EPA clause shall apply only to the cost of wool and shall not apply to any other direct or indirect cost or profit.

(e) Adjustments shall be calculated as follows: (Round to four decimal places).

(1) compute the adjusting unit price and the base unit price.

(2) (Adjusting unit price – base price = market price change (+ or -).

(3) Market price change x allowance factor = contract unit price adjustment, (+/-).

(4) The adjusted unit price(s) for each option period exercised shall be determined by increasing or decreasing (as appropriate) the original option unit price(s) by the contract unit price adjustment. The original option unit prices are those unit prices agreed to at time of award for the option (i.e.; 1, 2, 3, or 4) being adjusted.

The following example is provided:

Example of adjustment calculation

Base unit price calculation

Final proposal revision due date:  24 October 2006

The average mean of the prices for 22 micron, United States Department of Agriculture (USDA) grade 64’s Australian wool, clean delivered price in United States (U.S.) Dollars published during the 4 week period immediately preceding the due date for Final Proposal Revisions will be used to calculate the base unit price for the wool component as follows (i.e.; the four weeks immediately preceding the due date for final proposal revisions covers the 28 day period 26 September 2006 – 23 October 2006):

Base unit price calculation

USDA Weekly National Lamb Market Summary: USDA Grade 64’s (22 Micron) Australian wool clean, delivered price in U.S. dollars

Date

Price in $ (64’s) (22 Micron)

20 October 2006

2.6100

13 October 2006

2.4900

06 October 2006

2.4500

29 September 2006

Total Four Weeks

2.4900

10.0400

Total /4 = Average mean price

2.5100

Note:  For some four week periods, the USDA may publish fewer than 4 issues of the summary due to events such as Federal Holidays. In all such cases, only those issues published for the relevant four week period will be used in calculations.

Base award date: 18 December 2006

Adjusting unit price calculation

Option Number 1 exercised: 12 September 2007

The average mean of the prices for clean delivered 64’s (22 Micron) Australian Wool in US Dollars published during the four week period immediately preceding the effective date of option invocation will be used to calculate the adjusting unit price (11 September 2007 – 15 August 2007):

Date

Price in $ 64’s) (22 Micron)

07 Sep 2007

3.6100

31 Aug 2007

3.4700

24 Aug 2007

3.5800

17 Aug 2007

3.6900

Total Four Weeks

Total /4 = Average Mean Price

14.3500

3.5875

1. Calculate the Base and Adjusting Unit Price (U/P): From above, Base U/P = $2.5100

and Adjusting Unit Price = $3.5875  (Round to 4 decimal places)

2. Calculate Market Price Change (+/-):  Adjusting U/P – Base U/P = $3.5875 - $2.5100 = $1.0775. (Round to 4 decimal places). 

3. Calculate Contract Unit Price Adjustment (+/-):  Market Price Change x Allowance Factor

$1.0775/pound x 0.2714 pound/yard = $0.2924/yard

Net Adjustment Per linear yard = $0.29 (Round to nearest cent).

4. Calculate adjusted U/P for Option No 1 (+/-):  Original Option No 1 U/P (+/-) contract U/P adjustment. (Option Number 1 original option price = $10.05) $10.05 + $0.29 = $10.34.

Note: The above is a hypothetical example of an upward adjustment in the Option No 1 unit price.  The dates used above are not representative of those dates anticipated to be experienced during actual contract performance.

(f) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit prices.

(g) Payments: Payment for an adjustment under this clause shall be at the current contract price until an adjustment modification has been effected. The Government shall pay the Contractor, upon the submission of proper invoices or vouchers, the unit price stipulated in the contract modification for the applicable option period. The Contractor also represent by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(h) Any pricing actions pursuant to the “CHANGES” clause or other provisions of the contract will be priced as though there were no provision for economic price adjustment.

(i) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(j) Upward ceiling on economic price adjustment: The total increase in any contract unit price shall not exceed 10% per year of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustment under this clause.

(k) Revision of market price indicator: In the event that (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or; (ii) the Contracting Officer determines that the market price indicator consistently and substantially fails to reflect market conditions, -- the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions

(l) Disputes: If the parties fail to agree on an appropriate substitute market price indicator, or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the Disputes clause of the contract.

(m) Examination of records: The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(End of Clause)

52.216-9059 Economic Price Adjustment - Meal Cold Weather/Long Range Patrol (MCW/LRP)

As prescribed at 16.203-4-90(l)(4) and FAR 16.203(a)(1), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) - MEAL COLD WEATHER/LONG RANGE PATROL (MCW/LRP) (SEP 2015)

(a) Warranties: For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule does not include allowances for any portion of the contingency covered by this clause.

(b) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only (e.g. an average of beef indices for beef products, an average of poultry indices for poultry products, etc.) for the period specified under the “Base Unit Price” below immediately preceding either the solicitation closing date for proposals (if no discussions are held), the due date for final proposal revisions (if discussions are held) or the solicitation opening date (if sealed bidding is used).

ITEM

MENU

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

             

Chicken

#1

Spicy Oriental Chicken w/ Rice

Breasts, B/S, Georgia, FOB Dock, Wtd. Avg. Price

USDA / USDA Broiler Market News Report / 3 X Per Wk

52 Week period

52 Week period

 

#5

Chicken & Rice

Breasts, B/S, Georgia, FOB Dock, Wtd. Avg. Price

USDA / USDA Broiler Market News Report / 3 X Per Wk

52 Week period

52 Week period

 

#9

Rice and Chicken, Mexican

Breasts, B/S, Georgia, FOB Dock, Wtd. Avg. Price

USDA / USDA Broiler Market News Report / 3 X Per Wk

52 Week period

52 Week period

 

#3

Soup, Noodle, Ramen, Instant, Fried Noodle, Cup

Flour, hard winter Kansas City cwt

WSJ / WSJ Commodity Cash Prices / Daily

52 Week period

52 Week period

             

Beef

#2

Beef Stroganoff w/ Noodles

IMPS 167A Round, Knuckle, Trimmed, Wtd, Avg. (BPN U-12)

USDA / Weekly Nation Carlot Meat Report / Weekly

52 Week period

52 Week period

 

#3

Chili Macaroni

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly Nation Carlot Meat Report / Weekly

52 Week period

52 Week period

 

#7

Beef Stew

IMPS 167A Round, Knuckle, Trimmed, Wtd, Avg. (BPN U-12)

USDA / Weekly Nation Carlot Meat Report / Weekly

52 Week period

52 Week period

 

#8

Spaghetti w/ Meat Sauce

Flour, hard winter Kansas City cwt

WSJ / WSJ Commodity Cash Prices / Daily

52 Week period

52 Week period

 

#3

Soup, Noodle, Ramen, Instant, Fried Noodle, Cup

Flour, hard winter Kansas City cwt

WSJ / WSJ Commodity Cash Prices / Daily

52 Week period

52 Week period

             

Pork

#10

Scrambled Eggs w/ cheese, Western style (type III- Ham dices)

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

 

#11

Scrambled Eggs w/ Bacon (type II-Bacon pieces)

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

 

#12

Scrambled Eggs w/ cheese, Western style (type III- Ham dices)

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

             

Turkey

#4

Turkey Tetrazzini

Turkey Breasts, B/S, Tom

USDA / USDA Turkey Market News Report / 3 X Per Wk

52 Week period

52 Week period

             

Eggs

#10

Scrambled Eggs w/ cheese, Western style

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

 

#11

Scrambled Eggs w/ Bacon

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

 

#12

Scrambled Eggs w/ cheese, Western style

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

             

Cheese

#3

Cheese spread

Cheese Average Price Per Pound (Class III)

USDA / Federal Milk Order Price Announcements / Monthly

12 Month period

12 Month period

 

#4

Cheese spread

Cheese Average Price Per Pound (Class III)

USDA / USDA Federal Milk Order Price Announcements / Monthly

12 Months period

12 Month period

 

#10

Scrambled Eggs w/ cheese, Western style

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

 

#12

Scrambled Eggs w/ cheese, Western style

National Liquid, Whole, Wtd. Avg

USDA / USDA Egg Market News / 2 X Per Wk

52 Week period

52 Week period

             

Non-Fat Dry Milk Powder

#1 & #12

Dairy shake

Base Skim Milk

Price for Class I time 0.965 plus Advanced Butterfat Pricing Factor times 3.5

USDA / USDA, AMS, Dairy Programs / Monthly

12 Month period

12 Month period

 

#10

Cocoa beverage powder

Cocoa, Ivory Coast, $ per metric ton

WSJ / WSJ Commodity Cash Prices / Daily

52 Week period

52 Week period

 

#11

Cocoa beverage powder

Cocoa, Ivory Coast, $ per metric ton

WSJ / WSJ Commodity Cash Prices / Daily

52 Week period

52 Week period

 

#2

Chocolate Sports Bar

Cocoa, Ivory Coast, $ per metric ton

WSJ / WSJ Commodity Cash Prices / Daily

52 Week period

52 Week period

             
 

All Accessory Packets

Non-Dairy Creamer

Soybean oil, crude; Central Illinois lb.

WSJ / WSJ Commodity Cash Prices / Daily

52 Week period

52 Week period

             

Peanut Butter / Peanuts

#3

Chocolate Peanut Pan Coated Disks

Virginia Peanuts Average Price per pound

USDA / National Agriculture Statistical Studies (NASS) Peanut Prices / Weekly

52 Week period

52 Week period

 

#2 & #6

Nut & Fruit Mix

Virginia Peanuts Average Price per pound

USDA / National Agriculture Statistical Studies (NASS) Peanut Prices / Weekly

52 Week period

52 Week period

 

#8

Chocolate Peanut Spread

Virginia Peanuts Average Price per pound

USDA / National Agriculture Statistical Studies (NASS) Peanut Prices / Weekly

52 Week period

52 Week period

Packaging Materials

Linerboard

Linerboard (42-lb) Unbleached Kraft, East, Sh. Ton, Semi-Annual

Miller Freeman, Inc. / Pulp & Paper Week / Weekly/Prices are Published Monthly

Semi-annual

Semi-annual

Packaging Materials

 

Resins

LDPE Resins, Large Buyer Price Film Liner Grade

Chemical Data / Monthly Petrochemical & Plastic Analysis / Monthly

12 month period

12 month period

In addition to the components shown above, the following are also included

ITEM

MENU

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

(To be completed as required)

(c) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Adjusting Unit Price” column shown in paragraph (b) immediately preceding the effective date the option term is exercised.

(d) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically based market price fluctuations for commodity groups or specific supplies. The established market price that shall be used for the EPA factors subject to price adjustments under this clause, and the economic indicators and publications to be used are listed in paragraph (b) of this clause.

(1) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Base Unit Price” column in paragraph (b) immediately preceding (i) the closing date for proposals, if no discussions are held, (ii) the due date for final proposal revisions, if discussions are held, or (iii) the opening date, if sealed bidding is used.

(2) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator for the period specified under the Adjusting Unit Price column in paragraph (b) immediately preceding the effective date the option term is exercised, except for linerboard which shall require one additional adjustment six months after each option term is exercised.

(e) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit prices. One adjustment calculation shall be made annually to determine the unit prices applicable to the forthcoming option term (if exercised), except linerboard which will be adjusted on a semi-annual basis.

(f) EPA allowance factor: For the purpose of price adjustment pursuant to this clause, it shall be conclusively presumed that the amount shown under “Portion Subject to EPA” represents the cost of each item that is subject to adjustment. The portion subject to EPA refers to the element of cost for each item that is outside the control of the vendor and in “Schedule B” the offerors will be required to fill in this amount. This is the only portion of the cost that will be subject to the EPA provision. The EPA provisions based on changes in market prices for product material costs such as chicken, beef, turkey, eggs, cheese, dry milk powder, and peanuts are subject to the EPA, because there is serious doubt concerning the stability of market conditions. The balance of product costs for items such as labor, overhead, General and Administrative (G&A), transportation, and profit are those contingencies that can be included in the contract price and can be identified and covered separately through firm fixed prices. The EPA allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance.

(g) Performance requirement: The United States Army Research, Development and Engineering Command (RDECOM) Natick Soldier Center (NSC) who prepares the specifications has moved from Military Specifications to Performance Requirements. The Government no longer states the specific amount of product (meat, flour, cheese, eggs, etc.) that goes into a Meal Cold Weather/Long Range Patrol (MCW/LRP), only an overall amount with a protein and carbohydrate requirement. Meeting the protein requirement indicates that the Contractor has put in sufficient (meat) quantities in the MCW/LRP to satisfy the requirement. (Different Contractors will put in differing quantities of chicken, beef, turkey, eggs, cheese, etc. to meet the protein performance requirements). This is why specific weights or quantities cannot be specified in advance in this EPA as would be used in a military specification and the cost for the items subject to adjustment will be entered by the Contractor in Section B. The Government performs oversight to ensure that the performance requirements are met or exceeded.

(h) Adjustments shall be calculated as follows: (Round to four decimal places)

(1) Compute the adjusting unit price and the base unit price.

(2) (Adjusting unit price – base unit price)/base unit price = market price change (+ or -).

(3) Market price change x allowance factor = contract unit price adjustment (+ or -) for each item subject to EPA adjustment.

(4) The original option unit price(s) for each option will be the sum of the firm fixed price portion and the portion subject to the EPA (Allowance Factor). The adjusted unit price(s) for each option shall be determined by increasing or decreasing (as appropriate) the allowance factor by the contract unit price adjustment and adding that to the firm fixed price portion agreed to at the time of award for the option period being adjusted.

(5) Determine the contract price adjustment by computing the sum total of the price adjustment of all items subject to EPA.

(i) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit price.

(j) Payments: Payment for items pending adjustment under this clause shall be at the existing unadjusted current unit price until an adjustment modification has been issued. Following issuance of an adjusting contract modification, the Government shall pay the Contractor, upon submission of proper invoices or vouchers, the adjusted price stated in the contract modification for the applicable option period. The Contractor represents by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(k) Any pricing actions pursuant to the “Changes” clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(l) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(m) Upward ceiling on economic price adjustment: The total increase in any contract unit price shall not exceed 10% per annum of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(n) Revision of market price indicator: In the event (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or (ii) the Contracting Officer determines that a particular market price indicator consistently and substantially no longer reflects market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(o) Disputes: If the parties fail to agree on an appropriate substitute market price indicator or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the Disputes clause of the contract.

(p) Authority to add additional items to this clause: Paragraph (b) of this clause identifies 30 unique components contained in the MCW/LRP. These components are selected based on historical data and may not be included in every ration. Refer elsewhere in the solicitation/contract for listing of the exact component makeup. Due to customer requirements, the Contracting Officer may add additional components to the ration. The Contracting Officer will show within paragraph (b) the additional components(s).

(q) Examination of records: The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(r) In the event any applicable market price indicator is not published for any week(s), that week will not be included in calculating the base unit price or the adjusting unit price as applicable. For instance, if within a 52 week period an indicator is not published 4 times, the average of the 48 published prices only will be calculated. When a range of prices is provided, for the purposes of the calculations the arithmetic average of the high and low number will be calculated to determine the indicator for that period.

(End of Clause)

52.216-9060 Economic Price Adjustment - Meal Ready To Eat (MRE) Assembly.

As prescribed at 16.203-4-90(l)(6) and FAR 16.203(a)(1), insert the following clause.

ECONOMIC PRICE ADJUSTMENT (EPA) – MEAL READY TO EAT (MRE) ASSEMBLY

(SEP 2015)

(a) Warranties: For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule do not include allowances for any portion of the contingency covered by this clause.

(b) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only (e.g. an average of beef indices for beef products, an average of poultry indices for poultry products, etc.) for the period specified under the “Base Unit Price” below immediately preceding either the solicitation closing date for proposals (if no discussions are held), the due date for final proposal revisions (if discussions are held) or the solicitation opening date (if sealed bidding is used).

ITEM

ECONOMIC INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ.

UNIT PRICE

Beef Brisket

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Beef Patty

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Beef Ravioli

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Beef Stew

IMPS 167A

Round, Knuckle, Trimmed, Wtd. Avg. (BPN U-12)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Southwest Beef and Black Beans

IMPS 167A Round, Knuckle, Trimmed, Wtd. Avg. (BPN U-12)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Cheese Tortellini

National Liquid, Whole, Wtd. Avg.

USDA / Egg Market News Report / Weekly

52-week period

52-week period

         

Chicken with Dumplings

Heavy Type Hens, S.E. Heavy Live Hen Report, At Farm Buyer Loading, Wtd. Avg.

USDA / Broiler Market New Report (Monday Edition) / Weekly

52-week period

52-week period

         

Chicken Fajita

Breasts, B/S, Georgia FOB Dock, Wtd. Avg. Price

USDA / Broiler Market New Report (Monday Edition) / Weekly

52-week period

52-week period

         

Chicken with Noodles

Heavy Type Hens, S.E. Heavy Live Hen Report, At Farm Buyer Loading, Wtd. Avg.

USDA / Broiler Market New Report (Monday Edition) / Weekly

52-week period

52-week period

         

Chicken Pesto and Pasta

Breasts, B/S,Georgia FOB Dock, Wtd. Avg. Price

USDA / Broiler Market New Report (Monday Edition) / Weekly

52-week period

52-week period

         

Chicken with Tomato/Feta

Breasts, B/S, Georgia FOB Dock, Wtd. Avg. Price

USDA / Broiler Market New Report (Monday Edition) / Weekly

52-week period

52-week period

         

Buffalo Chicken

Breasts, B/S, Georgia FOB Dock, Wtd. Avg. Price

USDA / Broiler Market New Report (Monday Edition) / Weekly

52-week period

52-week period

         

Chili with Beans

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Chili and Macaroni

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Meatballs/ Marinara

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Penne w/ Vegetable Sausage

Loins, Bone-In, Fresh, 1/4"Trim 13-19#, C4, Wtd. Avg.(BPN U-40)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Pork Sausage w/ Gravy

Loins, Bone-In, Fresh, 1/4"Trim 13-19#, C4, Wtd. Avg.(BPN U-40)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Boneless Pork Rib

Loins, Bone-In, Fresh, 1/4"Trim 13-19#, C4, Wtd.Avg.(BPN U-40)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Pot Roast w/ Vegetables

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Sloppy Joe

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Spaghetti w/ Meat Sauce

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Beef Snacks

IMPS 171B Round, Outside Round, Wtd. Avg.(BPN U-31)

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52-week period

         

Packaging Materials

Linerboard

(42-lb) Unbleached kraft, East, Sh. Ton

Miller Freeman, Inc. / Pulp & Paper Week / Weekly but Prices are Published Monthly

Semi-annual

Semi-annual

         

Packaging Materials

LDPE Resins, Large Buyer Price Film Liner Grade

Chemical Data / Monthly Petrochemical & Plastic Analysis / Monthly

12

month

period

12

month

period

In addition to the components shown above, the following are also included:

ITEM

ECONOMIC INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ.

UNIT PRICE

(To be completed as required)

(c) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Adjusting Unit Price” column shown in paragraph (b) immediately preceding the effective date the option term is exercised.

(d) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically based market price fluctuations for commodity groups or specific supplies. The established market price that shall be used for the MRE items subject to price adjustments under this clause, and the economic indicators and publications to be used are listed in paragraph (b) of this clause.

(1) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Base Unit Price” column in paragraph (b) immediately preceding (i) the closing date for proposals, if no discussions are held, (ii) the due date for final proposal revisions, if discussions are held, or (iii) the opening date, if sealed bidding is used.

(2) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator for the period specified under the “Adjusting Unit Price” column in paragraph (b) immediately preceding the effective date the option term is exercised, except for linerboard which shall require one additional adjustment six months after each option term is exercised.

(e) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit prices. One adjustment calculation shall be made annually to determine the unit prices applicable to the forthcoming option term (if exercised), except linerboard which will be adjusted on a semi-annual basis.

(f) EPA allowance factor: For the purpose of price adjustment pursuant to this clause, it shall be conclusively presumed that the amount shown under “Portion Subject to EPA” represents the cost of each item that is subject to adjustment. The portion subject to EPA refers to the element of cost for each item that is outside the control of the vendor and in “Schedule B” the offerors will be required to fill in this amount. This is the only portion of the cost that will be subject to the EPA provision. The EPA provisions based on changes in market prices for product material costs such as beef, chicken, and pork are subject to the EPA, because there is serious doubt concerning the stability of market conditions. The balance of product costs for items such as labor, overhead, General and Administrative (G&A), transportation, and profit are those contingencies that can be included in the contract price and can be identified and covered separately through firm fixed prices. The EPA allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance.

(g) Performance requirements: The United States Army Research, Development and Engineering Command (RDECOM) Natick Soldier Center (NSC) who prepares the specifications has moved from Military Specifications to Performance Requirements. The Government no longer states the specific amount of product (meat, potatoes, gravy, etc.) that goes into a MRE, only an overall amount with a protein and carbohydrate requirement. Meeting the protein requirement indicates that the Contractor has put in sufficient (meat) quantities in the MRE to satisfy the requirement. (Different Contractors will put in differing quantities of beef, pork, chicken breast, etc. to meet the protein performance requirements). This is why specific weights or quantities cannot be specified in advance in this EPA as would be used in a Military Specification and the cost for the items subject to adjustment will be entered by the Contractor in Section B. The Government performs oversight to ensure that the performance requirements are met or exceeded.

(h) Adjustments shall be calculated as follows: (Round to four decimal places)

(1) Compute the Adjusting Unit Price and the Base Unit Price.

(2) (Adjusting Unit Price – Base Unit Price)/Base Unit Price = Market Price Change (+ or -).

(3) Market Price Change X Allowance Factor = Contract Unit Price Adjustment (+ or -) for each item subject to EPA adjustment.

(4) The original option unit price(s) for each option will be the sum of the firm fixed price portion and the portion subject to the EPA (Allowance Factor). The adjusted unit price(s) for each option shall be determined by increasing or decreasing (as appropriate) the Allowance Factor by the Contract Unit Price Adjustment and adding that to the firm fixed price portion agreed to at the time of award for the option period being adjusted.

(5) Determine the Contract Price Adjustment by computing the sum total of the price adjustment of all items subject to EPA.

(i) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit price.

(j) Payments: Payment for items pending adjustment under this clause shall be at the existing unadjusted contract unit price until an adjustment modification has been issued. Following issuance of an adjusting contract modification, the Government shall pay the Contractor, upon submission of proper invoices or vouchers, the adjusted price stated in the contract modification for the applicable option period. The Contractor represents by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(k) Any pricing actions pursuant to the Changes Clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(l) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(m) Upward ceiling on economic price adjustment: The total increase in any contract unit price shall not exceed 10% per annum of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(n) Revision of market price indicator: In the event (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or (ii) the Contracting Officer determines that a particular market price indicator consistently and substantially no longer reflects market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(o) Disputes: If the parties fail to agree on an appropriate substitute market price indicator or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the Disputes clause of the contract.

(p) Authority to add additional items to this clause: Paragraph (b) of this clause identifies 24 unique components contained in the MRE Assembly. These components are selected based on historical data and may not be included in every assembly. Refer elsewhere in the solicitation/contract for listing of the exact component makeup. Due to customer requirements, the Contracting Officer may add additional components to the assembly. The Contracting Officer will show within paragraph (b) the additional components(s).

(q) Examination of records: The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(r) In the event any applicable market price indicator is not published for any week(s), that week will not be included in calculating the base unit price or the adjusting unit price as applicable. For instance, if within a 52 week period an indicator is not published 4 times, the average of the 48 published prices only will be calculated. When a range of prices is provided, for the purposes of the calculations the arithmetic average of the high and low number will be calculated to determine the indicator for that period.

(End of Clause)

52.216-9061 Economic Price Adjustment – Table Spreads.

As prescribed at 16.203-4-90(l)(2) and FAR 16.203-1(a)(1), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) – TABLE SPREADS (SEP 2015)

(a) Warranties: For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule do not include allowances for any portion of the contingency covered by this clause.

(b) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only (e.g. an average of cheese and butter indices for cheese products, and an average of peanut indices for peanut products) for the period specified under the “Base Unit Price” below immediately preceding either the solicitation closing date for proposals (if no discussions are held), the due date for final proposal revisions (if discussions are held) or the solicitation opening date (if sealed bidding is used).

ITEM

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION /

FREQUENCY PUBLISHED

BASE

UNIT PRICE

ADJ. UNIT PRICE

           

Plain Cheese Spread

Cheese & Butter

Cheese Barrels - 40# Blocks & Grade AA Butter

Chicago Mercantile Exchange Cash Trading / USDA Dairy Market News / Weekly

52 week period

52 week period

           

Jalapeno Cheese Spread

Cheese & Butter

Cheese Barrels - 40# Blocks & Grade AA Butter

Chicago Mercantile Exchange Cash Trading / USDA Dairy Market News / Weekly

52 week period

52 week period

           

Bacon Cheese Spread

Cheese & Butter

Cheese Barrels - 40# Blocks & Grade AA Butter

Chicago Mercantile Exchange Cash Trading / USDA Dairy Market News / Weekly

52 week period

52 week period

           

Plain

Peanut Butter

Peanut Butter

PPI Table # WPU01830111 For Peanut Butter & Roasted Peanuts

Bureau Of Labor Statistics – Producer Price Index (PPI) / Monthly

12 month period

12 month period

           

Chocolate Peanut Butter

Peanut Butter

PPI Table # WPU01830111 For Peanut Butter & Roasted Peanuts

Bureau Of Labor Statistics / Producer Price Index (PPI) / Monthly

12 month period

12 month period

           

Chunky Peanut Butter

Peanut Butter

PPI Table # WPU01830111 For Peanut Butter & Roasted Peanuts

Bureau Of Labor Statistics / Producer Price Index (PPI) / Monthly

12 month period

12 month period

In addition to the components shown above, the following are also included:

ITEM

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE

UNIT PRICE

ADJ. UNIT PRICE

(To be completed as required)

(c) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Adjusting Unit Price” column shown in paragraph (b) immediately preceding the effective date the option term is exercised.

(d) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically based market price fluctuations for commodity groups or specific supplies. The established market price that shall be used for the EPA factors subject to price adjustments under this clause, and the economic indicators and publications to be used are listed in paragraph (b) of this clause.

(1) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Base Unit Price” column in paragraph (b) immediately preceding (i) the closing date for proposals, if no discussions are held, (ii) the due date for final proposal revisions, if discussions are held, or (iii) the opening date, if sealed bidding is used.

(2) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator for the period specified under the “Adjusting Unit Price” column in paragraph (b) immediately preceding the effective date the option term is exercised.

(e) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit prices. One adjustment calculation shall be made annually to determine the unit prices applicable to the forthcoming option term (if exercised).

(f) EPA allowance factor: For the purpose of price adjustment pursuant to this clause, it shall be conclusively presumed that the amount shown under “Portion Subject to EPA” represents the cost of each item that is subject to adjustment. The portion subject to EPA refers to the element of cost for each item that is outside the control of the vendor and in “Schedule B” the offerors will be required to fill in this amount. This is the only portion of the cost that will be subject to the EPA provision. The EPA provisions based on changes in market prices for product material costs such as cheese, butter, and peanuts, are subject to the EPA, because there is serious doubt concerning the stability of market conditions. The balance of product costs for items such as labor, overhead, General and Administrative (G&A), transportation, and profit are those contingencies that can be included in the contract price and can be identified and covered separately through firm fixed prices. The EPA allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance.

(g) Performance requirements: The United States Army Research, Development and Engineering Command (RDECOM) Natick Soldier Center (NSC) who prepares the specifications has moved from Military Specifications to Performance Requirements. The Government no longer states the specific amount of product (cheese, butter, peanuts, etc.) that goes into a table spread, only an overall amount with a protein and carbohydrate requirement. (Different Contractors will put in differing quantities of cheese, butter, peanuts, etc. to meet the performance requirements). This is why specific weights or quantities cannot be specified in advance in this EPA as would be used in a Military Specification and the cost for the items subject to adjustment will be entered by the Contractor in Section B. The Government performs oversight to ensure that the performance requirements are met or exceeded.

(h) Adjustments shall be calculated as follows: (Round to four decimal places)

(1) Compute the adjusting unit price and the base unit price.

(2) (Adjusting unit price – base unit price)/base unit price = market price change (+ or -).

(3) Market price Change X Allowance Factor = Contract Unit Price Adjustment (+ or -) for each item subject to EPA adjustment.

(4) The original option unit price(s) for each option will be the sum of the firm fixed price portion and the portion subject to the EPA (allowance factor). The adjusted unit price(s) for each option shall be determined by increasing or decreasing (as appropriate) the allowance factor by the contract unit price adjustment and adding that to the firm fixed price portion agreed to at the time of award for the option period being adjusted.

(5) Determine the contract price adjustment by computing the sum total of the price adjustments of all items subject to EPA.

(i) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit price.

(j) Payments: Payment for items pending adjustment under this clause shall be at the existing unadjusted contract unit price until an adjustment modification has been issued. Following issuance of an adjusting contract modification, the Government shall pay the Contractor, upon submission of proper invoices or vouchers, the adjusted price stated in the contract modification for the applicable option period. The Contractor represents by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(k) Any pricing actions pursuant to the “CHANGES” clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(l) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(m) Upward ceiling on economic price adjustment: The total increase in any contract unit price shall not exceed 10% per annum of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(n) Revision of market price indicator: In the event (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or (ii) the Contracting Officer determines that a particular market price indicator consistently and substantially no longer reflects market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(o) Disputes: If the parties fail to agree on an appropriate substitute market price indicator or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the Disputes clause of the contract.

(p) Authority to add additional items to this clause: Paragraph (b) of this clause identifies 6 unique components contained in the ration. These components are selected based on historical data and may not be included in every ration. Refer elsewhere in the solicitation/contract for listing of the exact component makeup. Due to customer requirements, the Contracting Officer may add additional components to the ration. The Contracting Officer will show within paragraph (b) the additional components(s).

(q) Examination of records: The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(r) In the event any applicable market price indicator is not published for any week(s), that week will not be included in calculating the base unit price or the adjusting unit price as applicable. For instance, if within a 52 week period an indicator is not published 4 times, the average of the 48 published prices only will be calculated. When a range of prices is provided, for the purposes of the calculations the arithmetic average of the high and low number will be calculated to determine the indicator for that period.

(End of Clause)

52.216-9062 Economic Price Adjustment - Unitized Group Ration.

As prescribed at 16.203-4-90(l)(3) and FAR 16.203-1(a)(1), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) – UNITIZED GROUP RATION (UGR) (SEP 2015)

(a) Warranties: For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule does not include allowances for any portion of the contingency covered by this clause.

(b) Base unit price: The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only (e.g. an average of egg indices for egg products, pork belly indices for pork products, and skim milk and butterfat indices for milk products) only for the period specified under the “BASE Unit Price” column in paragraph (b) immediately preceding (i) the closing date for proposals, (if no discussions are held), (ii) the due date for final proposal revisions, (if discussions are held), or (iii) the opening date, (if sealed bidding is used).

ITEM

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

           

Boil-In-Bag

Dehy Egg Mix

Egg

National Liquid Egg, Whole, Weighted Average

USDA / Egg Market News Report / Weekly

52 week period

52 week period

           

Bacon, precooked, sliced, cured

Pork Belly

Pork Belly, Seedless, Fresh, Skin on , Trimmed 14-16#, Weighted, U49

USDA / Weekly National Carlot Meat Report / Weekly

52-week period

52 week period

           

UHT Milk

Skim Milk and Butterfat Fluid Milk products (Class I Milk)

Base Skim Milk Price for Class I time 0.965 plus Advanced Butterfat Pricing Factor times 0.035

USDA / USDA, AMS, Dairy Programs / Announcement of Advanced Prices and Pricing Factors / Monthly

12 month period

12 month period

In addition to the components shown above, the following are also included:

ITEM

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

(To be completed as required)

(c) Adjusting unit price: The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Adjusting Unit Price” column shown in paragraph (b) immediately preceding the effective date the option term is exercised.

(d) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically based market price fluctuations for commodity groups or specific supplies. The established market price that shall be used for the EPA factors subject to price adjustments under this clause, and the economic indicators and publications to be used are listed in paragraph (b) of this clause.

(e) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit prices. One adjustment calculation shall be made annually to determine the unit prices applicable to the forthcoming option term (if exercised).

(f) EPA allowance factor: For the purpose of price adjustment pursuant to this clause, it shall be conclusively presumed that the amount shown under “Portion Subject to EPA” represents the cost of each item that is subject to adjustment. The portion subject to EPA refers to the element of cost for each item that is outside the control of the vendor and in “Schedule B” the offerors will be required to fill in this amount. This is the only portion of the cost that will be subject to the EPA provision. The EPA provisions based on changes in market prices for product material costs such as egg, pork belly, skim milk, and buttermilk, are subject to the EPA, because there is serious doubt concerning the stability of market conditions. The balance of product costs for items such as labor, overhead, General and Administrative (G&A), transportation, and profit are those contingencies that can be included in the contract price and can be identified and covered separately through firm fixed prices. The EPA allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance.

(g) Performance requirement: The United States Army Research, Development and Engineering Command (RDECOM) Natick Soldier Center (NSC) who prepares the specifications has moved from Military Specifications to Performance Requirements. The Government no longer states the specific amount of product (egg, pork belly, skim milk, buttermilk etc.) (a unitized group ration item) that goes into a Unitized Group Ration, only an overall amount with a protein and carbohydrate requirement. Meeting the protein and carbohydrate requirement indicates that the Contractor has put in sufficient quantities of required ingredients in the Unitized Group Ration to satisfy the requirement. (Different Contractors will put in differing quantities of egg, pork belly, skim milk, buttermilk etc. to meet the protein and carbohydrate performance requirements). This is why specific weights or quantities cannot be specified in advance in this EPA as would be used in a Military Specification and the cost for the items subject to adjustment will be entered by the Contractor in Section B. The Government performs oversight to ensure that the performance requirements are met or exceeded.

(h) Adjustments shall be calculated as follows: (Round to four decimal places)

(1) Compute the Adjusting Unit Price and the Base Unit Price.

(2) (Adjusting Unit Price – Base Unit Price)/Base Unit Price = Market Price Change (+ or -).

(3) Market Price Change X Allowance Factor = Contract Unit Price Adjustment (+ or -) for each item subject to EPA adjustment.

(4) The original option unit price(s) for each option will be the sum of the firm fixed price portion and the portion subject to the EPA (Allowance Factor). The adjusted unit price(s) for each option shall be determined by increasing or decreasing (as appropriate) the Allowance Factor by the Contract Unit Price Adjustment and adding that to the firm fixed price portion agreed to at the time of award for the option period being adjusted.

(5) Determine the Contract Price Adjustment by computing the sum total of the price Adjustment of all items subject to EPA.

(i) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit price.

(j) Payments: Payment for items pending adjustment under this clause shall be at the existing unadjusted current unit price until an adjustment modification has been issued. Following issuance of an adjusting contract modification, the Government shall pay the Contractor, upon submission of proper invoices or vouchers, the adjusted price stated in the contract modification for the applicable option period. The Contractor represents by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(k) Any pricing actions pursuant to the “Changes” clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(l) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(m) Upward ceiling on economic price adjustment: The total increase in any contract unit price shall not exceed 10% per annum of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(n) Revision of market price indicator: In the event (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or (ii) the Contracting Officer determines that a particular market price indicator consistently and substantially no longer reflects market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(o) Disputes: If the parties fail to agree on an appropriate substitute market price indicator or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the Disputes clause of the contract.

(p) Authority to add additional items to this clause: Paragraph (b) of this clause identifies 3 unique components contained in the ration. These components are selected based on historical data and may not be included in every ration. Refer elsewhere in the solicitation/contract for listing of the exact component makeup. Due to customer requirements, the Contracting Officer may add additional components to the ration. The Contracting Officer will show within paragraph (b) the additional components(s).

(q) Examination of records: The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(r) In the event any applicable market price indicator is not published for any week(s), that week will not be included in calculating the base unit price or the adjusting unit price as applicable. For instance, if within a 52 week period an indicator is not published 4 times, the average of the 48 published prices only will be calculated. When a range of prices is provided, for the purposes of the calculations the arithmetic average of the high and low number will be calculated to determine the indicator for that period.

(End of Clause)

52.216-9063 Economic Price Adjustment (EPA) Tailored Operational Training Meal (TOTM).

As prescribed at 16.203-4-90(l)(5) and FAR 16.203-1(a)(1), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) – TAILORED OPERATIONAL TRAINING MEAL (TOTM) (SEP 2015)

(a) Warranties: For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule do not include allowances for any portion of the contingency covered by this clause.

(b) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only (e.g. an average of beef indices for beef products, an average of poultry indices for poultry products, etc.) for the period specified under the “Base Unit Price” below immediately preceding either the solicitation closing date for proposals (if no discussions are held), the due date for final proposal revisions (if discussions are held) or the solicitation opening date (if sealed bidding is used).

ITEM

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

           

Beef Enchiladas

Beef

IMPS 167A Round Knuckle, Trimmed, Wtd. Avg. (BPN U-12)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Beef Ravioli

Beef

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Beef Stew

Beef

IMPS 167A Round Knuckle, Trimmed, Wtd. Avg. (BPN U-12)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Boneless Pork Rib

Pork

Loins, Bone-In, Fresh, ¼” Trim 13-19#, C4, Wtd. Avg. (BPN U-40)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Chicken Fajita

Chicken

Breasts, B/S, Georgia F.O.B. Dock, Wtd. Avg. Price

USDA / USDA Broiler Market News Report / Weekly

52 week period

52 week period

           

Chicken /Dumpling

Chicken

Breasts, B/S, Georgia F.O.B. Dock, Wtd. Avg. Price

USDA / USDA Broiler Market News Report / Weekly

52 week period

52 week period

           

Chicken w/Noodles

Chicken

Heavy Type Hens, S.E. Heavy Live Hen Report, At Farm Buyer Loading, Wtd. Avg.

USDA / USDA Broiler Market News Report / Weekly

52 week period

52 week period

           

Chicken w/Salsa

Chicken

Breasts, B/S, Georgia F.O.B. Dock, Wtd. Avg. Price

USDA / USDA Broiler Market News Report / Weekly

52 week period

52 week period

           

Chili & Macaroni

Beef

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Chili w/Beans

Beef

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Sloppy Joe Filling

Beef

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Spaghetti w/Meat Sauce

Beef

Boneless Processing Beef/Beef Trimmings, FOB National, Wtd. Avg. 85% fr (BPN U-24)

USDA / Weekly National Carlot Meat Report / Weekly

52 week period

52 week period

           

Packaging Materials

Linerboard

Linerboard (42-lb) Unbleached Kraft, East, Sh. Ton, Semi-Annual

Miller Freeman, Inc. / Pulp & Paper Week / Weekly/Prices are Published Monthly

Semi-annual

Semi-annual

           

Packaging Materials

Resins

LDPE Resins, Large Buyer Price Film Liner Grade

Chemical Data / Monthly Petrochemical & Plastic Analysis / Monthly

12 month period

12 month period

In addition to the components shown above, the following are also included:

ITEM

EPA

FACTOR/

COMPONENT

ECONOMIC

INDICATOR

PUBLISHER / PUBLICATION / FREQUENCY PUBLISHED

BASE UNIT PRICE

ADJ. UNIT PRICE

(To be completed as required)

(c) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Adjusting Unit Price” column shown in paragraph (b) immediately preceding the effective date the option term is exercised.

(d) An established market price is a price that is established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically based market price fluctuations for commodity groups or specific supplies. The established market price that shall be used for the EPA factors subject to price adjustments under this clause, and the economic indicators and publications to be used are listed in paragraph (b) of this clause.

(1) The base unit prices for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator only for the period specified under the “Base Unit Price” column in paragraph (b) immediately preceding (i) the closing date for proposals, if no discussions are held, (ii) the due date for final proposal revisions, if discussions are held, or (iii) the opening date, if sealed bidding is used.

(2) The adjusting unit prices shall be the arithmetic average of the weekly or monthly prices of each applicable economic indicator for the period specified under the Adjusting Unit Price column in paragraph (b) immediately preceding the effective date the option term is exercised, except for linerboard which shall require one additional adjustment six months after each option term is exercised.

(e) With respect to increases or decreases under this clause, no adjustment shall be made to the base term contract unit prices. One adjustment calculation shall be made annually to determine the unit prices applicable to the forthcoming option term (if exercised), except linerboard which will be adjusted on a semi-annual basis.

(f) EPA allowance factor: For the purpose of price adjustment pursuant to this clause, it shall be conclusively presumed that the amount shown under “Portion Subject to EPA” represents the cost of each item that is subject to adjustment. The portion subject to EPA refers to the element of cost for each item that is outside the control of the vendor and in “Schedule B” the offerors will be required to fill in this amount. This is the only portion of the cost that will be subject to the EPA provision. The EPA provisions based on changes in market prices for product material costs such as beef, pork, chicken, and linerboard are subject to the EPA, because there is serious doubt concerning the stability of market conditions. The balance of product costs for items such as labor, overhead, General and Administrative (G&A), transportation, and profit are those contingencies that can be included in the contract price and can be identified and covered separately through firm fixed prices. The EPA allowance factor remains fixed throughout the life of the contract unless a Government authorized change is made to the contract which affects this allowance.

(g) Performance requirements: The United States Army Research, Development and Engineering Command (RDECOM) Natick Soldier Center (NSC) who prepares the specifications has moved from Military Specifications to Performance Requirements. The Government no longer states the specific amount of product (meat, potatoes, gravy, etc.) that goes into a Tailored Operational Training Meal (TOTM), only an overall amount with a protein and carbohydrate requirement. Meeting the protein requirement indicates that the Contractor has put in sufficient (meat) quantities in the TOTM to satisfy the requirement. (Different Contractors will put in differing quantities of beef, pork, chicken breast, etc. to meet the protein performance requirements). This is why specific weights or quantities cannot be specified in advance in this EPA as would be used in a Military Specification and the cost for the items subject to adjustment will be entered by the Contractor in Section B. The Government performs oversight to ensure that the performance requirements are met or exceeded.

(h) Adjustments shall be calculated as follows: (Round to four decimal places)

(1) Compute the adjusting unit price and the base unit price.

(2) (Adjusting unit price – base unit price)/base unit price = market price change (+ or -).

(3) Market price change x allowance factor = contract unit price adjustment (+ or -) for each item subject to EPA adjustment.

(4) The original option unit price(s) for each option will be the sum of the firm fixed price portion and the portion subject to the EPA (allowance factor). The adjusted unit price(s) for each option shall be determined by increasing or decreasing (as appropriate) the Allowance Factor by the Contract Unit Price Adjustment and adding that to the firm fixed price portion agreed to at the time of award for the option period being adjusted.

(5) Determine the contract price adjustment by computing the sum total of the price adjustment of all items subject to EPA.

(i) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit price.

(j) Payments: Payment for items pending adjustment under this clause shall be at the existing unadjusted contract unit price until an adjustment modification has been issued. Following issuance of an adjusting contract modification, the Government shall pay the Contractor, upon submission of proper invoices or vouchers, the adjusted price stated in the contract modification for the applicable option period. The Contractor represents by submitting its final invoice that the total amount billed under this contract reflects all increases or decreases required or authorized by this clause.

(k) Any pricing actions pursuant to the “CHANGES” clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(l) No adjustment will be made under this clause unless the total change in the contract amount is $500.00 or more.

(m) Upward ceiling on economic price adjustment: The total increase in any contract unit price shall not exceed 10% per annum of the original option unit prices agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(n) Revision of market price indicator: In the event (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or (ii) the Contracting Officer determines that a particular market price indicator consistently and substantially no longer reflects market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(o) Disputes: If the parties fail to agree on an appropriate substitute market price indicator or implementation of other matters addressed by this EPA clause then the matter shall be resolved in accordance with the Disputes clause of the contract.

(p) Authority to add additional items to this clause: Paragraph (b) of this clause identifies 14 unique components contained in the ration. These components are selected based on historical data and may not be included in every ration. Refer elsewhere in the solicitation/contract for listing of the exact component makeup. Due to customer requirements, the Contracting Officer may add additional components to the ration. The Contracting Officer will show within paragraph (b) the additional components(s).

(q) Examination of records: The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(r) In the event any applicable market price indicator is not published for any week(s), that week will not be included in calculating the base unit price or the adjusting unit price as applicable. For instance, if within a 52 week period an indicator is not published 4 times, the average of the 48 published prices only will be calculated. When a range of prices is provided, for the purposes of the calculations the arithmetic average of the high and low number will be calculated to determine the indicator for that period.

(End of Clause)

52.216-9064 Economic Price Adjustment (EPA) – Actual Material Costs for Subsistence Delivered Price Business Model Economic Price Adjustment (EPA) - DLA Troop Support Subsistence Prime Vendor (SPV) Contiguous United States (CONUS), Alaska, and Hawaii.

As prescribed in 16.203-4(d)(2)(S-95), insert the following clause:

ECONOMIC PRICE ADJUSTMENT (EPA) – ACTUAL MATERIAL COSTS FOR SUBSISTENCE DELIVERED PRICE BUSINESS MODEL – DLA TROOP SUPPORT SUBSISTENCE PRIME VENDOR (SPV) CONTIGUOUS UNITED STATES (CONUS), ALASKA, AND HAWAII

(APR 2014)

(a) Warranties. For the portion of the schedule that is covered by this EPA clause, the Contractor warrants that—

(1) Contract unit prices covered by this contract do not include allowances for any portion of the contingency covered by this clause; and

(2) Price adjustments invoiced under this contract shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause, the term:

(1) “Private label holder” means:

(i) A manufacturer or grower with whom the contractor holds an ownership and/or financial interest, or ownership and/or financial interest in a specific item(s) produced by a manufacturer or grower; or

(ii) An entity holding an intellectual property interest, whether by ownership or license, in the label under which product is being sold in the commercial marketplace; or

(iii) An entity holding exclusive marketing and/or sales authority of a product, or one holding property rights in a proprietary product formula.

(2) “Redistributor” means an entity independent of the contractor from which the contractor purchases product for purposes of consolidating quantities and/or obtaining a competitive delivered price.

(3) “Standard Freight” means the published list price or prevailing market rate for transportation of subsistence and food service operating supplies, i.e. the transportation charge for delivery from the manufacturer/grower/private label holder or redistributor to the SPV Contractor. This may include inter-division transfers between the SPV Contractor’s warehouses provided the delivered price (inclusive of standard freight) of a product at a given time is identical to the delivered price of the same product at the same time to other commercial customers in the SPV Contractor’s electronic purchasing system.

(i) In the event the SPV Contractor picks up product free on board (f.o.b.) origin from a manufacturer/grower/ private label holder, or arranges for delivery transportation from a third party source other than the manufacturer/grower/private label holder, the standard freight charge shall be based on market tariffs/conditions and shall not exceed the lesser of:

(A) The manufacturer/grower/private label holder’s or manufacturer/grower/private label holder’s carrier’s freight price normally payable by the SPV Contractor for inbound shipments of such products and quantities to the Contractor’s distribution point; or

(B) An average price based on market conditions for freight in the same market for the same type of freight service for like products, shipping methods and quantities.

(ii) In rare circumstances, and only with the Contracting Officer’s written approval, the SPV Contractor may use drop shipments, i.e. the product is shipped directly from the manufacturer/grower / private label holder to the customer without the SPV Contractor taking possession. This may involve transportation charges using non-standard freight such as FedEx, United Parcel Service (UPS), or the United States (U.S.) Postal Service. In such instances the Contracting Officer will determine price reasonableness on the unit price inclusive of freight.

(4) “Contract unit price” means the total price per unit charged to DLA Troop Support for a product delivered to DLA Troop Support’s customers. The Contract unit price consists of three components: delivered price plus distribution price less Government rebates and discounts. The unit price sum of the three component prices shall be rounded up or down as applicable, to the nearest cent to determine the final Contract unit price.

(5) Delivered price.

(i) Delivered price” means the most recent manufacturer, grower, or private label holder commercial price per unit to the Contractor, inclusive of all standard freight, that is input in the contractor’s purchasing system as the starting basis for its pricing to customers prior to the application of any specific distribution fees, rebates, discounts, limited discounts, or other financial agreements with the Contractor’s customers. The delivered price shall be based on f.o.b. destination delivered using standard freight. The delivered price shall exclude all costs that are to be covered in the distribution price. The SPV Contractor warrants that the delivered price to its delivering warehouse of a product sold at any given time by the SPV Contractor to DLA Troop Support customers is identical to the delivered price of such product sold at the same time to its other customers.

(A) Exception: For mandatory source items, the delivered price shall be limited to the nonprofit agency’s price for product as set in accordance with applicable law, plus standard freight.

(B) Exception: A redistributor’s price for a specific manufacturer/grower/private label holder’s product (or stock keeping unit (SKU)) may be used as long as the redistributor’s price for the quantity ordered is equal to or lower than the manufacturer’s/ grower’s/ private label holder’s current price inclusive of Government rebates and discounts (as defined below). Supporting documentation (published price list, manufacturer letter/email, or similar proof of price comparison) may be required. The determination that the supporting documentation is sufficient to establish the manufacturer’s/ grower’s/ private label holder’s current price rests solely with the Contracting Officer.

(C) Exception: Standard freight may not apply to drop shipments and f.o.b. origin pickups.

(ii) The Contractor shall utilize best commercial practices in purchasing its food items under this contract, to include seeking and using competition to the maximum extent practicable for all purchases and purchasing in the most economical order quantities and terms and conditions.

(6) “Distribution Price(s)” means the firm fixed price portion of the Contract Unit price, offered as a dollar amount per unit of issue, rounded up or down to the nearest cent. The distribution price is the only method for the Contractor to bill the Government for all aspects of contract performance other than delivered price; including but not limited to, the performance requirements of the statement of work (SOW) for the applicable SPV solicitation and resulting contract. As detailed above in paragraph (5), delivered price is distinct from and not to be included in the distribution price. For both drop shipments and Government pick-ups, the Contracting Officer may negotiate a reduced distribution price with the Contractor since the Contractor is not handling the product.

(7) “Government rebates and discounts” means all rebates, discounts, and limited discounts designated for the Government, including National Allowance Pricing Agreements (NAPA) discounts, food show discounts, early payment discounts (other than qualifying early payment discounts as defined in the Rebates, Discounts and Price Related Provisions section of the solicitation), and any other rebates, discounts, or similar arrangements designated by the manufacturer/grower/ private label holder or redistributor to be passed to the Government or passed to all customers without specific designation. In accordance with other provisions of the contract (and subject to any applicable exceptions in those provisions), all Government rebates and discounts shall be passed to the Government via a reduced catalog price (i.e. “off invoice”). Any Government rebates and discounts that must be passed to the Government and which cannot be applied as an up-front price reduction must be submitted via check payable to the U.S. Treasury, with an attached itemized listing of all customer purchases by line item to include contract number, call number, purchase order number and contract line item number (CLIN).

(8) “Ordering catalog” means the electronic listing of items and their corresponding Contract unit prices available for ordering under this contract.

(9) “Ordering Week” means from Sunday at 12:01 AM through the following Saturday until midnight (Eastern Time ET, standard or daylight as applicable).

(c) Price adjustments.

(1) General.

(i) All Contract unit prices shall be fixed and remain unchanged until changed pursuant to this clause or other applicable provision of the contract. Only the delivered price component of the Contract unit price is subject to adjustment under this clause. After the first ordering week, if the Contractor’s delivered price changes for any or all Contract unit prices, the Contract unit price shall be changed in the next week’s ordering catalog upon the Contractor’s request, submitted in accordance with paragraph (iii) below, by the same dollar amount of the change in the delivered price, subject to the limitations in paragraph (d). The price change shall be effective at the beginning of the next ordering week. All ordering catalog unit prices computed in accordance with this clause and in effect when an order is placed shall remain in effect for that order through delivery. DLA Troop Support will be charged the Contract unit price in effect at the time of each order regardless of any changes in the unit price occurring in any subsequent ordering week.

(ii) Catalog delivered prices must be reflective of the prime vendor’s last receipt price (the price of the stock most recently received into SPV contractor’s inventory).

(iii) Updates to the delivered price: All notices and requests for new item delivered prices and price changes shall be submitted weekly, no later than [contracting officer fill in time] Eastern Time on [contracting officer fill in day], to be effective in the following ordering week’s ordering catalog prices. The delivered price shall have any and all Government rebates and discounts subtractions made prior to presenting the delivered price to DLA Troop Support. The Contractor shall notify the Contracting Officer of its notice/request in the form of an electronic data interchange (EDI) 832 transaction set. The change notice shall include the Contractor’s adjustment in the delivered price component of the applicable Contract unit price. Upon the Contracting Officer’s acceptance of such EDI 832 price changes in accordance with paragraph (v) below, the price change transaction sets will post in the next week’s ordering catalog and each Contract unit price shall be changed by the same dollar amount of the change in the delivered price in the next week’s ordering catalog.

(iv) All price changes, and catalog contract prices, are subject to review by the Government. The Contracting Officer may at any time require the submission of supporting data to substantiate any requested price change or the requested continuation of the pre-existing price for any item, including prices applicable to prior ordering weeks. Upon notice from the Contracting Officer that supporting data is required, the Contractor shall promptly furnish to the Government all supporting data, including but not limited to, invoices, quotes, price lists, manufacturer/grower/private label holder documentation regarding Government rebates and discounts, and any other substantiating information requested by the Contracting Officer.

(v) Price change requests that the Contracting Officer questions or finds to be inconsistent with the requirements of this clause shall not be posted until the Contracting Officer specifically authorizes the posting. If the Contracting Officer does not notify the Contractor by close of business Eastern Time each [contracting officer fill in day] that a price or a price change request is being questioned or has been found to be erroneous, the price change(s) will post to the ordering catalog effective the beginning of the following ordering week. The posting of updated prices in the ordering catalog, calculated in accordance with this clause, constitutes a modification to this contract. No further contract modification is required to effect this change. Any changes that post to the ordering catalog do not constitute a waiver of any of the rights delineated elsewhere in the contract.

(vi) Should the Contracting Officer determine that, or question whether a price change request contained an erroneous unit price or price change, or cannot otherwise determine the changed price(s) to be fair and reasonable, such as when the changed price(s) is(are) higher than lower delivered prices for items of comparable quality which are reasonably available to the Government or Contractor from other sources, the Contracting Officer will so advise the Contractor, prior to close of business Eastern Time on [contracting officer fill in day]. If the Contracting Officer cannot determine a price fair and reasonable, and the Contracting Officer and the Contractor cannot negotiate a fair and reasonable price, the Contracting Officer may reject any price change and direct in writing that the item in question be removed from the Contractor’s ordering catalog, without Government liability. The Contracting Officer may subsequently remove any such item from the ordering catalog if the Contractor fails to remove it. The Government has the right to procure such removed items from any alternate source of supply, and the failure of the Contractor to supply such item may be considered negatively in any evaluation of performance.

(vii) In the event of a price change not posting or an ordering catalog contract unit price not computed in accordance with this clause, resulting in an incorrectly increased or decreased Contract unit price, upon discovery of such event the Contractor shall promptly notify the Contracting Officer in writing and promptly thereafter correct its ordering catalog and submit a refund including interest for any amounts paid to the Contractor resulting from the erroneous price. In the event of an erroneous price decrease in the ordering catalog, if the contractor can demonstrate to the satisfaction of the Contracting Officer that the error did not result from the fault or negligence of the Contractor, the Contractor may submit a request for equitable adjustment for consideration by the Contracting Officer.

(2) Limitations. All adjustments under this clause shall be limited to the effect on contract unit prices of actual increases or decreases in the delivered prices for material. There shall be no upward adjustment for—

(i) Supplies for which the delivered price is not affected by such changes;

(ii) Changes in the quantities of materials; and

(iii) Increases in unit prices that the Contracting Officer determines are computed incorrectly (i.e. not adhering to the Contract unit price definition in this clause) and/or increases in unit prices that the Contracting Officer determines are not fair and reasonable.

(3) If the Contracting Officer rejects a proposed adjustment for an item because the adjusted unit price cannot be determined fair and reasonable, the Contractor shall have no obligation to fill future orders for such item as of the effective date of the proposed adjustment unless such item is subsequently added to the contract at a Unit Price that is determined fair and reasonable. Alternately, the item may be retained on the catalog at the prior (unadjusted) price for as long as both parties agree to do so.

(d) Upward ceiling on economic price adjustment. The aggregate of contract delivered price increases for each item under this clause during the contract period inclusive of any option period(s) shall not exceed [contracting officer fill in percentage] percent (%) for all items except fresh fruits and vegetables (FF&V) and [contracting officer fill in percentage] percent (%) for fresh fruits and vegetables (FF&V) of the initial contract delivered price, except as provided below:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. In the event the latest actual market price for an item would result in a contract unit price that will exceed the allowable ceiling price under the contract, then the Contractor shall immediately notify the Contracting Officer in writing or via its EDI 832 price change request and separate email no later than the time specified in paragraph (c)(1)(iii) above. With either such notification the Contractor shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the delivered price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill future orders for such items, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing. After evaluation of a requested actual price increase, if the Contracting Officer authorizes the change in the Contract unit price, the Contractor shall submit an EDI 832 price change. The price change shall be posted for the following week’s ordering catalog.

(e) Downward limitation on economic price adjustments. There is no downward limitation on the aggregated percentage of decreases that may be made under this clause.

(f) Examination of records. The Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents and other data, to include commercial sales data, that the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause. Such examination may occur up to twice a year (except as provided for below) until the end of 3 years after the date of final payment under this contract or the time periods specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier. These will normally involve Government selection of a statistically significant sample size of invoices/records to examine based on the number of line items on the specific contract catalog. If an examination of records reveals irregularities, further examinations and/or a larger sample size may be required. In addition to normal examination, the Government may conduct additional examinations at the Contracting Officer's discretion.

(g) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required or authorized by this clause.

(h) Disputes. Any dispute arising under this clause shall be determined in accordance with the “Disputes” clause of the contract.

(End of Clause)

52.216-9065 Economic Price Adjustment – Actual Material Costs For Subsistence Product Price Business Model.

As prescribed at 16.203-4(d)(2)(S-96), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – ACTUAL MATERIAL COSTS FOR DLA TROOP SUPPORT - SUBSISTENCE PRODUCT PRICE BUSINESS MODEL (OCT 2015)

(a) Warranties: For the portion of the schedule that is covered by this economic price adjustment (EPA) clause, the Contractor warrants that --

(1) Contract unit prices covered by this contract do not include allowances for any portion of the contingency covered by this clause; and

(2) All price adjustments invoiced under this contract shall be computed in accordance with the provisions of this clause.

(b) Definitions: As used throughout this clause, the term

(1) “Contract unit price” means the total price per unit charged to DLA Troop Support for a product delivered to DLA Troop Support’s customers. The Contract unit price consists of two components: Product price and distribution price as identified in the schedule of items. The sum of the two component prices shall be rounded to the nearest cent to determine the final Contract unit price.

(2) DLA Troop Support “Manufacturer’s Price Agreement” (MPA) means an agreement between DLA Troop Support and manufacturers which identifies a fixed product price for specific items that will be cataloged by the prime vendor.

(3) “Product price” is the most recent DLA Troop Support MP) price or the most recent manufacturer, grower or private label holder commercial price per unit to the Contractor, exclusive of standard freight.

(i) Exceptions:

(A) Fresh fruits and vegetables (FF&V):

(1) The product is listed in the distribution category for prime vendor fresh fruits and vegetables (FF&V))[contracting officer fill in]; and

(2) It is necessary for the product to be transported into the local market of the importer, as otherwise approved under the contract, from a foreign country because local supply does not exist or it is insufficient to meet demand requirements; and

(3) The importer that establishes the product price is the firm that actually performs the FF&V import service, including, but not limited to: procurement, storage, consolidation, pallets, and palletizing as it applies to the importer’s normal commercial sales, and the importer has comparable commercial sales in the market that is the point of import.

(B) A contiguous United States (CONUS) based manufacturer, grower or private label holder’s product pricing which is a national price inclusive of transportation costs to a Distribution Point shall be supported by documentation and may be considered by the Government on a case by case basis, upon concurrence of the Contracting Officer.

(C) Mandatory source items: The product price shall be limited to the nonprofit agency’s price for product as set in accordance with applicable law. The product price shall be based on f.o.b. origin/nonprofit agency. (Prices set in accordance with applicable law (f.o.b. origin/nonprofit agency.)

(D) Prime vendor table displays/decorations only: For products listed in category [contracting officer fill-in category number] prime vendor table displays/decorations only, the product price shall be based on f.o.b. origin/point of the manufacturer’s distributor because the manufacturer will not sell directly to the prime vendor. This exception must be approved by the Contracting Officer on a case by case basis. Support documentation is required.

(E) A CONUS-based redistributor’s price for a specific manufacturer’s product (also known as a stock keeping unit (SKU)) may be considered by the Government as long as the redistributor’s price for the quantity ordered is equal to or lower than the manufacturer’s published price inclusive of discounts/allowances. This exception must be approved by the Contracting officer on a case by case basis. Support documentation may be required.

(4) “Product allowance” is discounts, rebates, and allowances to be passed on to the Government. In accordance with other provisions of the contract, all discounts, rebates, or allowances on particular items which are reflected in the amounts shown on the face of the manufacture’s, grower’s or private label holder’s invoice (referred to as “off-invoice allowances”) or otherwise given to the Contractor by the manufacturer, grower or private label holder, shall be passed by the Contractor to the Government, in the form of an up-front price reduction. The total of these discounts, rebates, and allowances (or product allowance), shall be reflected via a reduced subsistence total order and receipt electronic system (STORES) price, resulting in a lower invoice price to the customer. Any rebates that must be passed to the Government and which cannot be applied as an up-front price reduction must be submitted via check made to the United States (U.S.) Treasury, attached with itemized listing of all customer purchases by line item to include contract number, call number, purchase order number and contract line-item number (CLIN).

(5) “Distribution price(s)” means the firm fixed price portion of the Contract unit price, offered as a dollar amount per unit of measure, rounded up or down to the nearest cent. The distribution price is the only method for the Contractor to bill the Government for all aspects of contract performance other than product price, including but not limited to, the performance requirements of this Statement of Work (SOW). Product price is distinct from and not to be included in the distribution price. The distribution price may be further segregated into pricing segments covering discrete, solicitation-specific performance requirements.

(6) “Ordering catalog” means the electronic listing of items and their corresponding contract unit prices available for ordering under this contract.

(7) “Ordering month” means from Sunday 12:01 AM of the first full week in a calendar month through the last Saturday 11:59 PM that precedes the Sunday of the first full week in the next calendar month (eastern time (ET), standard or daylight as applicable).

(8) “United States Defense Transportation System (DTS) Ocean Shipping Costs:” DTS ocean transportation costs (for shipping the product from the Prime Vendor’s CONUS facility(s) to the prime vendor’s OCONUS facility(s), aka “point to point” delivery via DTS), shall be excluded from the distribution price. The Defense Transportation System is responsible for point-to-point delivery.

(c) Price adjustments:

(1) General:

(i) All contract unit prices shall be fixed and remain unchanged until changed pursuant to this clause or other applicable provision of the contract. Only the product price component of the Contract unit price is subject to adjustment under this clause. After the first ordering month, if the Contractor’s product price changes for any or all contract unit prices, the Contract unit price shall be changed in the next month’s ordering catalog upon the Contractor’s request, submitted in accordance with paragraph iii below, by the same dollar amount of the change in the Product price, subject to the limitations in paragraph (d). The price change shall be effective at the beginning of the next ordering month. All ordering catalog unit prices computed in accordance with this clause and in effect when an order is placed shall remain in effect for that order through delivery. DLA Troop Support will be charged the Contract unit price in effect at the time of each order regardless of any changes in the unit price occurring in any subsequent ordering month.

(ii) Catalog product prices must be reflective of the prime vendor’s last receipt price (the price of the stock most recently received into the OCONUS inventory). For all distribution categories, when multiple sources are being utilized and more than one manufacturer’s product is receipted prior to a catalog update, the Contractor shall establish the product price based on the mix of invoices received after the previous changes period. The product price would be derived as follows:

Supplier A – {contracting officer fill-in percentage and price}

Supplier B – {contracting officer fill-in percentage and price}

Supplier C – {contracting officer fill-in percentage and price}

Product price = {contracting officer fill-in dollar amount}

(iii) Updates to the product price: All notices and requests for new item product prices and price changes shall be submitted monthly, no later than {contracting officer fill-in time} local Philadelphia, Pennsylvania, United States (U.S.) time one week prior to the first day of the next ordering month, to be effective in the next ordering month’s catalog prices. The product price shall have any and all product allowance subtractions made prior to presenting the product price to DLA Troop Support. The Contractor shall notify the Contracting Officer of its notice/request in the form of an electronic data interchange (EDI) 832 transaction set. The change notice shall include the Contractor’s adjustment in the product price component of the applicable Contract unit price. Upon the Contracting Officer’s acceptance of such electronic data interchange (EDI) 832 price changes in accordance with (v) below, the price change transaction sets will post in the next month’s ordering catalog and each Contract unit price shall be changed by the same dollar amount of the change in the product price in the next month’s ordering catalog.

(iv) All price changes, and catalog contract prices, are subject to review by the Government. The Contracting Officer may at any time require the submission of supporting data to substantiate any requested price change or the requested continuation of the pre-existing price for any item, including prices applicable to prior ordering months. Upon notice from the Contracting Officer that supporting data is required, the Contractor shall promptly furnish to the Government all supporting data, including but not limited to, invoices, quotes, price lists, supplier documentation regarding rebates/allowances, and any other substantiating information requested by the Contracting Officer.

(v) Price change requests that the Contracting Officer questions or finds to be inconsistent with the requirements of this clause shall not be posted until the Contracting Officer specifically authorizes the posting. If the Contracting Officer does not notify the Contractor by close of business local Philadelphia, Pennsylvania, U.S. time on the{contracting officer fill-in day} day immediately following the{ contracting officer fill-in day} that a price or a price change request is being questioned or has been found to be erroneous, the price change(s) will post to the ordering catalog effective the beginning of the following ordering month. The posting of updated prices in the ordering catalog, calculated in accordance with this clause, constitutes a modification to this contract. No further contract modification is required to effect this change.

(vi) Should the Contracting Officer determine that, or question whether, a price change request contained an erroneous unit price or price change, or cannot otherwise determine the changed price(s) to be fair and reasonable, such as when the changed price(s) is (are) higher than lower product prices for items of comparable quality which are reasonably available to the Government or Contractor from other sources, the Contracting Officer will so advise the Contractor, prior to close of business local Philadelphia, Pennsylvania, U.S. time on the {contracting officer fill-in day} immediately following the{contracting officer fill-in day}. If the Contracting Officer cannot determine a price fair and reasonable, and the Contracting Officer and the Contractor cannot negotiate a fair and reasonable price, the Contracting Officer may reject any price change and direct in writing that the item in question be removed from the Contractor’s ordering catalog, without Government liability. The Contracting Officer may subsequently remove any such item from the ordering catalog if the Contractor fails to remove it. The Government has the right to procure such removed items from any alternate source of supply, and the failure of the Contractor to supply such item will be considered a negative instance of performance.

(vii) In the event of a price change not posting or an ordering catalog contract unit price not computed in accordance with this clause, resulting in an incorrectly increased or decreased Contract unit price, the prime vendor shall immediately notify the Contracting Officer in writing and promptly thereafter correct its ordering catalog and submit a refund for any amounts paid to the Contractor resulting from the erroneous price. In the event of an erroneous price decrease in the ordering catalog, if the Contractor can demonstrate to the satisfaction of the Contracting Officer that the error did not result from the fault or negligence of the Contractor, the Contractor may submit a request for equitable adjustment for consideration by the Contracting Officer.

(2) Limitations: All adjustments under this clause shall be limited to the effect on contract unit prices of actual increases or decreases in the product prices for material. There shall be no upward adjustment for --

(i) Supplies for which the product price is not affected by such changes;

(ii) Changes in the quantities of material; and

(iii) Increases in unit prices that the Contracting Officer determines are computed incorrectly (i.e. not adhering to the Contract unit price definition in this clause) and/or increases in unit prices that the Contracting Officer determines are not fair and reasonable.

(d) Upward ceiling on economic price adjustment: The aggregate of contract product price increases for each item under this clause during the contract period inclusive of any option period(s) or tiered pricing period(s) shall not exceed {contracting officer fill-in percentage} (%) {contracting officer fill-in percentage} (%) for fresh fruits and vegetables (FF&V)) of the initial Contract product price, except as provided below:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. In the event the latest actual market price for an item would result in a Contract unit price that will exceed the allowable ceiling price under the contract, then the Contractor shall immediately notify the Contracting Officer in writing or via its EDI price change request and separate email no later than the time specified in paragraph (c)(1)(iii) above. With either such notification the Contractor shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill future orders for such items, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing. After evaluation of a requested actual price increase, if the Contracting Officer authorizes the change in the Contract unit price, the Contractor shall submit the EDI 832 price change. The price change shall be posted for the following month’s ordering catalog.

(e) Downward limitation on economic price adjustments: There is no downward limitation on the aggregated percentage of decreases that may be made under this clause.

(f) Examination of record: The Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents and other data, to include commercial sales data, the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause. Such examination may occur during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.

(g) Final invoice: The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required or authorized by this clause.

(h) Disputes: Any dispute arising under this clause shall be determined in accordance with the “Disputes” clause of the contract.

(End of Clause)

52.216-9066 Economic Price Adjustment – Market Prices – DLA Distribution.

When used: This clause may be included in solicitations and resulting contracts for fiberboard boxes, liners and/or other items identified therein, when: (1) unpredictable increases or decreases in the cost of the items are expected; (2) the changes can be tracked by published market prices to be used for price adjustment purposes; (3) the Contracting Officer considers the use of this clause appropriate; and (4) the requirements of 16.203-2, -3, and -4 are met. This clause is approved for use by DLA Distribution only. See 16.203-4-90(l).

Notes:

1. Paragraphs (b)(1): The Contracting Officer shall insert identification of where the market prices can be found, e.g.: “the “Price Watch: Paperboard/Packaging" table contained in the PPI Pulp & Paper Week Price Watch (an RISI Inc. publication of Pulp & Paper Market News for North America).”

2. Paragraph (b)(1): Contracting Officer shall insert identification of the market price(s) to be used, e.g. :

Linerboard (42-pound (lb.)) Unbleached kraft, East (list $### - $###)

Linerboard (42-lb) Unbleached kraft, West (list $### - $###)

Corrugating medium Semichemical, East (list $### - $###)

Corrugating medium Semichemical, West (list $### - $###)”

(Note: The Contracting Officer shall modify subparagraphs (b)(1)(i), (b)(1)(ii), (b)(4) and (b)(4)(i) if separate regional prices are not applicable.

3. Paragraph (d)(1): Contracting Officer shall fill-in the overall percentage, or the percentage of each contract item price, that is deemed to represent the ordered price of the item(s) as applicable, e.g., “70” percent.

4. Paragraph (d)(4): Contracting Officer shall fill-in the percentage of the increase/decrease threshold for triggering a price increase or decrease band, e.g., “4” percent.

5. Paragraph (e)(1): The Contracting Officer shall fill-in the aggregate annual percentage limitation. This percentage is subject to 10% per annum aggregate limit, unless a higher limit is approved by the Chief of the Contracting Office or designee (see 16.203-3(94)). Such rationale and approval for any ceiling over the 10% per annum limit must be documented in the contract file.

ECONOMIC PRICE ADJUSTMENT – MARKET PRICES – DLA DISTRIBUTION (NOV 2011)

(a) Warranties. The Contractor warrants that:

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingencies covered by this clause.

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this clause.

(b) Definitions. The terms used in this clause are defined below.

(1) The “market prices” specified hereunder are, as a satisfactory measure of price changes in the marketplace, used for price adjustments under this clause. The prices appear in

______________(Note 1)________________

______________(Note 2)________________

(i) The above applicable “East” market prices shall be used to adjust prices under this clause for items delivered to Defense Distribution Center Anniston, Alabama; Defense Distribution Depot Europe; Defense Distribution Center Susquehanna, Pennsylvania; Defense Distribution Center Norfolk, Virginia; Defense Distribution Center New Cumberland, Pennsylvania; and any other required delivery points east of the Mississippi River.

(ii) The above applicable ‘West” market prices shall be used to adjust prices under this clause for items delivered to Defense Distribution Center Hill, Utah, Defense Distribution Center San Joaquin, California; Defense Distribution Center Pearl Harbor, Hawaii; Defense Distribution Center Red River, Texarkana, Texas; and any other required delivery points west of the Mississippi River.

(2) Base market price – The average of the minimum and maximum list prices in United States (U.S.) dollar prices published the week of the contract effective date. If the contract effective date falls in a week when the prices are not published, then the average of the applicable minimum and maximum prices from the preceding week of publication shall be used.

(3) Adjusting market price – The average of the list price ranges specified above for the week in which the unit price(s) are being adjusted. Note: The adjusting market price becomes the base market price for the subsequent adjustment period, if any.

(4) Contract unit price – The contract unit price(s) to be invoiced for product(s) delivered to East and West locations is the sum of the “ordered price” and the “distribution price”:

(i) Ordered Price – The Contractor’s purchase cost for materials delivered to East or West locations. No amount shall be included in the ordered price(s) for any other element of cost or for profit. The ordered price component is subject to increases or decreases in accordance with this clause.

(ii) Distribution Price – The price that represents all the elements of the contract unit price other than the “ordered price”. The distribution price typically consists of the Contractor’s projected labor, general and administrative overhead, packaging costs, transportation costs from the prime vendor’s distribution point to destination, any other projected expenses or overhead associated with prime vendor function, and profit. Profit includes all profit relevant to both the materials costs and distribution costs. The distribution price reflects the difference between the ordered price and the contract unit price.

(5) Base Price – The unit price(s) offered for the item(s) included in the contract award schedule.

(6) Contract Price – means:

(i) The base year total prices and all option year prices shown on the contract schedule page(s) at time of award, or:

(ii) The base year total prices and all option year prices adjusted pursuant to this clause. (Note: price adjustments made to each ordered price component will be applied concurrently to any remaining option year prices.)

(7) Contract effective date – Means the effective date of award of the contract resulting from this solicitation.

(8) Option Year – A one (1) calendar year period consisting of twelve (12) calendar months. The first contract calendar year (base year) shall commence on the contract effective date and shall end 365 days (366 days for a leap year) thereafter. Each succeeding contract calendar year shall commence on the day immediately following the last day of the preceding contract calendar year.

(c) Price Change Notification. Within five calendar days following publication of a market price sufficient to require a price change under this clause, the Contractor shall notify the Contracting Officer in writing of the change and market price upon which the current contract price is based and attach a copy of the market price publication containing such price change.

(d) Limitations. All price adjustments are subject to the limitations set forth in this clause including:

(1) Price adjustments shall be applied only to the ordered price component, which is deemed to represent ___(Note 3)___ percent of the contract unit price for each item.

(2) Contract prices shall be adjusted by the same percentage that the Adjusting market price bears to the Base market price.

(3) When any unit price adjustments under this clause coincide with the exercise of an option period, such adjustments will be authorized separately from the exercise of the option.

(4) Price adjustments under this clause will be made only if the change to the price of a contract item would increase or decrease by (Note 4) percent or more of the current price of a contract line item.

(5) Increased contract unit prices shall not apply to quantities scheduled for delivery prior to the effective date of the increased unit price. The effective date of the increased unit price is the effective date on the contract modification (Standard Form (SF) 30, block 3).

All price adjustments shall be calculated as shown in the following example:

 

Unit

Prices

Baseline

Ordered

Price

(Compute using %

of Unit

Price from

(d)(1)

above)

Baseline

Distribution

Price

Baseline

Market

Price

Current

Market

Price

%

Change

Between

Baseline

And

Current

Market

Price

$ Increase /

Decrease

To Ordered

Price

Adjusted

Ordered

Price

Adjusted

Unit

Price

Sample

Increase

$5.90 =

$4.13

$1.77

140.2

151.7

(+) 8.2%

(+) $0.34

$4.47

$6.24

Sample

Decrease

$5.90 =

$4.13

$1.77

140.2

124.6

(-) 11.13%

(-) $0.46

$3.67

$5.44

Sample Increase Sample Decrease

Latest Market Price: 151.7 Latest Market Price: 124.6

Previous Market Price: 140.2 Previous Market Price: 140.2

(+) 11.5 (-) 15.60

% Change: 11.5 / 140.2 = (+) 8.2% % Change: 15.6 / 140.2 = (-) 11.13%

(e) Upward Ceiling On Economic Price Adjustment.

(1) The Contractor agrees that the total increase in any contract item’s unit price pursuant to the provisions of this clause shall not exceed (Note 5) percent per annum of the item’s unit price at the inception of each contract year, except as provided under paragraph (e)(3).

(2) If at any time, the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(3) If an actual increase in a market price would raise a contract unit price for an item above the current ceiling, the Contracting Officer may issue a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(4) There is no percentage limit on downward adjustments under this clause.

(f) Revision of the market price. In the event---

(1) any applicable market price indicator is discontinued or its method of derivation is altered substantially, or

(2) the Contracting Officer determines that the market price indicator consistently and substantially fails to reflect market conditions the parties shall mutually agree upon an appropriate substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(g) Contract Modifications. Price adjustment(s) pursuant to this clause shall be incorporated by a modification signed by the Contractor and the Contracting Officer. The modification shall be issued:

(1) within thirty (30) calendar days of the date of request by the Contractor and shall set forth the unit price(s) as adjusted in accordance with this clause to establish the new contract price(s),

(2) shall adjust the unit prices of any delivery orders issued during and following this 30 day period, and

(3) if the adjustment results in a decrease to the unit price(s) of any delivery orders issued during this 30 day period, the Contractor shall submit a credit memorandum in the amount of the decrease within 30 days of the date of the Modification. The credit will be applied to subsequent invoices.

(h) Final invoice. The Contractor shall include a statement on the final invoice for each contract year that amounts invoiced under this contract reflect all decreases required by this clause.

(i) Disputes. Any disagreement arising under this clause shall be resolved in accordance with the “Disputes” clause of the contract.

(End of Clause)

52.216-9067 Economic Price Adjustment - Liquid Propane Gas – DLA Distribution.

As prescribed in 16.203-4-90(l)(8), use the clause in contracts for procurement of liquid propane gas (LPG) by DLA Distribution only.

ECONOMIC PRICE ADJUSTMENT LIQUID PROPANE GAS – DLA DISTRIBUTION

(JAN 2013)

(a) Warranties. The Contractor warrants that –

(1) The unit prices set forth in the schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provision of this clause.

(b) Definitions. As used throughout this clause-

(1) The term "base price" means-

(i) The unit price offered for an item and included in the contract award schedule at time of award

(2) Market price means a price determined by an independent trade association, governmental body, or other third party and reported or made available in a consistent manner in a publication, electronic data base, or other form. This price may be either a single market price or a combination of market prices for price adjustment for individual items by product, market area, and publication as specified in paragraph (f) below.

(3) The term "base market price" means the preselected market price for an item as published on [Note 1] in the publication specified in paragraph (f).

(4) The adjusting market price means the average price listed in the publication specified in paragraph (f) immediately preceding the date of adjustment.

(c) Adjustments. The Contracting Officer shall issue a modification to the contract to reflect any price change pursuant to this clause. The Contract price shall be adjusted at the initial date of performance only if the change between the market price at the start of performance and the base market price equals 5% (positive or negative) or more of the contract price. Price changes thereafter shall be no more frequent than every two weeks. Therefore, after the initial date of performance, the difference between the current market price and the base market price will be determined on a weekly basis, providing there has not been a price adjustment in the prior week (in which case no adjustment would be applicable). The Contract price will be changed by this difference, (positive or negative), at any time the adjustment from the current price to the newly adjusted price (positive or negative) is determined to equal 5% or more of the base price. Price changes will be formally issued in a contract modification which will be effective on the fourth business day immediately following the date of the publication used for the adjusting market price. For example, if the adjusting market price was published on a Monday, the effective date of the price change would be the Friday of that same week.

(1) Calculations. The prices payable under this clause shall be determined by adjusting the award price by the same number of cents, or fraction thereof that the market price increases or decreases, per like unit of measure, no more than every two weeks, providing that such an adjustment would result in a 5% or more change between the base price and the adjusted contract price. All arithmetical calculations, including the final adjusted unit price shall be rounded to the nearest thousandth of a cent. For example, if performance started January 1, the contract award price is $2.00 and if the base market price on the base reference date is 150.000 cents, and the adjusting market priceimmediately preceding the performance period is 160.000 cents, the contract price shall increase by 10.000 cents $2.10 at the start of the performance period. If the adjusting market price was 155.000 cents instead of 160.000, there would be no adjustment, since the difference between the adjusting market price and the base market price is less than 5% of the base price. All calculations in this example are purely hypothetical, and not based on any actual dates or prices.

(2) Revision of published market price indicator. In the event--

(i) Any applicable market price is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the market price indicator consistently and substantially failed to reflect market conditions,-

the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with the Disputes clause of the contract.

(3) Failure to deliver. Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor's failure to deliver according to the delivery schedule results from causes beyond the Contractor's control and without its fault or negligence, within the meaning of the Default clause of this contract, in which case the Contract shall be amended to make an equitable extension of the delivery schedule.

(4) Upward ceiling on economic price adjustment. The Contractor agrees that the total increase in any Contract unit price pursuant to these economic price adjustment provisions shall not exceed [Note 2] percent of the award price in any applicable program year (whether a single year or a multiyear program), except as provided hereafter. This [Note 2] percent is not cumulative for each program year, and instead is applied to the price in effect at the beginning of each program year, through the end of that program year.

(i) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the market price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(d) Examination of records. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(e) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(f) Publication, product, and location. The average of the high and low in Butane Propane News’ (BPN's) Weekly Propane Newsletter, Propane Prices Update, Spot Prices for Natural Gas Liquids, at Mont Belvieu (not LDH) shall be used to calculate each four week average specified above. These prices measure the general rate and direction of price movement for this commodity within a market. This does not indicate a mandatory source of supply or area where bidders must obtain supplies.

(End of Clause)

Note 1: Requires contracting officer to fill in the appropriate base market price date in paragraph (b)(3). This date should be no later than the date of final proposal revisions.

Note 2: The contracting officer must also fill in the percentage applicable in (c)(4), as determined in accordance with 16.203-3-90 and local procedures.

52.216-9068 Economic Price Adjustment – Published Market Price -Electricity – Heat Rate.

As prescribed at 16.203-4(a)(2)(99), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – PUBLISHED MARKET PRICE - ELECTRICITY – HEAT RATE (NOV 2011)

(a) Warranties. The Contractor warrants that--

(1) The award price set forth in the Schedule does not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause, the term--

(1) Adjusting market price means the market price to be used in calculating an economic price adjustment to arrive at the updated contract price for a given delivery month. Adjusting market prices are established two possible ways:

(i) In the fixed price trigger schedule attachment, there are trigger floors and trigger ceilings for specified volumes within each delivery month. If the [contracting officer fill-in applicable market index] natural gas price reaches either the trigger floor or the trigger ceiling for a specified volume, the adjusting market price is the trigger floor or trigger ceiling for that volume.

(ii) If neither the Trigger floor nor trigger ceiling prices are met for a given trigger volume, the adjusting market price of natural gas for all remaining volumes contained in the fixed price trigger schedule for the delivery month will be the [contracting officer fill-in applicable market index] final settlement price for that delivery month.

(2) Award price means the sum of the block energy adder and the product of the heat rate and the initial market price expressed in dollars per megawatt hour.

(3) Base (7X24) block energy means a block of electricity that covers electricity usage 7 days a week, 24 hours a day.

(4) Block energy adder is a fixed service fee, expressed in dollars per megawatt hour, that should cover all overhead and costs not included in the heat rate/market index component of the Contractor’s price. At a minimum, the adder is expected to cover the Contractor’s wholesale transmission, losses, ancillaries, intra- and inter-zonal congestion, and scheduling.

(5) Delivery month means the period between meter readings, as set forth in the statement of work.

(6) Heat rate means the measurement of the efficiency with which heat can be used to produce electricity. Specifically, it is the number of British thermal units required to produce one kilowatt hour of electricity. Under this solicitation, the heat rate for base (7x24) block energy is [contracting officer fill-in applicable heat rate] and the heat rate for on-peak (5x16) block energy is [contracting officer fill-in applicable heat rate].

(7) Initial Market Price means the market price for [contracting officer fill-in applicable market index] natural gas at time of award, expressed in dollars per British thermal units, as published by [contracting officer fill-in applicable publication].

(8) Market index is [contracting officer fill-in applicable publication and market index] natural gas.

(9) Market Price is the price for [contracting officer fill-in applicable market index] natural gas, expressed in dollars per British thermal units, as published by [contracting officer fill-in applicable publication].

(10) On-peak (5X16) Block Energy means a block of electricity that covers a customer’s electricity usage Monday through Friday, 5 days a week, 16 hours a day. Peak hours are [contracting officer fill-in applicable peak hours], as defined by the [contracting officer fill-in applicable ISO/RTO].

(11) Settlement Price for a given delivery Month means the [contracting officer fill-in applicable market index] natural gas contract price as of three business days prior to the first calendar day of that delivery month. Where a delivery month begins in one month (Month 1) and ends in the subsequent month (Month 2), the [contracting officer fill-in applicable market index] natural gas contract price as of three business days prior to the first calendar day of Month 2 will be used.

(12) Trigger means a pre-established floor or ceiling natural gas market price for a given volume of natural gas for a specified delivery month. (See the fixed price trigger schedule attachment).

(13) Trigger ceiling means the highest price for a specified volume contained in the fixed price trigger schedule. Where a ceiling is triggered for a given volume, the adjusting market price for that volume is locked in at the ceiling price, unless an exception specified in the statement of work applies.

(14) Trigger floor means the lowest price for a specified volume contained in the fixed price trigger schedule. Where a floor is triggered for a given volume, the adjusting market price for that volume is locked in at the floor price, unless an exception specified in the statement of work applies.

(15) Updated contract price means the sum of the block energy adder and the product of the heat rate and weighted adjusting market price expressed in dollars per megawatt hour.

(16) Upward ceiling means the highest allowable differential between the award price and an updated contract price.

(17) Weighted adjusting market price (WAMP) means the average of all triggered and/or settled adjusting market prices weighted by British Thermal units, for each delivery month expressed in dollars per MMBTU.

(c) Adjustments. The contract prices for electricity delivered in a given delivery month will be updated by inserting the WAMP for that month utilizing the formulas below.

Updated Contract PriceB = (Heat RateB * Weighted Adjusting Market Price) + Block Energy AdderB

Updated Contract PriceP = (Heat RateP * Weighted Adjusting Market Price) + Block Energy AdderP

Where the subscript B denotes Base (7X24) Block Energy and the subscript P denotes On-peak (5X16) Block Energy.

The heat rates and block energy adders are fixed for the contract term, while the WAMP component varies with the market based upon either the pre-established triggers set forth in the fixed price trigger schedule or the published [contracting officer fill-in applicable publication and market index] settlement price, as defined above.

(d) Calculations. All calculations shall be rounded to five decimal places.

(e) Failure to deliver. Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions – Commercial Items clause of this contract, in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(f) Upward ceiling on economic price adjustment. The Contractor agrees that in any delivery month of the contract term, the total increase in any base or on-peak updated contract price, pursuant to these economic price adjustment provisions, shall not exceed [contracting officer fill-in applicable upward ceiling] of the value of the award price.

Except as provided hereafter--

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract upward ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised upward ceiling which the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the established Market price would raise an updated contract price for an item above the current upward ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the Upward Ceiling. If the contract Upward Ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(g) Revision of market index indicator. In the event that--

(1) Any applicable market index indicator is discontinued or its method of derivation is altered substantially; or

(2) The Contracting Officer determines that the market index indicator consistently and substantially fails to reflect market conditions,-the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the Contract Terms And Conditions – Commercial Items clause of this contract.

(h) Examination of records. The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(End of Clause)

52.216-9069 Economic Price Adjustment – Published Market Price – DLA Energy Domestic Bulk.

As prescribed at 16.203-4(a)(2)(98), insert the following clause:

ECONOMIC PRICE ADJUSTMENT -- PUBLISHED MARKET PRICE - DLA ENERGY DOMESTIC BULK (NOV 2011)

(a) Warranties. The Contractor warrants that—

(1) The base unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause, the term—

(1) Base unit price means the unit price set forth opposite the item in the Schedule.

(2) Market price means the price to be used in determining an economic price adjustment of the base unit price of an individual product for the market area and time period specified in this clause. The market price is derived from quotes, assessments, or sales prices in the market place for one or several items or commodity groups as reported in a consistent manner in a publication, electronic data base, or other form, as determined by an independent trade association, governmental body, or other third party independent of the Contractor.

(i) Base market price means the price as shown in Column V of the table below, which is the market price from which economic price adjustments are calculated pursuant to this clause.

(ii) Adjusting market price means the market price for deliveries during the most recent period, as defined in the table below.

(3) Date of delivery is defined as follows:

(i) For tanker or barge deliveries.

(A) Free on board (f.o.b.) origin. The date and time vessel commences loading.

(B) F.o.b. destination. The date and time vessel commences discharging.

(ii) For pipeline deliveries. The date and time product commences to move past the specified f.o.b. point.

(iii) For all other types of deliveries. The date product is received.

(c) Adjustments.

(1) Subject to the provisions of this clause, the price payable shall be the base unit price in effect on the date of delivery increased or decreased by the same number of cents, or fraction thereof, that the adjusting market price applicable at date of delivery increases or decreases, per like unit of measure, from the base market price.

(2) Calculations. All calculations shall be rounded to six decimal places.

(3) Modifications. Any resultant price changes to the base market price and base unit price shall be executed by the Contracting Officer through a weekly price adjustment modification effective each Tuesday.

(4) Failure to deliver. Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions - Commercial Items clause of this contract, in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(5) Upward ceiling on economic price adjustment. The Contractor agrees that the total increase in any contract unit price, pursuant to these economic price adjustment provisions shall not exceed (Note 1) percent of the original base unit price in any applicable program year (whether a single year or multiyear program), except as provided hereafter.

(i) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling which the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the established market price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(6) Revision of market price indicator. In the event—

(i) Any applicable market price indicator is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the market price indicator consistently and substantially fails to reflect market conditions,-the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the Contract Terms And Conditions - Commercial Items clause of this contract.

(d) Conversion factors. If this clause requires quantity conversions for economic price adjustment purposes, the conversion factors for applicable products, as specified in the DLA Energy conversion factor instruction, apply unless otherwise specified in the Schedule.

(e) Examination of records. The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(f) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(g) Table.

I. Heading under which market indicator is published

II. Base market price

III. Location where market price is applicable (excludes all taxes)

IV. Item number/ Name of product

V. Name of Publication

(see note(s) below)

(Notes - fill-in)

(End of Clause)

Note 1: The Contracting Officer shall complete the percentage as required in 16.203-4(a)(2)(XX)

Note 2: The Contracting Officer shall complete the table after coordinating with the Market Research Division.

Note 3: Method(s), and time period(s) for calculating the market price(s), as exemplified below:

For Platts Oilgram: "Note: The East/Gulf Coast adjusting market price will be firm for weekly periods and is defined as the average of the applicable daily Platts spot assessment quotations effective for the prior week. The simple average of the daily average highs and lows of the prices effective Monday through Friday (excluding any days prices that are not published) shall be the adjusting market price effective for the following Tuesday through Monday."

For Oil Price Information Service: "Note: The Rocky Mountain adjusting market price will be firm for weekly periods and is defined as the Oil Price Information Service Publication applicable weekly quotations effective for the prior week. The simple average of the highs and lows of the prices effective the prior week shall be the adjusting market price effective for Tuesday through Monday."

(End of Clause)

52.216-9070 Economic Price Adjustment – Daily Market Price Indicators (Ships’ Bunkers).

As prescribed at 16.203-4(a)(2)(103), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – DAILY MARKET PRICE INDICATORS (SHIPS’ BUNKERS) (JUL 2010)

(a) Warranties: The Contractor warrants that--

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this clause.

(b) Definitions: As used throughout this clause, the term--

(1) Award price means the original contract price.

(2) Reference price means the market price indicator set forth in the Table in (f) below with which the award price is to fluctuate.

(i) Base reference price means the market price indicator shown in the Table in (f) below and is the reference price from which economic price adjustments are calculated pursuant to this clause. This price will be expressed as Base Ref. Price in any price adjustment notification issued through contract modifications and/or postings to the web page under the heading Vendor Resources and then Product Price Adjustments. The base reference date annotated in the Table shall remain unchanged throughout the life of the contract.

(ii) Adjusting reference price means the market price indicator in effect on the date of delivery, used to determine the change in reference price. In the event one or more applicable reference prices are not (or were not) published, then the term adjusting reference price means the market price indicator for an item as published on the date nearest in time on or prior to the effective calendar date as expressed in (4) below. It is annotated as New Ref. Price in any Price Adjustment (PA) modification issued.

(3) Current unit price means the price in effect for the day that the price adjustment provisions discussed in paragraph (c) below begin. This price, expressed as Latest Unit Price in any price adjustment notification issued through contract modifications and/or postings to the web page under the heading Vendor Resources and then Product Price Adjustments, shall be the unit price charged to the Government for supplies delivered under the contract.

(4) Date of delivery means the date and time product is received by the requesting activity/ vessel. This is shown by signature of receipt by the Government representative for the entire delivery. A single delivery that began on one date and ended on another date shall be considered as received on the date of completion annotated by the Government on the bunker delivery document. Excusable delays in delivery shall be handled on a case-by-case basis by the Contracting Officer.

(5) Calendar week means a consecutive seven-day period, beginning with Monday, unless otherwise specified in (c)(1) below.

(6) Published means issued in either print or electronic format by the service designated to be employed as an escalator, unless otherwise specifically stated. In the event of a conflict between the prices set forth in the print version and those set forth in the electronic version for the same date, the electronic version shall prevail, unless otherwise specified in (c)(1) below.

(c) Adjustments: The prices payable under this contract shall be the award price increased or decreased by the amount that the reference price shall have increased or decreased as of the date of delivery. The amount of increase or decrease in the award price shall be based on the same number of cents, or fraction thereof, that the reference price increases or decreases per like unit of measure.

(1) Day of publication: The adjusting reference price in effect on the date of delivery shall be that item's reference price effective (and normally published) on the date in which the delivery is made, or, in the event there is no publication on that day, it shall be the item's reference price as last previously published prior to that date.

Note: Platts issues corrections to its published prices on a regular basis. Platts posts corrections to its website (http://www.platts.com) for its subscribers. If a correction to a reference price is found on the Platts website, all of the items that use that reference price will be corrected. will correct any other reference prices, as notice of the correction is received. will work with the pricing services to determine the appropriate price, whenever an offeror or Contractor can show that the price referenced should be reviewed.

(2) Calculations:

(i) If averages are published within a given publication, then these averages will be used.

(ii) For prices in U.S. gallons, if averages are not available within a given publication, calculated averages, carried to six decimal places, rounded, will be used. For prices in metric tons, if averages are not available within a given publication, calculated averages, carried to two decimal places, rounded, will be used. For domestic contract line items, conversions from metric tons to gallons shall be utilized through the conversion factors clause for the applicable publication reference product. Barrels shall be converted using the conversion factors instruction for barrels to gallons. If this clause requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the Conversion Factor Instruction, apply unless otherwise specified in the Schedule in the Table (f) below. Details on the specific products covered and the method of conversion can be found in Instruction M55 ( MAR 2007), which is included in solicitations and resulting contracts when conversion factors are required.

(iii) For domestic contract line items, the final calculated reference price, as well as any intermediary arithmetical calculations, will consist of a number including six decimal places, rounded. For overseas contract line items, the final calculated reference price, as well as any intermediary arithmetical calculations, will consist of a number including two decimal places, rounded.

(iv) For domestic contract line items, the final adjusted unit price will always consist of a number including six decimal places, rounded. For overseas contract line items, the final adjusted unit price will always consist of a number including two decimal places, rounded.

(3) Failure to deliver: Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions – Commercial Items clause of this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(4) Upward ceiling on economic price adjustments: The Contractor agrees that the total increase in any contract unit price shall not exceed {contracting officer fill-in applicable upward ceiling}____________ percent (%) of the award price, except as provided hereafter:

(i) If, at any time, the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with an appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(5) Revision of reference price: In the event--

(i) Any applicable reference price (market price indicator) is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on or just prior to the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. Failure to agree on an appropriate substitute shall be considered a “dispute” within the meaning of paragraph (d), Disputes, of the Contract Terms And Conditions -- Commercial Items clause of the contract.

(d) Examination of records: The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, and other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(e) Final invoice: The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(f) Table: The following publication(s)/date(s) apply: {contracting officer fill-in of applicable information}.

Note to contracting officer: - select one of the following choices:

(1) Insert the following table when the solicitation does not contain numerous items:

Base reference Base reference Base reference Base reference

Item no. publication heading date price

or

(2) (at Contracting Officer’s discretion) Insert for Ships’ Bunker programs when the solicitation is for a major program buy:

“See the continuation pages to this clause at Attachment C for a listing of each line item, the applicable publications for each line item, as well as the applicable reference heading, base reference date and base reference price.”

The Contracting Officer shall insert the appropriate table at Attachment C.

(End of Clause)

52.216-9071 Economic Price Adjustment – Market Price – Posts, Camps, and Stations (PC&S) – Korea/Guam/Japan.

As prescribed at 16.203-4(a)(2)(100), insert the following clause:

ECONOMIC PRICE ADJUSTMENT - MARKET PRICE - POSTS, CAMPS, AND STATIONS (PC&S) KOREA/GUAM/JAPAN (NOV 2011)

(a) Warranties. The Contractor warrants that—

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause, the term—

(1) Base unit price means the unit price set forth opposite the item in Section B of the Schedule.

(2) Market price means a price determined by an independent trade association, governmental body, or other third party and reported or made available in a consistent manner in a publication, electronic data base, or other form. This price may be either a single market price or a combination of market prices for price adjustment for individual items by product, market area, and publication as specified in the Table in (g) below. For purposes of this procurement, the market price is the average of the prices published in Platt's Oilgram Price Report. The applicable market price is identified by product following the Table in (g) below.

(i) Base market price means the price as shown in column IV of the Table in (g) below and is the market price from which economic price adjustments are calculated pursuant to this clause.

(ii) Adjusting market price means the market price in effect on the date of delivery and that will be used to determine the change in market price as defined in (c)(1) below.

(3) Date of delivery is defined as follows:

(i) For free on board (f.o.b.) destination truck deliveries. The date product is received, on a truck-by-truck basis.

(ii) For all other types of deliveries. The date and time product commences moving past the specified f.o.b. point.

(c) See Note 1.

(1) Subject to the provisions of this clause, the prices payable hereunder shall be determined by adding to the base unit price the same number of cents, or fraction thereof, that the adjusting market price increases or decreases, per like unit of measure, subsequent to the date on which the base market price is established (see column IV of the Table). The prices payable shall be issued through semimonthly contract notifications effective the first and third Monday of each month.

(2) Contract price adjustments shall be provided via notification through contract modifications and/or posting to the web page under the heading Vendor Resources and then Product Price Adjustments.

(3) All arithmetical calculations, including the final adjusted unit price, shall be rounded to four decimal places.

(4) Failure to deliver. Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions - Commercial Items clause of this contract, in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(5) Upward ceiling on economic price adjustment. The Contractor agrees that the total increase in any contract unit price, pursuant to these economic price adjustment provisions, shall not exceed See Note 2____ percent of the base unit price in any applicable program year (whether a single year or a multiyear program), except as provided hereafter.

(i) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with an appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the market price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(6) Revision of market price indicator. In the event—

(i) Any applicable market price indicator is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the market price indicator consistently and substantially fails to reflect market conditions,-the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), disputes, of the Contract Terms And Conditions - Commercial Items clause of this contract.

(d) Conversion factors. If this clause requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the Conversion Factor Instruction, apply unless otherwise specified in the Schedule.

(e) Examination of records. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, and other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(f) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(g) Table.

I II III IV

Heading under which market price is published and

Base market price

Name of publication

as of ____________

Item no. (see (b)(2) above) name of product (date of publication)

(see note 3)

(End of Clause)

Note 1: The Contracting Officer shall insert the following:

(For Korea and Guam only):

(c) Adjustments.

(For Japan only):

(c) Adjustments. For products delivered by barge or tanker, the Contractor shall notify the Contracting Officer of any delivery and associated change in the adjusting market price within 15 days from the date thereof. For products delivered via other modes (TT, TW, etc.), price adjustments shall be semimonthly and shall occur on the first and third Monday of each month. No increase in a contract unit price for barge or tanker deliveries shall be executed pursuant to this provision until the increase in the applicable adjusting market price has been verified by the Contracting Officer.

Note 2: The Contracting Officer shall insert the appropriate ceiling percentage in paragraph (c)(4) as determined by the Chief of the Contracting Office or designee (reference note 2 of the clause). Explicit approval must be obtained for any ceiling exceeding ten (10) percent in accordance with DLAD 16.203-3 (94).

Note 3: The Contracting Officer shall coordinate with the Market Research Section (DESC-RN) before completion of fill in the blank information sections of the clause such as base market, and publication dates, to ensure the accuracy of the information and the correct selection of the market price.

52.216-9072 Economic Price Adjustment - Petroleum Product Price , Post, Camp, and Station (PC&S).

As prescribed at 16.203-4(a)(2)(101), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – PETROLEUM PRODUCT PRICE, POST, CAMP AND STATION (PC&S) (NOV 2011)

(a) Warranties: The Contractor warrants that—

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced hereunder shall be computed daily in accordance with the provisions of this clause.

(b) Definitions: As used throughout this clause, the term--

(1) Base price means—

(i) The unit price offered for an item and included in the contract award schedule; or

(ii) During any subsequent program year, either the effective contract price as of the start of the subsequent program year, or the price agreed upon as of the start of the subsequent program year.

(2) Base reference price means the reference price for an item as published on__________. In the event one or more applicable reference prices are not (or were not) published on the date shown, then the term base reference price means the reference price for an item as published on the date nearest in time prior to the date shown.

(3) Reference price means that published reference price or combination of published reference prices for price adjustment of individual items by product, market area, and publication as specified in (f) below.

(4) Date of delivery means—

(i) For tanker or barge deliveries.

(A) Free on board (f.o.b.) origin: The date and time vessel commences loading.

(B) F.o.b. destination: The date and time vessel commences discharging.

(ii) For all other types of deliveries: The date product is received on a truck-by-truck basis.

(5) Published means issued in either printed or electronic format by the service designated to be employed as an escalator, unless otherwise specifically stated. In the event of a conflict between the price set forth in the print version and those set forth in the electronic version for the same date, the electronic version shall prevail unless otherwise specified in (c) below.

(c) Adjustments: Contract price adjustments shall be provided via notification through contract modifications and/or posting to the web page under the heading Vendor Resources and then Product Price Adjustments to reflect any price change pursuant to this clause.

(1) Calculations: The prices payable hereunder shall be determined by adjusting the award price by the same number of cents, or fraction thereof, that the daily reference price increases or decreases, per like unit of measure. All arithmetical calculations, including the final adjusted unit price, shall be carried to six decimal places.

Oil price information service (OPIS): For all items employing OPIS, the reference price in effect on the date of delivery shall be the end of day OPIS rack average effective (6:00 p.m. timestamp) that day. In the event there is no price published for date of delivery, then it shall be the item’s reference price that was last in effect.

Other publications: Except for items employing OPIS, the reference price in effect on the date of delivery shall be that item's preselected reference price that is in effect the date of delivery. In the event there is no price published for date of delivery, then it shall be the item’s reference price that was last in effect.

(2) Revision of published reference price: In the event—

(i) Any applicable reference price is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions—

the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on the date the reference price was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the Contract Terms And Conditions - Commercial Items clause of this contract.

(3) Failure to deliver: Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions - Commercial Items clause of this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(4) Upward ceiling on economic price adjustment: The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed ____________ percent (%) of the of the base price in any applicable program year, except as provided below.

If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with an appropriate explanation and documentation as required by the Contracting Officer.

If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(d) Examination of records: The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(e) Final invoice: The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(f) Publications. The following publication(s) is (are) used:

(End of Clause)

52.216-9073 Economic Price Adjustment – Petroleum Product Market Price, Post, Camp, and Station (PC&S) Belgium.

As prescribed at 16.203-4(a)(2)(102), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – PETROLEUM PRODUCT MARKET PRICE, POST, CAMP, AND STATION (PC&S) BELGIUM (JUN 2010)

(a) Warranties: The Contractor warrants that—

The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

The prices to be invoiced hereunder shall be computed in accordance with the provisions of this clause.

(b) Definitions: As used throughout this clause, the term—

Award price means the unit price set forth opposite the item in the Schedule. The award price consists of the market price (the official posted Belgium government product price (see (2) below) less applicable taxes and duties (as specified in the Tax Relief clause), and the firm rebate.

Market price for all products (including fuel oils, gasoline, and diesel products) means the current applicable official Belgium Government price as published in “Officieel tarief van de aardolieprodukten.” The current applicable official Belgium Government price as published in “Officieel tarief van de aardolieprodukten” sets the maximum price that can be charged for the specified petroleum products referenced in this clause. For deliveries of Fuel Oils at and over 2,000 liters, the official Belgium Government price will be the gasoil chauffage camion (a partir de 2000 L) (excluding all applicable duties/taxes, e.g., Excise Duties/Fuel Oil/U.S. Government NATO Exemption taxes) and a firm fixed rebate that is deducted from the official Belgium Government price. For deliveries of Fuel Oils under 2,000 liters, the official Belgium Government price will be the gasoil chauffage (moins de 2000 L) (excluding all applicable duties/taxes, e.g., Excise Duties/Fuel Oil/U.S. Government NATO Exemption taxes) and a firm fixed rebate that is deducted from the official Belgium Government price. For deliveries of Gasoline, the official Belgium Government price will be the PRIX A LA POMPE Essence Super 95 RON - 10S (excluding all applicable duties/taxes, e.g., Excise Duties/Fuel Oil/U.S. Government NATO Exemption taxes) and a firm fixed rebate that is deducted from the official Belgium Government price. For deliveries of Diesel the official Belgium Government price will be the PRIX A LA POMPE Diesel 10S (excluding all applicable duties/taxes, e.g., Excise Duties/Fuel Oil/U.S. Government NATO Exemption taxes) and a firm fixed rebate that is deducted from the official Belgium Government price.

Date of delivery means the date and time of product delivery completion via the method of delivery specified in the Schedule.

(c ) Adjustments:

Notification: The Contractor shall notify by facsimile or letter within five calendar days of any official price change issued by the Belgium Government in the “Officieel tarief van de aardolieprodukten.” The notification shall be accompanied by a copy of the document showing the new market price.

Subject to the provisions of this clause, the prices payable hereunder shall be the market price incorporated into the contract less applicable taxes and duties, and the firm rebate.

The Contracting Officer shall, pursuant to the provisions of this clause, issue a contract notification to incorporate the new market price, effective on the publication date of such market price.

Contract price adjustments shall be provided via notification through contract modifications and/or posting to the web page under the heading Vendor Resources and then Product Price Adjustments.

(d) Upward ceiling on economic price adjustment:

The Contractor agrees that the total increase in any contract unit price shall not exceed ___ percent (%) of the award price during the first program year or of the unit price in effect as of the start of any subsequent program year (if this is a long-term or multiyear program), except as provided hereafter:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for the item(s), the Contractor shall promptly notify the Contracting Officer in writing of the estimated effective date and the amount of the expected increase. The notification shall include a revised ceiling sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the market price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract will not be modified, the Contracting Officer shall promptly notify the Contractor in writing that the ceiling will not be raised.

(e) Revision of market price indicator: In the event—

(1) Any applicable market price is discontinued or its method of derivation is altered substantially; or

(2) The Contracting Officer determines that the market price indicator consistently and substantially failed to reflect market conditions. The parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the Contract Terms And Conditions - Commercial Items clause of this contract.

(f) Failure to deliver: Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions -- Commercial Items clause of this contract, or is the result of an allocation made in accordance with the terms of the Allocation clause of this contract, in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(g) Examination of records: The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, and other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(h) Final invoice: he Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(End of Clause)

52.216-9074 Economic Price Adjustment - Market Price And Actual Transportation Cost (Natural Gas) Alaska.

As prescribed at 16.203-4(a)(2)(104), insert the following clause:

ECONOMIC PRICE ADJUSTMENT -- MARKET PRICE AND ACTUAL TRANSPORTATION COST - NATURAL GAS - ALASKA (JUN 2010)

(a) Warranties. The Contractor warrants that—

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this clause.

(b) DEFINITIONS. As used in this clause, the term—

(1) Contract unit price is the market price based on a fixed percentage of the ENSTAR Natural Gas Company’s current approved and published Enstar natural gas cost adjustment tariff rate on file with the regulatory commission of Alaska, expressed in dollars per thousand cubic feet (MCF). All other Enstar applicable tariff components (transportation, regulatory fees, company use gas, etc.) will be passed through at cost. Customer service charges and meter fees imposed by Enstar Natural Gas Company, as permitted by the tariff, will be considered pass-through utility charges.

(2) Local Distribution Company (LDC) means the local public utility operating in a franchised area without competition that transports gas over its own distribution lines from its interconnection points with an interstate or intrastate pipeline to customers.

(3) Market price indicator is the Enstar natural gas cost adjustment tariff rate on file with the regulatory commission of Alaska.

(c) Price adjustments. The contract unit price will be changed only as a result of a revision of the Enstar Natural Gas Cost Adjustment tariff rate. If the ENSTAR Natural Gas Cost Adjustment is revised, the fixed percentage stated in the contract schedule page shall be applied to the revised Gas Cost Adjustment to obtain the new contract unit price.

(1) Calculations. All numbers used in or derived through calculations prescribed by this clause shall be rounded to four decimal places.

(2) Upward ceiling on economic price adjustments.

(i) The Contractor agrees that any increase in the contract unit price pursuant to this clause shall not exceed __(Contracting Officer fill-in see Note 1)_percent of the contract unit price effective at time of award. If market conditions warrant, the Government may institute a contract ceiling increase.

(ii) If, at any time, the Contractor has reason to believe that within the near future an increase in the ENSTAR Natural Gas Company’s Adjustment tariff rate would raise the contract unit price above the current ceiling, the Contractor shall notify the Contracting Officer of the expected increase. At the same time, the Contractor shall propose a revised ceiling sufficient to permit completion of remaining contract performance. The Contractor’s proposal shall be supported by appropriate explanations and documentation as required by the Contracting Officer.

(iii) If an actual increase in the market price would raise the contract unit price above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders, as of the effective date of the increase, until the Contracting Officer notifies the Contractor that the ceiling will or will not be raised. In the case where the Contractor receives confirmation that the ceiling will be raised, the Contractor is required to continue performance.

(3) Revision of market price indicator. If the applicable market price indicator is discontinued, its method of derivation is altered substantially, or the Contracting Officer determines that the market price indicator consistently and substantially failed to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the Contract Terms And Conditions -- Commercial Items (Natural Gas) clause.

(d) Examination of records. The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, and other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(End of Clause)

Note 1: The Contracting Officer is required to fill-in the applicable ceiling in paragraph (c)(2)(i)

52.216-9075 Economic Price Adjustment – Published Market Price –Ships Bunkers.

As prescribed at 16.203-4(a)(2)(105), insert the following clause:

ECONOMIC PRICE ADJUSTMENT – MARKET PRICE INDICATORS - SHIPS BUNKERS

(NOV 2011)

(a) Warranties. The Contractor warrants that –

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause, the term-

(1) Award price means the original contract price.

(2) Reference price means the market price indicator set forth in the Table in (f) below with which the award price is to fluctuate.

(i) Base reference price means the market price indicator shown in the Table in (f) below and is the reference price from which economic price adjustments are calculated pursuant to this clause. This price will be expressed as base reference price in any price adjustment notification issued through contract modifications and/or postings to the DLA Energy web page under the heading vendor resources and then product price adjustments. The base reference date annotated in the table shall remain unchanged throughout the life of the contract.

(ii) Adjusting reference price means the market price indicator in effect in the calendar week of the date of delivery, used to determine the change in reference price. In the event one or more applicable reference prices are not (or were not) published, then the term adjusting reference price means the market price indicator for an item as published on the date nearest in time on or prior to the effective calendar date as expressed in (4) below. It is annotated as new reference price in any price adjustment notification (PA) modification issued.

(3) Current unit price means the most current price in effect for the week that the price adjustment provisions discussed in paragraph (c) below begin. This price, expressed as latest unit price in any price adjustment notification issued through contract modifications and/or postings to the DLA Energy web page under the heading vendor resources and then product price adjustments shall be the unit price charged to the Government for supplies delivered under the contract.

(4) Date of delivery means the date and time product is received by the requesting activity/vessel. This is shown by signature of receipt by the Government representative for the entire delivery. A single delivery that began on one date and ended on another date shall be considered as received on the date of completion annotated by the Government on the bunker delivery document. Excusable delays in delivery shall be handled on a case-by-case basis by the Contracting Officer.

(5) alendar week means a consecutive seven-day period, beginning with Monday, unless otherwise specified in (c)(1) below.

(6) Published means issued in either print or electronic format by the service designated to be employed as an escalator, unless otherwise specifically stated. In the event of a conflict between the prices set forth in the print version and those set forth in the electronic version for the same date, the electronic version shall prevail, unless otherwise specified in (c)(1) below.

(c) Adjustments. The prices payable under this contract shall be the award price increased or decreased by the amount that the reference price shall have increased or decreased through the date of delivery. The amount of increase or decrease in the award price shall be based on the same number of cents, or fraction thereof, that the reference price increases or decreases per like unit of measure.

(1) Day of publication.

(i) Platt's bunkerwire and bunkerfuels report. For items employing Platt's Bunkerwire and Bunker Fuels Report, the adjusting reference price in effect on the date of delivery shall be that item's reference price effective (and normally published) on the Tuesday of the calendar week in which the delivery is made, or, in the event there is no publication on Tuesday of that week, it shall be the item's reference price as last previously published prior to that Tuesday.

(ii) Platt’s Oilgram price report. For items employing Platt's Oilgram Price Report, spot price assessment, the adjusting reference price in effect on the date of delivery shall be that item's reference price in effect for the Monday of the calendar week in which the delivery is made, or, in the event there is no price for that Monday, it shall be the item's reference price in effect for the date nearest in time prior to that Monday. For items employing Platt’s Oilgram Price Report, 5 day rolling average, the reference price in effect on the date of delivery shall be the average of that item’s reference price effective for 5 consecutive days ending Friday prior to the calendar week in which the delivery is made. In the event there is no price for any one or more of those 5 days, the reference price shall be calculated by averaging the last 5 days for which prices were in effect on or prior to that Friday.

(iii) AXXIS. For items employing AXXIS, the adjusting reference price shall be that item’s reference price in effect for the Thursday of the calendar week prior to the date that delivery is made. In the event there is no price for that Thursday, it shall be the item’s reference price in effect for the date nearest in time prior to that Thursday.

(iv) Oil price information service (OPIS). For items employing OPIS, the adjusting reference price in effect on the date of delivery shall be that item’s reference price published, in print, on the Monday of the calendar week in which delivery is made. In the event there is no publication in that week, it shall be the item’s reference price as last previously published in the print edition.

Note: Generally, the Monday print edition of OPIS contains the prices in effect for the prior Thursday. However, the Monday print edition of OPIS may contain prices for a date other than the prior Thursday. In any event, the prices appearing in the Monday print edition shall have control.

(v) When a combination of two different publications is utilized, the applicable reference dates will be stated in paragraph (f) below, unless paragraph (f) references an attachment, in which case the reference dates will be provided in that attachment .

(vi) Platts issues corrections to its published prices on a regular basis. Platts posts corrections to its website (http://www.platts.com) for its subscribers. If a correction to a reference price is found on the Platts website, all of the items that use that reference price will be corrected. DLA Energy will correct any other reference prices, as notice of the correct is received. DLA Energy will work with the pricing services to determine the appropriate price, whenever an offeror or Contractor can show that the price referenced should be reviewed.

(2) Calculations.

(i) If averages are published within a given publication, then these averages will be used.

(ii) or prices in U.S. gallons, if averages are not available within a given publication, DLA Energy calculated averages, carried to six decimal places, rounded, will be used based on the low and high prices. For prices in metric tons, if averages are not available within a given publication, DLA Energy calculated averages, carried to two decimal places, rounded, will be used. For domestic contract line items, DLA Energy conversions from metric tons to gallons shall be calculated based on the conversion factors Instruction for the applicable publication reference product. Barrels shall be converted using the DLA Energy conversion factors Instruction line for barrels to gallons. The above shall apply unless cited differently in the Table in (f) below.

(iii) For domestic contract line items, the final calculated reference price, as well as any intermediary arithmetical calculations, will consist of a number including six decimal places, rounded. For overseas contract line items, the final calculated reference price, as well as any intermediary arithmetical calculations, will consist of a number including two decimal places, rounded.

(iv) For domestic contract line items, the final adjusted unit price will always consist of a number including six decimal places, rounded. For overseas contract line items, the final adjusted unit price will always consist of a number including two decimal places, rounded.

(3) Failure to deliver. Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions – Commercial Items clause of this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(4) Upward ceiling on economic price adjustments. The Contractor agrees that the total increase in any contract unit price shall not exceed [contracting officer fill-in applicable upward ceiling]_ percent of the award price, except as provided hereafter:

(i) If, at any time, the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with an appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(5) Revision of reference price. In the event—

(i) Any applicable reference price (market price indicator) is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the reference price consistently and substantially fails to reflect market conditions—

the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on or just prior to the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the Contract Terms And Conditions – Commercial Items clause of the contract.

(d) Examination of records. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, and other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this clause.

(e) Final invoice. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(f) Table. The following publication(s)/date(s) apply: [contracting officer fill-in of applicable information].

Note to contracting officer: - select one of the following choices:

(1) Insert the following table when the solicitation does not contain numerous items:

Base reference Base reference Base reference Base reference

Item no. publication heading date price

or

(2) (at Contracting Officer’s discretion) Insert for Ships’ Bunker programs when the solicitation is for a major program buy:

“See the continuation pages to this clause at Attachment C for a listing of each line item, the applicable publications for each line item, as well as the applicable reference heading, base reference date and base reference price.”

The Contracting Officer shall insert the appropriate table at Attachment C.

(End of Clause)

52.216-9083 Restitution.

As prescribed in 16.506-97, insert the following clause:

RESTITUTION (SEP 2012)

(a) Warranties. The Contractor warrants that the unit prices included in the schedule do not include allowances for any portion of the contingency covered by this clause.

(b) Restitution is an export subsidy given by the governments of European Community member countries to companies for specific products they export to third countries. These subsidies enable foreign companies to charge less for exports.

(1) Restitution also applies to sales to the United States Forces stationed in Europe under the Status of Forces Agreement (SOFA). Accordingly, restitution applies to this contract.

(2) The amount of restitution provided by these Governments changes from time to time and is expected to be reduced and eventually eliminated. Accordingly, the unit prices subject to restitution under this Contract shall be increased or decreased to cover some or all (see paragraph (c)) of these changes in the restitution amount.

(c) estitution schedule(s):

(1) Restitution applies to the following items/products: _(The contracting officer shall insert the appropriate language based upon the type of product(s) as listed here in the clause):

(The contracting officer shall insert the line item number(s) and product(s) that are subject to the restitution.)

(2) The offeror shall provide a restitution schedule with its offer.

(i) This restitution schedule is a listing of the items subject to adjustment under this clause and shall include the contract line items, product names, unit prices and amount of restitution contained in each.

(ii) This restitution schedule shall be verified by the Contracting Officer and shall be included in the Contract at paragraph (g) to the extent verified by the Contracting Officer.

(3) Restitution adjustments shall be limited to those items listed in the restitution schedule and are authorized to be made [The contracting officer shall insert the frequency of the adjustments to be made during the life of the contract in terms of days, months, or other appropriate period].

(i) Revised restitution schedules shall be required whenever there are changes in restitution authorized by this clause. (See paragraph (d)).

(ii) Whenever a revised restitution schedule becomes effective, it shall be incorporated into paragraph (g) and replace the existing restitution schedule.

(d) Adjustment in restitution:

(1) During the basic Contract year the first adjustment consideration date will be _[The contracting officer shall insert the day and month of the first authorized adjustment period, i.e., 1 January]_. After this date the next adjustment consideration will be _[The contracting officer shall insert the day and months of the subsequent authorized adjustment periods, i.e., 1 April, 1 July, etc.]_.

(2) When an adjustment is authorized by this clause, the Contractor shall notify the Contracting Officer if the rates of restitution for the same item shown in the restitution schedule either increase or decrease. The Contractor shall furnish this notice within _[The contracting officer shall insert the number of days the contractor has to submit an adjustment request.]_ days after the restitution amount is increased or decreased, or within any period that the contracting officer may approve in writing.

(3) The notice shall include the Contractor’s proposal for an adjustment in the contract unit prices and shall include, in the form required by the Contracting Officer, supporting data explaining the cause, effective date(s) for the new restitution rate(s), amount of the increase or decrease, the amount of the contractor’s adjustment proposal, and any other information required by the Contracting Officer to verify the revised restitution amount(s) and the proposed adjustment(s).

(i) This supporting documentation shall also include the calculations used to derive the adjusted unit price(s) and a revised restitution schedule updated to reflect the new proposed contract unit prices and restitution rates.

(A) The revised restitution schedule shall include the same information as the original restitution schedule discussed in paragraph (c) above.

(B) The revised restitution schedule shall cover the current term of the contract. Also, if not all the items on the revised restitution schedule were affected by the current adjustment, those subject to adjustment shall be highlighted.

(ii) Those items not subject to adjustment shall reflect the same restitution amount as contained in the existing restitution schedule in paragraph (g).

(4) Calculation of the revised unit price based upon changes in restitution.

(i) The restitution amounts agreed to at time of award shall serve as the basis for the initial adjustment. Once the adjustment is made, the revised restitution amounts will serve as the basis for the next adjustment. Restitution adjustments shall be calculated using the following formula:

(A) If restitution decreases:

Current restitution amount (per contract item unit price)

- Revised restitution amount (per contract item unit price)

------------------------------------------------------------------------

= Unit price adjustment

The unit price adjustment shall be added to the unit price to determine the revised unit price.

(B) If restitution increases:

Current restitution amount (per contract item unit price)

- Revised restitution amount (per contract item unit price)

------------------------------------------------------------------------

= Unit price adjustment

The unit price adjustment shall be subtracted from the unit price to determine the revised unit price.

(e) Promptly after the contracting officer receives the notice and data under paragraph (d) above, the Contracting Officer shall make a price adjustment in the contract unit prices.

(1) The effective date of any price adjustment shall be no later than _(The contracting officer shall insert the number of days the Government has to evaluate and finalize a price adjustment) days after the Government receives the contractor’s restitution change proposal.

(2) The Contracting Officer may postpone the adjustment until an accumulation of increases or decreases per item results in an adjustment allowable under sub-paragraph (f)(6) of this clause. The Contracting Officer’s price verification analysis shall include using the information contained in ___[The contracting officer shall insert the publication(s) which contain the restitution amount information and will be used in the price verification analysis]____.

(3) The Contracting Officer shall modify this contract (1) to include the price adjustment and its effective date and (2) replace the existing restitution schedule in paragraph (g) with the revised restitution schedule to reflect the increase or decrease resulting from the adjustment. The Contractor shall continue performance pending any adjustment under this clause.

(f) Any price adjustment under this clause is subject to the following limitations:

(1) Decreases in the rate of restitution for products shown in the current restitution schedule in paragraph (g). There shall be no adjustment for --

(i) supplies or services for which the unit price is not affected by such changes, or

(ii) changes in unit price other than for those items shown in the Restitution Schedule.

(2) The aggregate of the increase in any contract unit price shall not exceed 10% of the original contract unit price. There is no percentage limit on downward adjustments under this clause.

(3) No upward adjustment shall apply prior to the effective date of the adjustment as set forth in the contract modification.

(4) The adjusted contract unit prices shall apply only to quantities delivered and accepted on or after the effective date of the adjustment as set forth in the contract modification.

(5) No modification increasing the contract unit price shall be executed until the contracting officer verifies the decrease in the restitution.

(6) There shall be no adjustment unless the value of the adjustment is at least 100 Euro per item, based upon the estimated weekly quantities.

(7) The Contractor shall certify on the final invoice that amounts invoiced under this contract have applied all restitution increases.

(g) The offeror shall attach a restitution schedule with his/her offer. (See paragraph (c). This paragraph shall be revised whenever a new restitution schedule applies).

Restitution schedule:

(The contracting officer shall insert the Contractor’s proposed restitution schedule into the resulting contract.)

(End of Clause)

52.216-9084 Economic Price Adjustment – National Contracts – Subsistence.

As prescribed at 16.203-4(a)(2)(106), insert the following clause.

ECONOMIC PRICE ADJUSTMENT (EPA) – NATIONAL CONTRACTS – SUBSISTENCE

(OCT 2014)

(a) Warranties. For the portion of the Schedule that is covered by this EPA clause, the Contractor warrants that the unit prices included in the Schedule do not include allowances for any portion of the contingency covered by this clause.

(b) The base market price for the purpose of the adjustment calculations under this clause shall be the arithmetic average of the prices for each applicable economic indicator for the period specified under the “Base Market Price Period” column below; for the initial Base Market Price, the specified period shall end with either the solicitation closing date for proposals (if no discussions are held)[,] the due date for final proposal revisions (if discussions are held), or the solicitation opening date (if sealed bidding is used), as applicable.

ITEM

ECONOMIC INDICATOR

PUBLISHER/ PUBLICATION/FREQUENCY PUBLISHED

BASE MARKET PRICE PERIOD

ADJUSTING MARKET PRICE PERIOD

 

 

 

 

 

[Contracting Officer shall fill in.]

 

 

 

 

 

(c) The adjusting market price shall be the arithmetic average of the prices of each applicable economic indicator published for the period specified under the “Adjusting Market Price Period” column shown in paragraph (b) immediately preceding the effective date of the adjustment period. "Base unit price" is the unit price as awarded for the base contract period and for each pricing tier period or option period for each item subject to adjustment pursuant to this clause, and shall be used in calculating price adjustments. This price is exclusive of any adjustment pursuant to this clause.

(d) An established market price is a price established in the course of ordinary and usual trade between buyers and sellers free to bargain and that can be substantiated by data from sources independent of the offeror(s); and the net price after applying any standard trade discounts offered by the Contractor. The established market price under this clause may reflect industry-wide and/or geographically-based market price fluctuations for commodity groups or specific supplies. The economic indicators and publications to be used in determining the established market prices for purposes of this clause are listed in paragraph (b) of this clause.

(e) "Adjustment period" is the amount of time, measured in months, during which the unit price for each contract line item must remain fixed.

(1) The initial base unit price (see paragraph (c) above) shall be the price for the first adjustment period following contact award.

(2) The length of each adjustment period will be (Contracting Officer shall insert number) months;

(3) Unit Prices shall not be adjusted for the first adjustment period following contract award and may only be adjusted for each adjustment period after that first adjustment period; and

(4) There shall be (Contract Officer shall insert number) adjustment periods per calendar year.

(f) “Adjusted Unit Price” is the adjusted price for each contract line item applicable at the start of and throughout each new adjustment period, as calculated following the procedure in (g) below.

(g) The Adjusted Unit Price for each item for each adjustment period shall be determined by increasing or decreasing (as appropriate) the Base Unit Price applicable to that adjustment period for each item by the applicable Market Price Change for each item. Each Adjusted Unit Price shall be rounded to two decimal places. Adjustments shall be calculated as follows:

(1) Compute the Adjusting Market Price and the Base Market Price for each item subject to adjustment. (Round to four decimal places)

(2) Adjusting Market Price – Base Market Price = Market Price Change (+ or -). (Round to two decimal places)

(3) Current Base Unit Price (+ or -) Market Price Change = Adjusted Unit Price.

(4) The following calculation example is provided.

EXAMPLE OF ADJUSTMENT CALCULATION

Final Proposal Revision due date: June 28, 2013

*For the purpose of the example adjustment, the base market price will be the economic indicator for the four weeks immediately preceding the due date for Final Proposal Revision.

ITEM

ECONOMIC INDICATOR

PUBLISHER/ PUBLICATION/ FREQUENCY PUBLISHED

BASE MARKET PRICE PERIOD

ADJUSTING MARKET PRICE PERIOD

Chicken Breast Filets

Breasts. B/S, Georgia FOB Dock, Final Wtd. Avg. Price

USDA/Broiler Market News Report/Final Wtd. Avg. Prices are Reported on Mondays*

4 week weighted average price for end of period preceding adjustment period

3 months immediately preceding the date of adjustment

The arithmetic average of the prices listed in the United States Department of Agriculture (USDA) Broiler Market New Report for Chicken Breasts – B/S (Boneless/Skinless) during the four (4) week period immediately preceding the due date for Final Proposal Revisions will be used to calculate the base market price for the Chicken Breasts – B/S

Base Market Price calculation

*Note 1: The numbers used in the following example are hypothetical and are being utilized for illustration purposes only for how the price adjustments will be calculated pursuant to this clause.

*Note 2: The prices reported in the USDA/Broiler Market News are reported in cents per LB. To convert the prices in Dollars per LB, divide by 100. For the purpose of this example and the EPA price adjustment calculations, the prices shall be shown in Dollars per LB.

Date

Price in Dollars per LB

   

24 June 2013

$1.7850

   

17 June 2013

$1.7500

   

10 June 2013

$1.8150

   

03 June 2013

$1.8400

   

Total Four Weeks

$7.1900

   

Total/4 = Arithmetic average

$1.7975

*Note 3: For some four (4) week periods, the USDA may publish fewer than four (4) issues of the summary due to events such as Federal Holidays. In all such cases, only those issues published for the relevant four week period will be used in the calculations.

Base award date: August 30, 2013 Base Unit Price: $2.39

*Note 4: For the purpose of this example, the initial offered prices will be fixed for three months

(August 30, 2013 – November 30, 2013), which would be the first adjustment period following contract award. For this example, the effective modification date for the second adjustment period is November 30, 2013.

The arithmetic average of the prices listed in the United States Department of Agriculture (USDA) Broiler Market New Report for Chicken Breasts – B/S (Boneless/Skinless) during the 3 month period (approximately 13 weekly reports) immediately preceding the effective date of the modification (i.e. November 30, 2013) will be used to calculate the first adjustment period for the Chicken Breasts – B/S

Adjusted Market Price calculation

Date

Price in Dollars per LB

   

25 November 2013

$1.5200

   

18 November 2013

$1.5500

   

11 November 2013

$1.5900

   

04 November 2013

$1.6350

   

28 October 2013

$1.6700

   

21 October 2013

$1.7950

   

14 October 2013

$1.8650

   

07 October 2013

$2.0300

   

30 September 2013

$2.0350

   

23 September 2013

$2.0600

   

16 September 2013

$2.0750

   

09 September 2013

$1.9850

   

02 September 2013

$1.9000

   

Total 13 Weeks

$23.7100

   

Total/13 = Arithmetic average

$1.8238

   

1. Calculate the Adjusting Market Price and the Base Market Price. From the example above:

Base Market Price = $1.7975 and Adjusting Market Price = $1.8238 (Round to four decimal places)

2. Calculate Market Price Change (+/-):

Adjusting Market Price – Base Market Price = $1.8238 -$1.7975 = $0.03 (Round to two decimal places)

3. Calculate Adjusted Unit Price: Base Unit Price (+/-) Market Price Change

*Note: Since this is an example of the first price adjustment under this clause, the base unit price would be the price as awarded.

$2.39 + $.03 = $2.42

(h) Price adjustments pursuant to this clause shall be made by contract modification showing the calculations used to derive the adjusted contract unit price. All order pricing will be the contract price in effect at the time the order is placed. No price adjustment under this clause will take effect unless and until a formal modification adjusting the price is made.

(i) Any pricing actions pursuant to the Changes Clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.

(j) Upward ceiling on economic price adjustment. The total increase in any contract unit price during and at the end of all adjustment periods to which a particular base unit price is applicable shall not exceed Contracting Officer shall insert percentage of that base unit price agreed to at time of award. There is no percentage limit on downward adjustments under this clause.

(k) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the adjustment ceiling for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(l) If an increase in the price index would raise a contract unit price for an item above the current ceiling, the Contracting Officer may issue a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(m) Revision of market price indicator. In the event (i) any applicable market price indicator is discontinued or its method of derivation is altered substantially or (ii) the Contracting Officer determines that a particular market price indicator consistently and substantially no longer reflects market conditions, the parties shall mutually agree upon an appropriate and comparable substitute, and the contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(n) Disputes. If the parties fail to agree on an appropriate substitute market price indicator or implementation of other matters addressed by this EPA clause, then the matter shall be resolved in accordance with the Disputes clause of the contract.

(o) Examination of records. The Contractor agrees that the Contracting Officer or designated representative shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of the clause.

(p) In the event any applicable market price indicator is not published for any week, quarter, month, etc., that week, quarter, month, etc., will not be included in calculating the Base Market Price or the Adjusting Market Price, as applicable. For instance, if within a three-month period an indicator was expected to be published 13 times (1 time per week) but was not published 2 times, the average of the 11 published prices only will be calculated. When a range of prices is provided, for the purposes of the calculations the arithmetic average of the high and low number will be calculated to determine the indicator for that period.

(End of clause)

52.216-9085, Economic Price Adjustment -- DLA Multiple Award Schedule Contracts.

As prescribed in 16.203-4(a)(1)(S-92), insert the following clause:

ECONOMIC PRICE ADJUSTMENT -- DLA MULTIPLE AWARD SCHEDULE CONTRACTS

(OCT 2015)

(a) The Contractor warrants that the unit price stated in the Schedule for _________ [Offeror insert catalog part number(s) or state “all line items”] is not in excess of the Contractor’s applicable established price, proposed as the basis for the contract award, in effect on the contract date for like quantities of the same item. The term “unit price” excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term “established price” means a price that --

(1) Is an established catalog or market price for a commercial item sold in substantial quantities to the general public; and

(2) Is the net price after applying any standard trade discounts offered by the Contractor.

(3) The Contractor shall identify the standard trade discount as follows: [The Contracting Officer is to check a box to indicate whether paragraph (a)(3)(i) or (a)(3)(ii) applies.]

(i) ☐ The standard trade discount offered is _______. [Offeror insert discount percentage] The contractor may offer increased discounts, either temporary or permanent, during the contract ordering period.

(ii) ☐ The standard trade discount including offered discount shall be provided in accordance with _____________________________________. [The Contracting Officer shall insert the applicable clause(s), provision(s), or reference(s) within the solicitation.]

(b) The Contractor shall promptly notify the Contracting Officer of the amount and effective date of each decrease in any established price that was used as the basis for the contract award. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those items ordered after the effective date of the decrease in the Contractor’s established price and the online catalog price is modified by the contracting officer.

(c) If the Contractor’s applicable established price that was used as the basis for the contract award is increased after the contract date, the corresponding contract unit price shall be increased, upon the Contractor’s written request to the Contracting Officer, by the same or if requested by the Contractor a lower percentage, that the established price is increased and the online catalog price is modified by the contracting officer, subject to the following limitations:

(1) All prices shall be fixed for the initial 12-month period of the contract, unless otherwise specified at the time of award.

(2) No more than three requests for price increases per Schedule will be considered during each succeeding 12-month period of the contract.

(3) The aggregate of the increases during any 12-month period in any contract unit price under this clause shall not exceed ___ percent of the contract unit price in effect at the end of the preceding 12-month period. The Government may unilaterally change this limitation when market conditions during the contract period support such a change.

(4) An increase in a contract unit price shall not be executed and the online catalog shall not be modified under this paragraph (c) until the Contracting Officer verifies the reasonableness of the increase in the applicable established price. The increase shall apply to those items ordered after the effective date of the decrease in the Contractor’s established price and the online catalog price is modified by the contracting officer.

(5) The Contractor will submit for all price increases/decreases.

(i) The commercial catalog/price list with the price change and the effective date for general public.

(ii) Additional information as requested by the Contracting Officer to support the price increase or decrease.

(End of Clause)

52.219-9004 Small Business Program Representations.

As prescribed in 19.307(90), insert the following provision:

SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2011)

(a) In order to facilitate the use of electronic commerce/electronic data interchange while fulfilling the requirements of the small business program, certain socioeconomic information must be provided in a coded, rather than a fill-in format. Because electronic commerce/electronic data interchange (EC/EDI) transactions are often reformatted in transmission, the use of these codes will prevent misinterpretation within the system. The recording of unique codes instead of the traditional “x-in-the-box” form of information entry may also preclude potential mistakes in socioeconomic program reporting.

(b) In order to record the representations and certifications contained in Federal Acquisition Regulation (FAR) provision 52.219-1, Small Business Program Representations, and in accordance with the definitions found therein, the offeror represents and certifies as a part of its offer that it is a ____________business type. (The offeror shall select the one code from the following listing which represents the offeror’s business type.) The offeror’s recording of its business type herein by means of an alpha code replaces the marking of the appropriate boxes in FAR 52.219-1, paragraph (b). The penalties for misrepresentation of business status still apply; see FAR 52.219-1, paragraph (d)(2).

Code B=Small Business. Enter code B if your firm is a small business concern, as defined in FAR 52.219-1, paragraph (c).

Code M=Small Disadvantaged Business. Enter code M if your firm is a small disadvantaged business concern, as defined in FAR 52.219-23, paragraph (a).

Code U=Woman-Owned Small Disadvantaged Business. Enter code U if your firm is a woman-owned business, as defined in FAR 52.219-1, paragraph (c), and a small disadvantaged business, as defined in FAR 52.219-23, paragraph (a).

Code W=Woman-Owned Small Business. Enter Code W if your firm is a woman-owned small business, as defined in FAR 52.219-1, paragraph (c).

Code A=Large business. Enter code A if your firm is not included in any of the above categories.

(End of Provision)

52.219-9008 Combined HUBZone/Small Business Set-Aside Instructions – Type 1.

As prescribed in 19.508(90)(a), insert the following clause:

COMBINED HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZONE)/SMALL BUSINESS SET-ASIDE INSTRUCTIONS – TYPE 1 (NOV 2011)

This solicitation is restricted to small business concerns and Federal Prison Industries (FPI). All small businesses are encouraged to submit quotes; however, award will be made in the following order of set-aside precedence: (1) HUBZone small business concerns (Federal Acquisition Regulation (FAR) clause 52.219-3); then, if no qualified quote is received from a HUBZone small business concern at a fair market price, (2) small business concerns (FAR 52.219-6) or FPI (FAR 52.219-6, Alternate II). The FAR clauses contained herein (except paragraph (b) of 52.219-3) apply to the solicitation. Only the FAR clause matching the awardee’s Small Business Program and Type representation applies to the award.

(End of Clause)

52.219-9009 Combined HUBZone/Small Business Set-Aside Instructions – Type 2.

As prescribed in 19.508(90)(b), insert the following clause:

COMBINED HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZONE)/SMALL BUSINESS SET-ASIDE INSTRUCTIONS – TYPE 2 (FEB 2006)

This solicitation is restricted to small business concerns and Federal Prison Industries (FPI). All small businesses are encouraged to submit quotes; however, award will be made in the following order of set-aside precedence: (1) HUBZone small business concerns (Federal Acquisition Regulation (FAR) clause 52.219-3); then, if no qualified quote is received from a HUBZone small business concern at a fair market price, (2) small business concerns (FAR 52.219-6 Alternate I) or FPI (FAR 52.219-6, Alternate II). The FAR clauses contained herein (except paragraph (b) of 52.219-3) apply to the solicitation. Only the FAR clause matching the awardee’s Small Business Program and Type representation applies to the award.

(End of Clause)

52.219-9013 Combined Set-Aside Instructions – Type 1.

As prescribed in 19.508(c), insert the following clause:

COMBINED SET-ASIDE INSTRUCTIONS – TYPE 1 (NOV 2011)

(a) This solicitation is restricted to small business concerns and Federal Prison Industries (FPI). All small businesses are encouraged to submit quotes; however, award will be made in the following order of set-aside precedence:

(1) Service-disabled veteran-owned small business (SDVOSB) concerns (Federal Acquisition Regulation (FAR) clause 52.219-27); then, if no qualified quote is received from an SDVOSB concern at a fair market price,

(2) Historically underutilized business zone (HUBZone) small business concerns (FAR 52.219-3); then, if no qualified quote is received from a HUBZone small business concern at a fair market price,

(3) small business concerns (FAR 52.219-6) or FPI (FAR 52.219-6, Alternate II).

(b) The FAR clauses contained herein (except paragraphs (b) of 52.219-3 and 52.219-27) apply to the solicitation. Only the FAR clause matching the awardee’s Small Business Program and Type representation applies to the award.

(End of Clause)

52.219-9014 Combined Set-Aside Instructions – Type 2.

As prescribed in 19.508(90)(d), insert the following clause:

COMBINED SET-ASIDE INSTRUCTIONS – TYPE 2 (NOV 2011)

(a) This solicitation is restricted to small business concerns and Federal Prison Industries (FPI). All small businesses are encouraged to submit quotes; however, award will be made in the following order of set-aside precedence:

(1) Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns (Federal Acquisition Regulation (FAR) clause 52.219-27); then, if no qualified quote is received from a SDVOSB concern at a fair market price,

(2) Historically Underutilized Business Zone (HUBZone) small business concerns (FAR 52.219-3); then, if no qualified quote is received from a HUBZone small business concern at a fair market price,

(3) Small business concerns (FAR 52.219-6, Alternate I) or FPI (FAR 52.219-6, Alternate II).

(b) The FAR clauses contained herein (except paragraphs (b) of 52.219-3 and 52.219-27) apply to the solicitation. Only the FAR clause matching the awardee’s Small Business Program and Type representation applies to the award.

(End of Clause)

52.219-9015 Combined Service-Disabled Veteran-Owned Small Business/Small Business Set-Aside Instructions – Type 1.

As prescribed in 19.508(e), insert the following clause:

COMBINED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS/SMALL BUSINESS SET-ASIDE INSTRUCTIONS – TYPE 1 (NOV 2011)

(a) This solicitation is restricted to small business concerns and Federal Prison Industries (FPI). All small businesses are encouraged to submit quotes; however, award will be made in the following order of set-aside precedence:

(1) Service-disabled veteran-owned small business (SDVOSB) concerns (Federal Acquisition Regulation (FAR) clause 52.219-27); then, if no qualified quote is received from a SDVOSB concern at a fair market price,

(2) Small business concerns (FAR 52.219-6) or FPI (FAR 52.219-6, Alternate II).

(b) The FAR clauses contained herein (except paragraph (b) of 52.219-27) apply to the solicitation. Only the FAR clause matching the awardee’s Small Business Program and Type representation applies to the award.

(End of Clause)

52.219-9016 Combined Service-Disabled Veteran-Owned Small Business/Small Business Set-Aside Instructions – Type 2.

As prescribed in 19.508(f), insert the following clause:

COMBINED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS/SMALL BUSINESS SET-ASIDE INSTRUCTIONS – TYPE 2 (NOV 2011)

(a) This solicitation is restricted to small business concerns and Federal Prison Industries (FPI). All small businesses are encouraged to submit quotes; however, award will be made in the following order of set-aside precedence:

(1) Service-disabled veteran-owned small business (SDVOSB) concerns (Federal Acquisition Regulation (FAR) clause 52.219-27); then, if no qualified quote is received from a SDVOSB concern at a fair market price,

(2) small business concerns (FAR 52.219-6, Alternate I) or FPI (FAR 52.219-6, Alternate II).

(b) The FAR clauses contained herein (except paragraph (b) of 52.219-27) apply to the solicitation. Only the FAR clause matching the awardee’s Small Business Program and Type representation applies to the award.

(End of Clause)

52.232-9006 Transporter proof of delivery (TPD).

As prescribed in 32.908-94, insert the following clause:

TRANSPORTER PROOF OF DELIVERY (TPD) (APR 2013)

(a) Definition. As used in this clause, transporter proof of delivery (TPD) means a commercial document that is generated by the Contractor and/or the Contractor’s transporter of supplies and that is signed by the Government customer in order to document delivery of supplies under this contract/order. Examples of TPD are United Parcel Service (UPS) or Federal Express (FEDEX) delivery tracking reports. TPD documentation must include a customer signature, or visibility of the name of the customer who signed.

(b) When this clause is included in the contract or order, the Government may use TPD, in combination with adequate Contractor documentation cross-referencing the TPD to the specific supplies provided, as a basis for accepting the supplies. TPD with adequate supporting documentation satisfies the receipt report requirement and, coupled with acceptance, allows the Government to initiate the payment process, if all other applicable payment conditions are satisfied.

(c) To facilitate the payment process, the Government will initiate a request for the Contractor to provide TPD when the customer has not provided receipt acknowledgement to the buying activity. If TPD is requested and the Contractor agrees to provide it, the documentation must include the customer signature, or visibility of the name of the customer who signed, and as much of the following information as possible:

(1) Contract number or order number;

(2) Contract line item number (CLIN);

(3) Unit price;

(4) Quantity of items;

(5) Extended price;

(6) National stock number (NSN);

(7) Delivery date;

(8) Recipient organization's name and address;

(9) Receiving activity Department of Defense activity address code (DoDAAC);

(10) Requisition document number (and suffix, when applicable);

(11) Shipment number;

(12) Invoice number; and

(13) Location where the carrier made delivery (activity name, building number, city, state).

(d) Process for submitting TPD documentation.

(1) Enter wide area workflow (WAWF) using the ``history folder,'' enter the appropriate contract data, and recall the receiving report (RR);

(2) Click on “attachment.” Browse and upload the TPD and any additional Contractor documentation required to provide the information identified in paragraph (c) of this clause. (Attachments created in any Microsoft Office product or in PDF format are acceptable.); and

(3) Click on “submit.”

(e) Responsibility for supplies.

(1) Title to the supplies passes to the Government after delivery to the point of first receipt by the Government and subsequent acceptance.

(2) Notwithstanding any other provision of the contract, order, or blanket purchase agreement, the Contractor shall:

(i) Assume all responsibility and risk of loss for supplies not received at destination, damaged in transit, or not conforming to purchase requirements; and

(ii) Replace, repair, or correct those supplies promptly at the Contractor’s expense, if instructed to do so by the Contracting Officer within 180 days from the date title to the supplies vests in the Government.

(End of Clause)

52.233-9001 Disputes Agreement to Use Alternative Dispute Resolution (ADR).

As prescribed in 33.214, insert the following provision:

DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (DEC 2016)

(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.

(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the contractor (see FAR 52.233-1), or, for the Agency, by the contracting officer, and approved at a level above the contracting officer after consultation with the ADR Specialist and legal counsel. Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the contracting officer before determining ADR to be inappropriate.

(c) If you wish to opt out of this clause, check here [ ]. Alternate wording may be negotiated with the contracting officer.

(End of Provision)

52.237-9003 Site Visit Coordinator.

As prescribed in 37.110-90(a), insert the following provision:

SITE VISIT COORDINATOR (APR 2008)

(a) Interested prospective offerors may make an appointment to visit the site of installation by contacting the site visit coordinator or his or her alternate, during normal work hours/local time at the site. Contact information for the site visit coordinator and his or her alternate is as follows:

Primary Name: Phone Number

Alternate Name: Phone Number

(b) Prospective offerors are notified that remarks or explanations provided during a site visit shall not qualify the terms of this solicitation. Unless and until this solicitation is amended in writing, terms of the solicitation and specifications remain unchanged.

(c) Site visitors requiring interpretation or clarification of technical or contractual requirements included in this solicitation are encouraged to submit their questions and any information obtained during the site visit to the Contracting Officer, by contacting the individual identified on the face of the solicitation.

(End of Provision)

52.247-9001 Port Handling and Ocean Costs in Bid Evaluation.

As prescribed in 47.305-3(91), insert the following provision:

PORT HANDLING AND OCEAN COSTS IN OFFER EVALUATION (APR 1985)

The above tentative port handling and ocean freight charges are set forth for the information of offerors. In evaluating offers received in response to this solicitation, the Government will utilize those charges which are on file as of the date of bid opening, or closing time specified for receipt of proposals, and effective for the date of expected initial shipment. A list of port handling and ocean freight charges actually used in evaluation, if substituted for any listed above, will be furnished interested offerors upon request.

(End of Provision)

52.247-9011 Vendor Shipment Module (VSM).

As prescribed in 47.305-8-90(c), insert the following clause:

VENDOR SHIPMENT MODULE (VSM) (NOV 2011)

(a) The Defense Logistics Agency (DLA) vendor shipment module (VSM), formerly known as the distribution planning and management system (DPMS), is a web-based distribution and transportation system available to DLA vendors for the purpose of obtaining current shipping addresses, two-dimensional bar coded shipping labels in accordance with military standard (MIL-STD) 129P, bills of lading, packing lists, and other shipping documentation. VSM replaces the need for the vendor to contact the DLA transportation office, prior to shipping, when directed in DLA contracts.

(Note: For contracts administered by the Defense Contract Management Agency (DCMA), the vendor must contact the DCMA transportation office in lieu of using VSM, unless otherwise stated in the contract.)

(b) Use of VSM is voluntary and is especially beneficial for DLA administered free on board (f.o.b.) origin contracts and for DLA administered contracts where ultimate destination is a location outside of the United States.

(c) endors using VSM must possess the following minimum information technology capability:

(1) Pentium personal computer or equivalent system sufficient to access the Internet.

(2) Compatible laser printer with two megabytes of memory.

(3) Internet Explorer 6.0 or higher.

(4) Adobe Acrobat 8.0 or higher

(5) Minimum 56 Kbps internet connection

(d) For more information about VSM or to register as a VSM user, contact the supply chain transportation office helpdesk at (800) 456-5507 or via email to delivery@dla.mil

(End of Clause)

52.247-9036 Shipping Instructions (Export).

As prescribed in 47.305-10-90(d), insert the following clause:

SHIPPING INSTRUCTIONS (EXPORT) (NOV 2011)

Mail instructions (Army Post Office (APO) or Fleet Post Office (FPO) addresses):

Shipments within mail limitations will be routed to the address cited with each contract line-item (CLIN) in the following manner, based on the TP (Transportation Priority) reflected in the "mark for" data with each CLIN:

(a) U.S. mail is the only mode authorized for shipments to APO or FPO addresses.

(b) Commercial small parcel carrier, (e.g., UPS, RPS or Federal Express) and Commercial Motor Carriers are never an acceptable mode to any APO/FPO address. A small parcel carrier may not be used for any destination in Alaska, Hawaii or Puerto Rico unless the carrier guarantees delivery to that specific consignee.

(c) Parcel post shipments to an APO/FPO address must be addressed to the "Commander" or "Commanding Officer" if there is no title preceding the address. Shipments must be annotated under the return address as follows: "Contents for official use - exempt from customs requirements."

(d) For TP1, TP2, (IPD 01-08), 999, NMCS, regardless of distance from origin to the APO/FPO address, contact the cognizant transportation office prior to shipment. Shipments must be packaged for transportation by Military Air (MILAIR).

(e) For TP3 (IPD 09-15), use surface parcel post (fourth class).

(f) Contact the transportation officer prior to shipping via parcel post when a single CLIN consists of more than one package.

(g) The cost of parcel post insurance will not be paid by the Government.

Freight instructions (to air or water ports and CCPs):

(a) Contractor must comply with the requirements of Federal Acquisition Regulation (FAR) 52.247-52, Clearance and Documentation Requirements - Shipments to DoD Air or Water Terminal Transshipment Points.

(b) Contact the Government Transportation Office for the Contract Administration Office: either Defense Contract Management Agency (DCMA) for DCMA administered awards or Defense Logistics Agency (DLA) Distribution for awards administered by the issuing office, see Block 7 of Department of Defense (DD) form 1155 (page 1 of an order) to obtain shipping instructions at least ten days prior to the FIRM date supplies will be available for release to the carrier.

(c) Shipments to container consolidation points (CCPs):

(1) Shipments directed to a CCP shown with each individual CLIN on Schedule Continuation Sheet(s) will be prepared and shipped in accordance with instructions provided within this contract for Preparation for Delivery.

(2) Contact the Transportation Officer for shipping instructions for the following CCP shipments:

(i) Cargo requiring refrigeration/temperature control.

(ii) Classified or sensitive items requiring signature control.

(iii) When dimensions of an item or package exceed 456 inches (38 feet) long by 89 inches wide by 88 inches high, or weight exceeds 10,000 pounds. Cargo cannot exceed any one of the dimensions or the weight.

(iv) When volume or weight constitutes a full SEAVAN load for each activity (DODAAD) code.

(v) Hazardous Material such as material which is flammable, corrosive, combustible, explosive, toxic, radioactive, unduly magnetic, or which contains oxidizing agents.

(vi) Type 1 shelf life items,

(vii) TP1 and 2 (IPD 01-08) with RDD of 999, 777, or 555.

Note 1: For shipments weighing less than 10,000 pounds which will not be tendered as a carload or truckload, the above data must be furnished only five (5) days prior to scheduled shipment date.

Note 2: Do not ship prior to furnishing required data.

Note 3: Invoices must specify clearly when shipment is made by air.

Advance notice of delivery:

Telephone notice of delivery must be given by the carrier to the consignee transportation officer (transport control/prelodge desk) at least 24 hours prior to delivery of freight shipments (other than small parcels) and bills of lading must be annotated to reflect this requirement.

Freight shipping addresses:

Mail address of the ultimate Consignee and "Mark For" information required as part of the address for parcel post or freight shipments, as applicable, are included with the data cited with each individual CLIN. When shipment is over parcel post limitations, the Contractor will comply with the paragraph above and ship in accordance with instructions furnished by the Transportation officer. Addresses of Aerial terminals will be furnished by the Transportation Officer as required. (Parcel post shipments will not be made to water or air terminals).

(End of Clause)

52.247-9037 Trans-Shipment of Material Through DLA Containerization and Consolidation Points (CCP).

As prescribed in 47.305-10-90(e), insert the following clause:

TRANS-SHIPMENT OF MATERIAL THROUGH DLA CONTAINERIZATION AND CONSOLIDATION POINTS (CCP) (NOV 2011)

(a) Shipping information overview:

(1) For awards not administered by Defense Contract Management Agency (DCMA), contact the DLA Distribution to schedule shipment and obtain export clearance and/or air clearance at:

DLA Distribution

Attention: Transportation Division

Email: delivery@dla.mil

Phone: 1-800-456-5507

Facsimile: 1-717-770-2709

(2) For DCMA administered awards:

(i) The Contractor must provide an electronic Department of Defense (DD) Form 1659 to the contract administration office (CAO) transportation officer. The electronic DD1659 can be secured by accessing the DCMA external web-based (EWAM) shipment instruction request (SIR) at http://www.dcma.mil or by accessing http://www.dtic.mil/whs/directives/infomgt/forms/eforms/dd1659.pdf or may be obtained from the responsible CAO.

(ii) The Contractor must contact the CAO transportation office to schedule shipment and coordinate export clearance.

(3) Approved distribution planning and management system (DPMS) Contractors may obtain shipping addresses/labels and clearances via the DPMS website.

(4) All shipments must be packaged in accordance with military standard (MIL STD) 2073 and marked in accordance with MIL STD 129. When authorized, commercial packaging/packing provisions must be in accordance with (ASTM D3951). Shipments of petroleum products, liquid substances, and materials, or any other product defined as hazardous shall be packaged in accordance with United Nations regulations which can be accessed at http://www.unece.org/trans/danger/publi/adr/adr2007/07ContentsE.html .

(b) Shipping documentation.

(1) All shipping documents (bills of lading or other delivery documents) shall be annotated in the description of articles space by the Contractor with:

(i) Transportation control number (TCN);

(ii) Required delivery date (RDD), project (if any), transportation priority (TP);

(iii) Ultimate consignee DODAAC and address (see "added marking for freight shipping").

(2) One copy of the contract shall be placed in a waterproof envelope and attached to the shipping container, or to the #1 shipment container (in a waterproof envelope), marked # 1 of the total number of containers, if a multi-piece shipment.

(c) Eligible shipments: CCP eligible shipments destined for an ultimate OCONUS destination will be shipped to the DLA CCP at San Joaquin, California (DDJC), or New Cumberland, Pennsylvania (DDSP) as directed by the transportation office (see paragraph (a) above).

Defense Distribution Depot San Joaquin, CA (DDJC) accepts:

Routine surface shipments, unless the material meets one of the exclusions listed in Paragraph (4) of this clause, for Army, Air Force, Navy and Marine Corps, and DLA activities located in Hawaii, Japan, Okinawa, Korea, Alaska, and throughout the Pacific.

Air Eligible shipments, unless the material meets one of the exclusions listed in Paragraph (d) of this clause, for Army activities located in Hawaii, Japan, Okinawa, Korea, Alaska, and throughout the Pacific.

Navy shore activities (not including CASREPS for “Mobile” units) throughout the Pacific and Hawaii.

DDJC – San Joaquin, California (Tracy site)

Phone: 209-839-4283

DSN: 462-4283

FAX: 209-982-3790

Receiving/delivery appointments

(209) 839-4307

Call 24 hours in advance to schedule an appointment.

Note: Shipments that have been determined to be Worldwide Express (WWX) eligible are not to be shipped to a CCP. It is the responsibility of the DCMA transportation office personnel to determine if a shipment is eligible for worldwide express (WWX).

Defense Distribution Depot Susquehanna, Pennsylvania (DDSP) accepts:

Routine surface shipments, unless the material meets one of the exclusions listed in Paragraph (d) of this clause, for Army, Air Force, and DLA activities located in northern and southern Europe, Africa, South America, and Central America.

Air eligible shipments, unless the material meets one of the exclusions listed in paragraph (d) of this clause, for Army and DLA activities throughout Northern and Southern Europe, Africa, South America, and Central America and Marine Corps shipments in the CENTCOM AOR.

DDSP – Susquehanna, Pennsylvania (New Cumberland site)

Commercial: 717-770-6393

DSN: 771-5381

FAX: 717-770-8660

Receiving/delivery appointments

1-800-307-8496

Call 24 hours in advance to schedule an appointment.

Note: Shipments that have been determined to be worldwide express (WWX) eligible are not to be shipped to the CCP. It is the responsibility of the DCMA transportation office personnel to determine if a shipment is eligible for worldwide express (WWX).

All high priority/air eligible material not listed above must be routed to the appropriate Air Mobility Command aerial terminal or other CONUS service designated activity as directed by the Transportation Office (see paragraph (1) above).

(d) Exclusions: Materiel not eligible for shipment to a DLA CCP because of exclusions listed below or where the shipment is consigned to an activity not supported by a DLA CCP shall be shipped directly to an appropriate aerial terminal, water port, or a CONUS service designated activity as directed by the Transportation Office (see paragraph (a) above).

(1) Excluded material:

(i) Any material listed in Defense Transportation Regulation (DTR) DOD 4500.9-R, Chapter 203, Tables 203-10 mandatory CCP exclusions), 203-11 (additional CCP exclusions for DDSP and DDJC) and 203-12 (additional mandatory CCP Exclusions for DDSP). The Defense Transportation Regulation (DTR) can be accessed at: http://www.transcom.mil/j5/pt/dtrpart2/dtr_part_ii_203.pdf .

Note: All shipments destined for CENTCOM AOR require application of radio frequency tags (RFID) for in-transit visibility of the material.

(ii) Foreign military sales (FMS)- FMS is shipped via special consolidation locations for the security assistance program (SAP) as listed in the military assistance program address directory (MAPAD) in accordance with the Delivery Term Code (DTC) requirements. Contact the DLA Distribution or DCMA transportation office (paragraph (1) above) for proper shipping instructions.

(End of Clause)

52.247-9054 Computation of Cube – Wood Products.

As prescribed in 47.303-90(i), insert the following provision:

COMPUTATION OF CUBE – WOOD PRODUCTS (NOV 2012)

(a) For the purpose of applying the rates specified in paragraph d of Federal Acquisition Regulation (FAR) provision 52.247-51, the total cubic feet for each contract line-item number (CLIN) will be computed as follows:

(1) Softwood lumber: The cube will be computed based on the minimum size specified by the issue of the American Softwood Lumber Standard PS20-70 in effect on the date of the solicitation for nominal size, degree of surfacing and moisture content specified for each CLIN. When a CLIN specification permits any stage of seasoning and offers are submitted based on furnishing dry lumber for specified CLINs the cube of such CLINs will be based on the minimum dry size for the stated nominal size and degree of surfacing.

(2) Hardwood lumber: The cube will be computed based on the minimum size specified by the National Hardwood Lumber Association rules in effect on the date of the solicitation for the nominal size, degree of surfacing and moisture content specified for each CLIN.

(3) Poles, piling and logs: The cube in board foot measure will be calculated using the brereton scale and the minimum butt and tip circumferences and the length specified for each CLIN. Measurement tons are computed using the conversion factor of 480 board foot measure equals one measurement ton or 40 cubic feet.

(4) Plywood: The cube will be computed based on plywood being packaged as required by Federal specification NN-P-530.

(5) Other wood products: The cube will be computed based on the dimensions specified for each CLIN.

(End of Provision)]

52.247-9058, First Destination Transportation (FDT) Program – Shipments Originating Outside the Contiguous United States (OCONUS).

As prescribed in 47.305-3(97), insert the following clause:

FIRST DESTINATION TRANSPORTATION (FDT) PROGRAM – SHIPMENTS ORIGINATING FROM OUTSIDE THE CONTIGUOUS UNITED STATES (OCONUS)

(JUL 2013)

(a) Contiguous United States (CONUS) is defined as being the 48 contiguous states and the District of Columbia.

(b) This acquisition is being conducted under the First Destination Transportation (FDT) Initiative. Delivery terms are f.o.b. origin. Inspection and acceptance by the Government will occur at destination unless otherwise specified in the solicitation.

(c) For offerors whose shipments will originate from outside CONUS (OCONUS), the Offeror’s f.o.b. origin price shall include transportation to a CONUS location that the Offeror selects based on cost-effectiveness or other variables at the Offeror’s discretion. This location shall be deemed the origin point for purposes of the f.o.b. origin terms and conditions of the solicitation/order/contract. The Offeror shall identify this CONUS location as the pick-up point in the Vendor Shipment Module (VSM) at https://vsm.distribution.dla.mil.

(End of Clause)

52.247-9059 F.o.b. Origin, Government Arranged Transportation

As prescribed in 47.305-3-98, insert the following clause in solicitations and contracts:

F.O.B. ORIGIN, GOVERNMENT ARRANGED TRANSPORTATION (OCT 2013)

(a) Definitions.

Government Arranged Transportation” means the Government is responsible for transportation costs, providing the carrier, and scheduling the shipment pickup contingent upon correct Contractor notification in VSM.

(2) “Vendor Shipment Module (VSM),” formerly known as the Distribution Planning and Management System (DPMS), is a Defense Logistics Agency (DLA) web-based distribution and transportation system available to DLA contractors for the purpose of obtaining current shipping addresses, two-dimensional bar-coded shipping labels in accordance with Military Standard (MIL-STD) 129P, bills of lading, packing lists, and other shipping documentation. VSM replaces the need for the Contractor to contact the DLA transportation office prior to shipping, when directed in DLA contracts. Refer to 47.305-8-90 and clause 52.247-9011 for VSM policy.

(b) The Contractor shall–

(1) Notify the Government when ready to ship material. The Contractor shall use the Vendor Shipment Module (VSM) to notify the Government of the availability of items to ship. The Government can take up to two (2) full business days to schedule the shipment, and pick-up should occur within five(5) business days of the Contractor’s notification. he Contractor shall plan for sufficient time for scheduling the shipment and standard ground transportation for its material to arrive at the destination by the CDD.

(2) Address special accommodations—

(i) Order specified carrier equipment when requested by the Government; or

(ii) If not specified, order appropriate carrier equipment not in excess of capacity to accommodate shipment;

(3) Deliver the shipment in good order and condition to the carrier, and load, stow, trim, block, and/or brace carload or truckload shipment (when loaded by the Contractor) on or in the carrier’s conveyance as required by carrier rules and regulations.

(c) Responsibility for supplies—

(1) Contractor is responsible for any loss and/or damage to the goods:

(i) Occurring before delivery to the carrier;

(ii) Resulting from improper loading, stowing, trimming, blocking, and/or bracing of the shipment, if loaded by the Contractor on or in the carrier’s conveyance.

(2) Per FAR 52.246-16 – Responsibility for Supplies, title to the supplies under this contract shall pass to the Government upon formal acceptance, regardless of when or where the Government takes physical possession, unless the contract specifically provides for earlier passage of title. The Contractor shall not be liable for loss or damage to supplies caused by the negligence of officers, agents, or employees of the Government, including but not limited to the Government’s designated carrier, acting within the scope of their employment.

(3) Paragraph (c)(2) above shall not apply to supplies that so fail to conform to contract requirements as to give a right of rejection. The risk of loss of or damage remains with the Contractor for all non-conforming supplies received at the first-destination location until cure or acceptance. If instructed by the Contracting Officer, the Contractor shall replace, repair, or correct those supplies promptly at the Contractor’s expense, including but not limited to shipping costs to retrieve the non-conforming supplies and costs to ship conforming supplies.

(End of Clause)