Previous PageTable Of ContentsDFARS Home PageNext Page

GSAM (GSAR) 511



Part 511—Describing Agency Needs

511.002 Policy.

FAR 11.002(b) and GSA Order ADM 8000.1C, GSA Metric Program, establish policy for using the metric system in procurements.

Subpart 511.1—Selecting and Developing Requirements Documents

511.102 Security of Information Technology Data

For actions that pertain to information systems or contractor managed government data, use the guidance identified under GSA’s office of the Senior Agency Information Security Officer publication CIO IT Security Procedural Guide 09–48. The guide can be accessed at http://www.gsa.gov/portal/category/25690. The contracting officer shall coordinate with program officials or requiring activities to ensure that the solicitation includes the appropriate information security requirements. The information security requirements must be sufficiently detailed to enable contractors to fully understand the information security regulations, mandates, and requirements under the contract or task order.

511.104 Use of brand name or equal purchase descriptions.

(a) A brand name or equal purchase description must avoid specifying characteristics that do not materially affect the intended end use and which unnecessarily restrict competition.

(b) When the contracting officer uses a brand name or equal purchase description, best practice is to cite the known acceptable brand name products in current manufacture, rather than only a single brand name product. For example, cite the acceptable brand name products identified during market research.

(c) The contracting officer may require samples for “or equal” offers, but not for “brand name” offers.

(d) The contracting officer shall provide for full consideration and evaluation of “or equal” offers against the salient characteristics specified in the purchase description and shall not reject offers for minor differences in design, construction, or features that do not affect the suitability of the product for its intended use.

Subpart 511.2—Using and Maintaining Requirements Documents

511.204 Solicitation provisions and contract clauses.

(a) Federal specifications. The contracting officer shall insert the clause at 552.211-72, Reference to Specifications in Drawings, in solicitations and contracts citing Federal or agency specifications that contain drawings.

(b) Supply contracts that exceed the simplified acquisition threshold.

(c) Supply contracts. The contracting officer shall include the clause at 552.211-77, Packing List, in solicitations and contracts for supplies, including purchases over the micropurchase threshold. Use Alternate I in solicitations and contracts for all Federal Supply Schedule Contracts.

Subpart 511.4—Delivery or Performance Schedules

511.401 General.

(a) Other than multiple award schedules. Preferred practice is to state time of delivery in solicitations and contracts as “required” time of delivery or shipment, expressed in specific periods from receipt by the contractor of a notice of award or an order.

(b) Multiple award schedules.

(c) Unusually short delivery times. A requisitioning office that requests an unusually short delivery time must provide satisfactory written justification. A sound justification is particularly important where the time specified is so short that it may limit competition and possibly result in higher prices. Examples of justifications include:

(d) Early delivery. When the requisitioning office needs a portion of the total delivery early, the contracting officer should consider whether to-

(e) Multiple delivery time requirements. If a solicitation contains a mix of items that require different delivery times, the contracting officer must specify the delivery periods separately. When practical, the contracting officer can group items with similar delivery time requirements according to delivery times in the solicitation.

511.404 Contract clauses.

In supply contracts, the contracting officer shall use the clauses as specified in this section.

(a) Shelf-life items. The contracting officer shall use the following clauses in solicitations and contracts that require delivery of shelf-life items within a specified number of months from the date of manufacture or production:

(b) Stock replenishment contracts. The contracting officer shall insert 552.211-81, Time of Shipment, in solicitations and stock replenishment contracts that do not include the Availability for Inspection, Testing, and Shipment/Delivery clause at 552.211-83 and require shipment within 45 calendar days after receipt of the order. If shipment is required in more than 45 days, the contracting officer shall use Alternate I.

(c) Indeterminate testing time. The contracting officer shall insert 552.211-83, Availability for Inspection, Testing, and Shipment/Delivery, in solicitations and contracts that provide for source inspection by Government personnel and that require lengthy testing for which time frames cannot be determined in advance. If the contract is for stock items, the contracting officer shall use Alternate I.

(d) The contracting officer shall insert the clause at 552.211-94, Time of Delivery, in solicitations and contracts for supplies for the Stock Program when neither of the FAR delivery clauses (FAR 52.211-8 or 52.211-9) is suitable.

Subpart 511.6—Priorities and Allocations

511.600 Scope of subpart.

Pursuant to the Defense Priorities and Allocations System (DPAS) Delegation 3, the Department of Commerce (DOC) has delegated to GSA the authority to use the DPAS under certain conditions. DPAS Delegation 3 restricts use of DPAS authority to GSA supply system procurement in support of the Department of Defense (DoD), Department of Energy (DoE), and Federal Emergency Management Agency (FEMA) approved programs.

511.601 [Reserved]

511.602 General.

(a) The purpose of the DPAS is to assure the timely availability of industrial resources to meet current national defense, energy, and civil emergency preparedness program requirements and to provide an operating system to support rapid industrial response in a national emergency. The primary statutory authority for the DPAS is Title I of the Defense Production Act of 1950, as amended, with additional authority from the Selective Service Act of 1948 and the Robert T. Stafford Disaster Relief and Emergency Assistance Act. Executive Orders 12919 and 12742 delegate to the DOC authority to administer the DPAS. Within the DOC, the Office of Strategic Industries and Economic Security (SIES) is assigned responsibility for DPAS implementation, administration, and compliance.

(b) The DPAS is published in the Code of Federal Regulations at 15 CFR part 700. This regulation provides an overview, a detailed explanation of operations and procedures, and other implementing guidance, including information on special priorities assistance and compliance.

(c) Orders placed under DPAS are “rated orders.” Rated orders must receive preferential treatment only as necessary to meet delivery requirements. Rated orders are identified by a rating symbol of either “DX” or “DO” followed by a program identification symbol. All “DO” rated orders have equal priority with each other and take preference over unrated orders. All “DX” rated orders have equal priority with each other and take preference over “DO” rated orders and unrated orders. A program identification symbol indicates which approved program is supported by the rated order.

(d) The authority delegated to GSA shall not be used to support the procurement of any items that—

511.603 Procedures.

(a) A DPAS rating may be placed against an entire contract at time of award or an individual order issued under an existing, otherwise unrated, contract. FAR 11.604 requires contracting officers to insert the provision at 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, in solicitations when the contract or order to be awarded will be a rated order and to insert the clause at 52.211-15, Defense Priority and Allocation Requirements, in contracts that are rated orders.

(b) In addition to the FAR provision and clause referenced in paragraph (a) of this section, the contract or order must include the following (see 15 CFR 700.12):

(c) Multiple and Single Award Schedule contracts are not rated at time of award.

Previous PageTop Of PageTable Of ContentsDFARS Home PageNext Page